• Title/Summary/Keyword: Potential Development Area

Search Result 878, Processing Time 0.032 seconds

Development of a Potential Centrality Evaluation Model for Rural villages ( II ) - Application of model by Survey of villages and Analysis using GIS - (농촌마을의 중심성 평가 모형의 개발 (II) - 자료조사 및 GIS분석을 통한 모형의 적용 -)

  • 김대식;정하우
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.44 no.1
    • /
    • pp.81-92
    • /
    • 2002
  • The purpose of this paper, the 2nd stage of this study. is to test the applicability of the potential centrality evaluation model (PCEM) to a case study area. To verify the practical applicabilities of the PCEM, an administrative area of Ucheon-myeon, Hoengseong-gun, Gangwon-do was selected as a study area. Full data on the human environments of total 72 villages within the study area were surveyed. Data on the natural environments were collected through GIS analysis from digital maps developed far this study. The highest PCI (Potential Centrality Index) score was shown at Uhang village of which one being 841 (total score being 1,000), the real single center village of the study area. The evaluation results on potential centeralities of all the villages in the study area would provide decision-makers with more precised information for selection of center villages for development project.

Change in settlement conditions of mountain area in Chungcheong region over a 10 year period : categorization of mountain villages

  • Lee, Bo-Hwi;Kim, Se-Bin;Kim, Uhn Soon
    • Korean Journal of Agricultural Science
    • /
    • v.43 no.1
    • /
    • pp.40-51
    • /
    • 2016
  • This study analyzed settlement condition changes of Chungcheong region's mountain area during 10 years, from 2001 to 2012. We performed factor analysis and cluster analysis of data from the 'Census for Mountain Area' carried out by the Korea Forest Service in 2001 and 2012. Factors 1, 2, 3, and 4 represent 'the superiority of non-agricultural income', 'the industrialized mountainous area', 'residential conveniences and benefits', and 'the use of forest resources', respectively. Clusters 1, 2, 3, 4, and 5 are categorized as 'non-agricultural income', 'various mass social functions', 'production of forest products', 'industrialized mountainous region', and 'ordinary mountain region', respectively. We suggest that cluster 1 has potential for development and should be promoted as a possible tourist attraction by digging up geographically unique themes. Cluster 2 has great potential for development and needs planned management through the maintenance or expansion of existing infrastructure. Cluster 3 has potential for development with various high value added industries uncovered. Cluster 4 shows vitality as it holds plenty of more job opportunities than other regions. Cluster 5 is deteriorating as a mountainous region because of an aging population, and it urgently demands development. For a decade, 45 of the 60 regions belonged to a single category, which are now differentiated broadly into two types: Firstly, deterioration changes to potential development and Secondly, vitality is differentiated into potential development and deterioration.

Analysis of Development Project Conditions and Potential Demand Characteristics in High-Speed Rail Station Areas (전국 고속철도 역세권의 개발 사업여건 및 잠재수요 특성 분석)

  • Bae, Seong-Ho;Ma, Kang-Rae;Kim, Chan-Ho
    • Journal of the Korean Regional Science Association
    • /
    • v.40 no.2
    • /
    • pp.75-89
    • /
    • 2024
  • As the problem of lowering the efficiency of urban services in small and medium-sized cities in the non-metropolitan area intensifies, the necessity of developing a railway station area is being emphasized to form a compressed urban space through regional bases. Although major station areas in large cities are being developed in the form of complex, the analysis of the development location characteristics of the small and medium-sized city station areas is insufficient. The purpose of this study is to analyze the characteristics of development project conditions and potential demand in the high-speed rail station areas across the country, identify the differences in locational characteristics according to the type of city, such as 'metropolitan city', 'large city in non-metropolitan city', 'medium and small city in non-metropolitan city', and find out the appropriate development method. As a result of the analysis, it was analyzed that the 'metropolitan area metropolitan area' has high potential demand and poor business conditions. On the other hand, in the case of the non-metropolitan area, it was analyzed that the 'small and medium-sized city station area' has good business conditions and low potential demand characteristics, and the 'large city station area' has intermediate characteristics. This suggests the need for different development methods in the development of metropolitan and small and medium-sized city station areas. The analysis results of this study show that it is desirable to encourage private participation in large-scale metropolitan station areas, which require large-scale input, to maximize potential demand, and to encourage private participation through public-led projects based on favorable business conditions or development based on regional characteristics.

GIS Analysis on Siting Strategy of Offshore Wind Farm (해상풍력단지 입지전략 GIS 분석)

  • Song, Kyu-Bong;Kim, Hyun-Goo
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.06a
    • /
    • pp.460-462
    • /
    • 2009
  • This study has analyzed the scale, location, resource potential and feasibility of offshore wind farm scientifically and systematically based on the national wind map and GIS (Geographic Information System). For long-term wind power development, this study pursues siting strategy building, selection of target area and deciding development priority as well as the presenting a basis for assessment that are necessary for policy decision making by making theme layers under GIS environment. According to the analysis after organizing technological development by stages, even if only the most suitable sites are developed among the area of offshore wind farm candidates that can be developed under the current technological standard, it has been evaluated as being able to develop about 3 times of the wind power dissemination target until 2012. It is expected that about 5% of territorial water area can be developed in a short-term future while the southern offshore area possessing relatively favorable wind resource than the western offshore has been identified as the most feasible site. While about 23% of territorial water area has been classified as potential area for offshore wind farm development in a long-term future, even Jeju Island and offshore of Ulsan possessing excellent wind resource have been analyzed as feasible sites. The feasibility assessment of offshore wind farm development established by this study is expected to assist national strategy building for accomplishing the wind power dissemination target.

  • PDF

Development of Global Natural Vegetation Mapping System for Estimating Potential Forest Area (全球의 潛在的 森林面積을 推定하기 위한 植生圖 製作시스템 開發)

  • Cha, Gyung Soo
    • The Korean Journal of Ecology
    • /
    • v.19 no.5
    • /
    • pp.403-416
    • /
    • 1996
  • Global natural vegetation mapping (GNVM) system was developed for estimating potential forest area of the globe. With input of monthly mean temperature and monthly precipitation observed at weather stations, the system spherically interpolates them into 1°×1°grid points on a blobe, converts them into vegetation types, and produces a potential vegetation map and a potenital vegetation area. The spherical interpolation was based on negative exponential function fed from the constant radius stations with oval weighing method which is latitudinally elongated weighing in temperature and longitudinally elongated weighing in precipitation. The temperature values were corrected for altitude by applying a linear lapse-rate (0.65℃ / 100m) with reference to a built-in digital terrain map of the globe. The vegetation classification was based upon Koppen’s sKDICe. The potential forest area is estimated for 6.96 Gha (46.24%) of the global land area (15.05 Gha).

  • PDF

The Integration of GIS with LANDSAT TM Data for Groundwater Potential Area Mapping(II) - Suitablility Mapping for Groundwater Exploration Using the Geographic Infornation System - (지하수 부존 가능지역 추출을 위한 LANDSAT TM 자료와 GIS의 통합(II) - 지하정보시스템에 의한 지하수 부존 가능성의 suitability map 작성 -)

  • 지광훈
    • Korean Journal of Remote Sensing
    • /
    • v.8 no.1
    • /
    • pp.45-58
    • /
    • 1992
  • The study is aimed at extraction of the groundwater potential area using the Geographic Information System. The study was to develop techniques of the thematic mapping such as slope map, geologic map, soil map and suitability mapping for grotential area. There thematic maps were combined and weightages were given to produce suitability map for groundwater potential area. The results of this study are as follows. 1) The 78% of cased wells have releation to lineament coincided with the appraisement point of the suitability map. 2) The 9 sites of 18 test sites produced over than 200 m$^3$/day. The with the highest appraisement point of the suitability map. 3) Suitability map is effective to extract groundwater potential area which can not be extracted from the remotely sensed data. The developed suitability mapping techniques are expected to do as an important tool for exploration and development of the newable and unnewable resources such as groundwater, petroleum etc.

Analysis and Management of Potential Development Area Using Factor of Change from Forest to Build-up (산림의 시가지 변화요인을 통한 잠재개발지 분석 및 관리방안)

  • LEE, Ji-Yeon;LIM, No-Ol;LEE, Sung-Joo;CHO, Hyo-Jin;SUNG, Hyun-Chan;JEON, Seong-Woo
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.25 no.2
    • /
    • pp.72-87
    • /
    • 2022
  • For the sustainable development and conservation of the national land, planned development and efficient environmental conservation must be accompanied. To this end, it is possible to induce development and conservation to harmonize by deriving factors affecting development through analysis of previously developed areas and applying appropriate management measures to areas with high development pressure. In this study, the relationship between the area where the land cover changed from forest to urbanization and various social, geographical, and restrictive factors was implemented in a regression formula through logistic regression analysis, and potential development sites were analyzed for Yongin City. The factor that has the greatest impact on the analysis of potential development area is the restrict factors such as Green Belt and protected areas, and the factor with the least impact is the population density. About 148km2(52%) of Yongin-si's forests were analyzed as potential development area. Among the potential development sites, the area with excellent environmental value as a protected area and 1st grade on the Environment Conservation Value Assessment Map was derived as about 13km2. Protected areas with high development potential were riparian buffer zone and special measurement area, and areas with excellent natural scenery and river were preferred as development areas. Protected areas allow certain actions to protect individual property rights. However, there is no clear permit criteria, and the environmental impact of permits is not understood. This is identified as a factor that prevents protected areas from functioning properly. Therefore, it needs to be managed through clear exception permit criteria and environmental impact monitoring.

Estimation of Urban Heat Island Potential Based on Land-Use Type in Summertime of Daegu (대구의 토지이용도 유형에 따른 여름철 도시열섬포텐셜 추정연구)

  • Ahn, Ji-Suk;Kim, Hae-Dong;Kim, Sang-Woo
    • Journal of Environmental Science International
    • /
    • v.16 no.1
    • /
    • pp.65-71
    • /
    • 2007
  • This study aims to estimate a urban heat island potential distribution based on the land-use types using Landsat TM(1100 LST August 2004) and AWS data in Daegu. The heat island potential is defined as a difference between surface temperature and air-temperature at each place. The study area was selected as about $900km^2$ square including Daegu metropolitan area. Land-use data obtained by dividing all of Daegu metropolitan area in- to 1-km-square three types of maps were prepared in the 1960s, 1970s and 2000s respectively. Land-use types were classified into 5 categories. Forest and farm lands have been reduced at a wide range during 40 years. Most of those changed into urban area. The heat island potential distribution presented a striking contrasts according to land-use types. For example, the heat island potential of urban area was higher than $10^{\circ}C$ in comparison to those of water or paddy rice areas.

An Analysis of Agricultural Landuse Suitability Using Landuse Limitation Factors - A Case Study of Ibang-myeon, Changnyeong-gun, Kyungsangnam-do - (토지이용 제한인자를 활용한 농업적 토지이용 적합성 분석 - 경상남도 창녕군 이방면을 대상으로 -)

  • Jang, Gab-Sue;Park, In-Hwan
    • Journal of Environmental Impact Assessment
    • /
    • v.15 no.6
    • /
    • pp.357-372
    • /
    • 2006
  • The excessive land activities in farming can cause soil erosion, inundation by a flood, and fallow. So far land evaluation has been analyzed using the land use limitation derived from the excessive land activities. This study was done for evaluating the agricultural fields by using 3 land use limitations, inundation potential, soil erodibility potential, and fallow potential. The study area is Ibang-myeon, Changnyeong-gun, Gyeongnam-province, Korea. A logistic regression model was applied to recognize the inundation potential by a flood in the Nakdong river basin. And potential soil erodibility index (PSEI) was derived from USLE model to analyze the soil erodibility potential. And a probability model from a logistic regression model was applied to detect the fallow potential. Therefore, we found 220.7ha for the 4th grade and 86.1ha for the 5th grade was analyzed as water damage potential. Large area near Nakdong river have problem to grow the rice due to the damage by water inundation. And 213.6ha for the 3rd grade and 103.3ha for 4th grade was detected as a result of the analysis of soil erosion potential. The soil erosion potential was high when within-field integrity of soil was not stable, or the kinetic energy was high or the slope length was long due to a steep slope of a specific land. And 869.1ha for 3rd grade, 174.9ha for 4th grade, and 110.6ha for 5th grade was detected to be distributed having the fallow potential. Especially, a village, having a steep mountain, had 249.5ha for the 3rd grade, which was 28.7% of total area showing the 3rd grade. Finally, Three villages, including An-ri, Geonam-ri, Songgok-ri, showed they had largest area of the suitable land in the study area. These villages had similar topographic condition where they were far from Nakdong river, and they had relatively higher elevation and flat lands.

Development of Potential Function Based Path Planning Algorithm for Mobile Robot

  • Lee, Sang-Il;Kim, Myun-Hee;Oh, Kwang-Seuk;Lee, Sang-Ryong
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.2325-2330
    • /
    • 2005
  • A potential field method for solving the problem of path planning based on global and local information for a mobile robot moving among a set of stationary obstacles is described. The concept of various method used path planning is used design a planning strategy. A real human living area is constructed by many moving and imminence obstacles. Home service mobile robot must avoid many obstacles instantly. A path that safe and attraction towards the goal is chosen. The potential function depends on distance from the goal and heuristic function relies on surrounding environments. Three additional combined methods are proposed to apply to human living area, calibration robots position by measured surrounding environment and adapted home service robots. In this work, we proposed the application of various path planning theory to real area, human living. First, we consider potential field method. Potential field method is attractive method, but that method has great problem called local minimum. So we proposed intermediate point in real area. Intermediate point was set in doorframe and between walls there is connect other room or other area. Intermediate point is very efficiency in computing path. That point is able to smaller area, area divided by intermediate point line. The important idea is intermediate point is permanent point until destruction house or apartment house. Second step is move robot with sensing on front of mobile robot. With sensing, mobile robot recognize obstacle and judge moving obstacle. If mobile robot is reach the intermediate point, robot sensing the surround of point. Mobile robot has data about intermediate point, so mobile robot is able to calibration robots position and direction. Third, we gave uncertainty to robot and obstacles. Because, mobile robot was motion and sensing ability is not enough to control. Robot and obstacle have uncertainty. So, mobile robot planed safe path planning to collision free. Finally, escape local minimum, that has possibility occur robot do not work. Local minimum problem solved by virtual obstacle method. Next is some supposition in real living area.

  • PDF