• 제목/요약/키워드: Power Plant Park

검색결과 1,376건 처리시간 0.025초

국내 무연탄 발전소 혼소율 변화에 따른 탈황 특성 연구

  • 김정유;박대영;이재헌;문승재
    • 한국전산유체공학회:학술대회논문집
    • /
    • 한국전산유체공학회 2008년도 춘계학술대회논문집
    • /
    • pp.84-87
    • /
    • 2008
  • The sulfur oxides is one of important materials to come about air pollution at thermal plant consuming fossil fuel. The several flue gas desulfurization equipments are installed and operated to decrease sulfur oxides. The flue gas desulfurization of our thermal plant is designed for optimizing flue gas desulfurization technical development and research by Korea Electric Power Research Institute. We operate this desulfurization equipment. Now, our country imports nearly 97 percentage of the energy source and competes with the world for the energy because of the rise of raw materials cost. The fuel cost decrease of power plants is the most important factor of the operation. The fuel used in the experiment is the domestic anthracite from Kangwon Taeback and the bituminous coal from Russia,Taldinsky Mine. This Study is experimental investigations of desulfurization characteristics for domestic anthracite power plant by increasing bituminous coal. We surveyed possible parameters and conducted the performance about desulfurization equipment in Y.D thermal power plant.

  • PDF

66kV XLPE Cable용 조립형 접속함의 개발 (Development of Prefabricated Joint for 66kV Cross Linked Polyethylene Cable.)

  • 오응종;김기영;이준용;박정기
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1999년도 하계학술대회 논문집 E
    • /
    • pp.2123-2125
    • /
    • 1999
  • In recent the XLPE cable has been applied more widely because of its advantages, such as the low-cost and simple installation. For a prefabricated joint, its working time is short, its jointing procedures aγe simple, and its quality control is easy. Electrical performance targets of our developed 66kV cable accessories has been approved through the type test in accordance with IEC publication 840. This paper describes the developmental effort in terms of the design, structure and results of performance verification tests for 66kV XLPE cable system.

  • PDF

The Virtual Reality in Fossil Power Plant Operator Training Simulator

  • Ma, Sam-Sun;Park, Jin-Ho;Oh, Seog-Chan
    • 한국시뮬레이션학회:학술대회논문집
    • /
    • 한국시뮬레이션학회 1999년도 추계학술대회 논문집
    • /
    • pp.197-200
    • /
    • 1999
  • In these days many large scale plants are attempting to use the Virtual Reality technology in the process analysis. Their goal is to reduce the development time by more effective information management as Simultaneous Engineering point of view, and by connecting the CAD datum and all kinds of products information. Generally, it is taken for granted that when a plant is equipped with a Virtual Reality technology, they are able to review the design and analyze the engineering performance of the product before actually building it, so that their goal to reduce costs and enhance the initial quality can be achieved. [1][2] In this paper we will look into the application the virtual reality technology Hadong fossil power plant. And we will also define the concepts of virtual plant by summarizing requirements and thoughts from the people who are in working in the actual site.

  • PDF

원전건설 공급망관리 기술영역 도출을 위한 기초연구 (A Fundamental Research for Technology area of SCM in Korean Nuclear Power Plant Construction)

  • 박항순;김우중;정영환;원서경
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.268-270
    • /
    • 2013
  • The construction project can be defined as a network combined between elements which are engineering, procurement, construction, start-up, and has a plenty of subjects and partners. For the successful project management in construction industry, it is necessary to adopt various management methods, such as lean production, information network system, SCM(Supply Chain Management), which can increase the efficiency of project management. During recent years, even though various management techniques have been applied, the SCM system has not formulated in construction industry. Especially, the Nuclear Power Plant Construction which requires high regulations of the safety and security has not applied SCM. Therefore, this study aimed to propose technology area of SCM in Korean Nuclear Power Plant Construction.

  • PDF

원자력 발전소용 케이블의 제특성에 관한 고찰 (Consideration of characteristic for nuclear power plant cables)

  • 김종원;안용규;박인규;백흠수
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1993년도 하계학술대회 논문집 B
    • /
    • pp.609-611
    • /
    • 1993
  • Because the Nuclear power plant needs for the specific high stability and the confidence, it is required that cable shall be flame retardant at fire and endure to be exposed by radiation, chemical fluid, steam and high temperature at sudden accident condition and be maintained its capability on nomal operation up to 40 years as same as it's service life for Nuclear Power Plant. Consequently, In this report, we describe the terms of Environmental Qualification Test for cable and properties required for cable which developed for Nuclear Power Plant.

  • PDF

Analysis of dismantling process and disposal cost of waste RVCH

  • Younkyu Kim;Sunkyu Park ;TaeWon Seo
    • Nuclear Engineering and Technology
    • /
    • 제55권1호
    • /
    • pp.45-51
    • /
    • 2023
  • During the operation of a nuclear power plant (NPP), the waste reactor vessel closure head (RVCH) that is replaced owing to design or manufacturing defects is buried in a designated area or temporarily stored in a radiation shielding facility within the NPP. In such cases, storing it for extended periods proves a challenge owing to space constraints in the power plant and a safety risk associated with radiation exposure; therefore, dismantling it quickly and safely is crucial. However, not much research has been done on the dismantling of the RVCH in an operational power plant. This study proposes a dismantling process based on the radioactive contamination level measured for the Kori #1 RVCH, which is currently being discarded and stored, and examines the decontamination and cutting according to this process. In addition, the amount of secondary waste and dismantling cost are evaluated, and the dismantling effect of the reactor closure head is analyzed.

신규원전 여유도 관리 방안 연구 (A Study on the method of Margin Management for New Nuclear Power Plant)

  • 박유진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.151-152
    • /
    • 2018
  • In the domestic nuclear power industry, concern about safety of nuclear power plants is continuously increased with the Fukushima nuclear power plant accident. In order to enhance the safety of nuclear power plants, it is important to ensure that the power plants are operating with proper margin within the original design bases. Margin management is the process of ensuring that the NPP designer and operator are aware of the physical and operating limits, and potential and probability of failure, for each component in the plant. All components are subject to margin considerations, but the most important components by scope and attention are those related to safety-related systems and NPP safe shutdown.

  • PDF

Performance Analysis of Gas Turbine for Large-Scale IGCC Power Plant

  • Joo, Yong-Jin;Kim, Mi-Yeong;Park, Se-Ik;Seo, Dong-Kyun
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제2권3호
    • /
    • pp.415-419
    • /
    • 2016
  • As the need for clean coal technology has grown, so has the global research and development efforts into integrated gasification combined cycle (IGCC) plants. An IGCC plant couples a gas turbine to a gasification block. Various technical and economic problems exist in designing such a system. One such problem is the difficulty in realizing economies of scale because the single-train flow capacity of commercial IGCC synthetic gas turbine plants is limited; the capacity does not exceed a net power rating of 300 MW. To address this problem, this study modeled and simulated a synthetic gas turbine with the goal of evaluating the feasibility of a 500 MW or larger IGCC plant. First, a gas turbine with the best output and efficiency was chosen for use with natural gas. The turbine was modeled using GateCycle (a simulation tool), and the integrity of the model validated by comparing the result to the design value. Next, off-design modeling was carried out for a gas turbine with synthetic gas based on its on-design model, and the result was compared with the study result of the gas turbine manufacturer. The simulation confirmed that it is possible to create a large capacity IGCC plant by undertaking the remodeling of a gas turbine designed to use natural gas into one suitable for synthetic gas.

발전 설비 지속 가능 운영 기술 연구 (A Study of the Sustainable Operation Technologies in the Power Plant Facilities)

  • 이창열;박길주;김태환;구영현;이성일
    • 한국재난정보학회 논문집
    • /
    • 제16권4호
    • /
    • pp.842-848
    • /
    • 2020
  • 연구목적: 노후화된 발전기의 지속 가능한 운영을 위하여 효율적이며, 안전한 운영이 중요하다. 효율적 운영이란 경제적 관점이며, 안전한 운영은 발전 설비의 치명적 사고 발생에 대한 발생 이전의 사전 조치를 말한다. 그러므로 발전기의 지속가능 운영 모니터링을 위하여 관련된 센서 설치와 이를 기반으로 지속 가능에 대한 예측할 수 있는 모델에 대한 연구가 필요하다. 연구방법: 전기와 열에 대한 수요 예측, 엔진의 성능과 이상을 탐지하는 예측, 그리고 재 난 안전에 대한 예측 모델을 제시하였다. 이를 위하여 필요한 센서를 정의하였으며, 이를 기반으로 예측 모델을 각각 개발하여 수행하였다. 연구결과: 수요 예측 모델은 기존의 79%에서 90% 이상으로 예측 정확도를 향상시켰으며, 다른 2개 모델도 시스템의 지속가능한 안정적 운영을 지원하였다. 결론: 노후화된 발전설비의 지속가능 운영을 지원하기 위한 3가지 종류의 예측 모델을 개발하고 이를 제이비주식회사의 발전 설비에 실제 적용하여 운영하고 있다.

원자력 발전소용 블레이드링 건전성 평가 (Integrity Assessment of Stationary Blade Ring for Nuclear Power Plant)

  • 박정용;정용근;박종진;강용호
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2004년도 추계학술대회
    • /
    • pp.85-89
    • /
    • 2004
  • The inner side between HP stationary blades in #1 turbine of Nuclear Power Plant A is damaged by the FAC(flow assisted corrosion) which is exposed to moisture. For many years the inner side is repaired by welding the damaged part, however, FAC continues to deteriorate the original material of the welded blade ring. In this study, we have two stages to verify the integrity of stationary blade ring in nuclear power plant A. In the stage I, replication of blade ring is performed to survey the microstructure of blade ring. In the stage II, the stress analysis of blade ring is performed to verify the structural safety of blade ring. Throughout the two stages analysis of blade ring, the stationary blade ring had remained undamaged.

  • PDF