• Title/Summary/Keyword: Power Adjustment

Search Result 373, Processing Time 0.027 seconds

Bearing Pad Temperature Change Depending on the Preload of Vertical Journal Guide Bearing (수직형 저널 베어링에서 preload 변화에 따른 베어링 패드 온도 변화)

  • Kim, Jun-Sung;Kim, Du-Young;Kim, Dong-Kwan;Park, Sang-Ho
    • The KSFM Journal of Fluid Machinery
    • /
    • v.12 no.6
    • /
    • pp.33-40
    • /
    • 2009
  • The temperature of vertical pump bearing metal in the pumped storage power plant has been high enough to shutdown the unit. Attempts such as decreasing the oil supply temperature, increasing the bearing oil gap etc. were performed to resolve the problem, but the issue was not resolved. Finally, the high bearing metal temperature was corrected by adjusting the bearing preload. The preload is formed by the oil wedge between the journal surface and bearing pad surface and the degree of preload is determined by the machined radial clearance, assembled radial clearance, rotor journal diameter etc. This paper focuses on the analysis of the preload depending on the bearing parameters and the result of the modification of the bearing following the analysis. The bearing metal temperature dropped as much as $20^{\circ}C$ which was similar as expected by software calculation. But the shaft vibration could increase when the assembled radial clearance is excessive. So, the adjustment of the bearing preload for the tilting pad type journal bearing should be carefully performed.

Robust Deadbeat Current Control Method for Three-Phase Voltage-Source Active Power Filter

  • Nishida, Katsumi;Ahmed, Tarek;Nakaoka, Mutsuo
    • Journal of Power Electronics
    • /
    • v.4 no.2
    • /
    • pp.102-111
    • /
    • 2004
  • This paper is concerned with a deadbeat current control implementation of shunt-type three-phase active power filter (APF). Although the one-dimensional deadbeat control method can attain time-optimal response of APF compensating current, one sampling period is actually required fur its settling time. This delay is a serious drawback for this control technique. To cancel such a delay and one more delay caused by DSP execution time, the desired APF compensating current has to be predicted two sampling periods ahead. Therefore an adaptive predictor is adopted for the purpose of both predicting the control error of two sampling periods ahead and bringing the robustness to the deadbeat current control system. By adding the adaptive predictor output as an adjustment term to the reference value of half a source voltage period before, settling time is made short in a transient state. On the other hand, in a steady state, THD (total harmonic distortion) of the utility grid side AC source current can be reduced as much as possible, compared to the case that ideal identification of controlled system could be made.

A study on the fitting method for children's spectacles (소아(小兒) 안경(眼鏡)의 fitting에 관(關)한 고찰(考察))

  • Kim, Dae Nyoun
    • Journal of Korean Ophthalmic Optics Society
    • /
    • v.1 no.1
    • /
    • pp.73-84
    • /
    • 1996
  • Satisfactory for children's spectacles fitting can only be achieved with the resonable selection and assortment of frames of different pad shapes, size, materials, the general property of sample frame are flexibility for the temple. Loughness for bridge and variety for the length of temple, a selection of the lens is chosen usually by the characteristic of the power, safty, size and so on, it will be comport fit of frame controlled the hight and width of pad and angle of pad between the nose side, frontal angle of pad will be determinded that whether a frame may be capable of providing a comport fit. An important part of the fitting of spectacles is the final adjustment before the wearer takes them away, and also their continued adjustment to maintain the optimum comport and lens efficiency. It is suggested that spectacle adjustment is essentially a practical art that can only be acquired by continual practice.

  • PDF

Long-Term Trend of Surface Wind Speed in Korea: Anemometer Height Adjustment (한반도 지상 풍속의 장기 추세 분석: 풍속계 고도 보정)

  • Choi, Yeong-Ju;Park, Chang-Hyun;Son, Seok-Woo;Lee, Jae-Won;Hong, Dong-Chan
    • Atmosphere
    • /
    • v.31 no.1
    • /
    • pp.101-112
    • /
    • 2021
  • The long-term trend of surface wind speed in Korea is examined for 31 KMA weather stations from 1985 to 2019. Most stations, except Daegwallyeong, have several times of anemometer height changes from tens of centimeters to several meters. To minimize such height change effect on long-term wind trend, the present study adjusts anemometer height in each station to the standard height of 10 m using the power-law wind profile. This adjustment results in non-negligible trend change. For instance, the increasing surface wind speed at Suwon station, which has six times of anemometer height changes in a range of 0.8 m to 20 m, is weakened up to 67% and becomes statistically insignificant. Likewise, the decreasing trend at Andong station, with three times of anemometer height changes in a range of 10 m to 15.5 m, is weakened up to 66%. A similar weakening in long-term trend is observed in most stations regardless of positive and negative trends. However, due to the cancellation between weakened negative trends and weakened positive trends, the station-averaged wind speed trend in Korea does not change much. This result suggests that anemometer height adjustment is crucial for evaluating local wind speed trend but its impact on nation-wide wind speed trend is rather minor.

A Study on the Method of Optimizing the Test Order of Explosive Detection System Using Analytic Hierarchy Process and Objective Rating (계층분석방법 및 객관적평가법을 활용한 폭발물탐지장비 시험순서 최적화 방법에 관한 연구)

  • Sun-Ju, Won;Hyun Su, Sim;Yong Soo, Kim
    • Journal of Korean Society for Quality Management
    • /
    • v.50 no.4
    • /
    • pp.793-810
    • /
    • 2022
  • Purpose: As improving the search performance of aviation security equipment is considered essential, this study proposes the need for research on how to find an optimized test sequence that can reduce test time and operator power during the search function test of explosive detection systems. We derive the weights and work difficulty adjustment factor required to find the optimized test order. Methods: First, after setting the test factors, the time of each test and the difficulty scale determined by the worker who performed the test directly were used to derive weights. Second, the work difficulty adjustment coefficient was determined by combining the basic weight adjustment factor and corresponding to the body part used by the test using objective rating. Then the final standard time was derived by calculating the additional weights for the changeability of the test factors. Results: The order in which the final standard time is minimized when 50 tests are performed was defined as the optimized order. 50 tests should be conducted without duplication and the optimal order of tests was obtained when compared to previously numbered tests. As a result of minimizing the total standard time by using Excel's solver parameters, it was reduced by 379.14 seconds, about 6.32 minutes. Conclusion: We tried to express it in mathematical formulas to propose a method for setting an optimized test sequence even when testing is performed on other aviation security equipment. As a result, the optimal test order was derived from the operator's point of view, and it was demonstrated by minimizing the total standard time.

Study on load tracking characteristics of closed Brayton conversion liquid metal cooled space nuclear power system

  • Li Ge;Huaqi Li;Jianqiang Shan
    • Nuclear Engineering and Technology
    • /
    • v.56 no.5
    • /
    • pp.1584-1602
    • /
    • 2024
  • It is vital to output the required electrical power following various task requirements when the space reactor power supply is operating in orbit. The dynamic performance of the closed Brayton cycle thermoelectric conversion system is initially studied and analyzed. Based on this, a load tracking power regulation method is developed for the liquid metal cooled space reactor power system, which takes into account the inlet temperature of the lithium on the hot side of the intermediate heat exchanger, the filling quantity of helium and xenon, and the input amount of the heat pipe radiator module. After comparing several methods, a power regulation method with fast response speed and strong system stability is obtained. Under various changes in power output, the dynamic response characteristics of the ultra-small liquid metal lithium-cooled space reactor concept scheme are analyzed. The transient operation process of 70 % load power shows that core power variation is within 30 % and core coolant temperature can operate at the set safety temperature. The second loop's helium-xenon working fluid has a 65K temperature change range and a 25 % filling quantity. The lithium at the radiator loop outlet changes by less than ±7 K, and the system's main key parameters change as expected, indicating safety. The core system uses less power during 30 % load power transient operation. According to the response characteristics of various system parameters, under low power operation conditions, the lithium working fluid temperature of the radiator circuit and the high-temperature heat pipe operation temperature are limiting conditions for low-power operation, and multiple system parameters must be coordinated to ensure that the radiator system does not condense the lithium working fluid and the heat pipe.

Forecasting Day-ahead Electricity Price Using a Hybrid Improved Approach

  • Hu, Jian-Ming;Wang, Jian-Zhou
    • Journal of Electrical Engineering and Technology
    • /
    • v.12 no.6
    • /
    • pp.2166-2176
    • /
    • 2017
  • Electricity price prediction plays a crucial part in making the schedule and managing the risk to the competitive electricity market participants. However, it is a difficult and challenging task owing to the characteristics of the nonlinearity, non-stationarity and uncertainty of the price series. This study proposes a hybrid improved strategy which incorporates data preprocessor components and a forecasting engine component to enhance the forecasting accuracy of the electricity price. In the developed forecasting procedure, the Seasonal Adjustment (SA) method and the Ensemble Empirical Mode Decomposition (EEMD) technique are synthesized as the data preprocessing component; the Coupled Simulated Annealing (CSA) optimization method and the Least Square Support Vector Regression (LSSVR) algorithm construct the prediction engine. The proposed hybrid approach is verified with electricity price data sampled from the power market of New South Wales in Australia. The simulation outcome manifests that the proposed hybrid approach obtains the observable improvement in the forecasting accuracy compared with other approaches, which suggests that the proposed combinational approach occupies preferable predication ability and enough precision.

A Study on Wearing of Rail and Adjustment of Cant in Accordance with Increase in Running Speed of Train (열차운행속도 상승에 따른 레일마모 및 캔트조정 연구)

  • Shin, Gil-Cheol;Joo, Bong-Gyu;Chung, Sung-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1121-1128
    • /
    • 2007
  • Subway routes $1{\sim}4$ were constructed in gravel roadbed track structure in consideration of the technological capabilities, construction cost and duration at the time of the initial construction. As such, 224.8km, approximately 81.2% of entire length, of total length of railway track at 276.9km was constructed on gravel roadbed. However, improvement of gravel roadbed to concreted roadbed began in 1998 due to problems including frequent repair works and limited time application for such works caused by occurrence of tract distortion during operation as well as lowering of roadbed functions and generation of dust caused by frictional power, impact absorption capabilities, abrasion and crushing of gravel on roadbed. Currently, this improvement is continuing with target of converting entire route into concreted roadbed structure. Therefore, this Study modifies formula for setting cant, analyze the correlation between wearing of rail side of the curvature and cant insufficiency following increasing of the running speed of the train, and to present the directions for fundamental review for adjustment of cant insufficiencies at the time of improvement of gravel roadbed to concreted roadbed that is being implemented on the operational tracks of the railway trains.

  • PDF

A Study on Wearing of Rail and Adjustment of Cant in Accordance with Increase in Running Speed of Train (속도 상승에 따른 캔트조정 사례 분석)

  • Shin, Gil-Cheol;Yang, Hoe-Seong;Joo, Bong-Gyu;Chung, Sung-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.151-157
    • /
    • 2008
  • Subway routes $1\sim4$ were constructed in gravel roadbed track structure in consideration of the technological capabilities, construction cost and duration at the time of the initial construction. As such, 224.8km, approximately 81.2% of entire length, of total length of railway track at 276.9km was constructed on gravel roadbed. However, improvement of gravel roadbed to concreted roadbed began in 1998 due to problems including frequent repair works and limited time application for such works caused by occurrence of tract distortion during operation as well as lowering of roadbed functions and generation of dust caused by frictional power, impact absorption capabilities, abrasion and crushing of gravel on roadbed. Currently, this improvement is continuing with target of converting entire route into concreted roadbed structure. Therefore, this Study modifies formula for setting cant, analyze the correlation between wearing of rail side of the curvature and cant insufficiency following increasing of the running speed of the train, and to present the directions for fundamental review for adjustment of cant insufficiencies at the time of improvement of gravel roadbed to concreted roadbed that is being implemented on the operational tracks of the railway trains.

  • PDF

Reducing Peak Cooling Demand Using Building Precooling and Modified Linear Rise of Indoor Space Temperature (건물예냉과 실내온도의 선형상승에 의한 피크냉방수요 저감)

  • Lee, Kyoung-Ho;Yang, Seung-Kwon;Han, Seung-Ho
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.22 no.2
    • /
    • pp.86-96
    • /
    • 2010
  • The paper describes development and evaluation of a simple method for determining gradient of modified linear setpoint variation to reduce peak electrical cooling demand in buildings using building precooling and setpoint adjustment. The method is an approximated approach for minimizing electrical cooling demand during occupied period in buildings and involves modified linear adjustment of cooling setpoint temperature between $26^{\circ}C$ and $28^{\circ}C$. The gradient of linear variation or final time of linear increase is determined based on the cooling load shape in conventional cooling control having a constant setpoint temperature. The potential to reduce peak cooling demand using the simple method was evaluated through building simulation for a calibrated office building model considering four different weather conditions. The simple method showed about 30% and 20% in terms of reducing peak cooling demand and chiller power consumption, respectively, compared to the conventional control.