• Title/Summary/Keyword: Post-environmental Impact Assessment

Search Result 84, Processing Time 0.027 seconds

A Study on the Method of Implementation Assessment for Total Maximum Daily Load Management (수질오염총량관리를 위한 효율적 이행평가방안 연구)

  • Park, Jun-Dae;Park, Ju-Hyun;Rhew, Doug-Hee;Jeong, Dong-Hwan
    • Journal of Environmental Impact Assessment
    • /
    • v.17 no.2
    • /
    • pp.125-132
    • /
    • 2008
  • It is desirable that implementation assessment (IA) should be carried out efficiently in order to make successful progress of Total Maximum Daily Load (TMDL) in watershed management. There are many difficulties in the process of the implementation assessment because of the early stage in the application of TMDL in Korea. This study reviewed the present status of IA and proposed the methodology of its improvement such as flexible application of TMDL ledger, and standardization of assessment index and criteria. The deficient time for assessment period could be corrected by the consideration of the post-procedure after the submission of IA report.

Study on the Standard Guideline of Environmental Impact Assessment Focusing on Light Pollution (빛공해 분야의 환경영향평가 지침 표준화 연구)

  • Yun, Hee-Kyung;Choi, Tae-Bong;Kim, Bu-Kyung;Kim, Hoon
    • Journal of Environmental Impact Assessment
    • /
    • v.28 no.1
    • /
    • pp.63-70
    • /
    • 2019
  • Artificial lighting is an essential part, but it causes light pollution due to unnecessary or excessive use of light. Light pollution has negative effects such as power waste, adverse health effects, destruction of the ecosystem. But currently, light pollution is managed only post-management. The purpose of this study is to standardize methods of environmental impact assessment focusing on light pollution to effectively manage and reduce the negative effect of areas that may cause light pollution in advance.

Effects on Water Quality in the Development and the Comparative Analysis of Water Quality Results in Post-environmental Impact Investigation - Focused on a Quarry Mine and Sports Facilities - (개발 사업에 의한 수질영향조사 및 사후환경영향조사 수질결과에 대한 비교·분석 -토석채취사업 및 체육시설 조성사업을 중심으로-)

  • Lee, Seyong;Roh, Younghee;Cho, Hanna;Maeng, Junho
    • Journal of Environmental Impact Assessment
    • /
    • v.26 no.6
    • /
    • pp.524-537
    • /
    • 2017
  • Post-Environmental impact investigation(Post-EII) plays an important role in investigating and reducing the environmental impacts of construction operations in South Korea. To date, it has been estimated that the results for Post-EII showed the low reliability; however, understanding those reliability has rarely been studied. We investigated the effect on water qualities by construction operations of the quarry mine, training center, and golf club in South Korea. In addition, the results of water quality analysis in this study were compared and analyzed with those in Post-EII. Treated wastewater in a quarry mine showed high concentrations of biochemical oxygen demand(BOD), suspended solid(SS), total nitrogen(T-N), and total phosphorus(T-P). Compared with the water quality results between this study and Post-EII, the concentrations of BOD, SS, T-N, and T-P in the treated wastewater were higher than the interquartile range(IQR) as well as the range of the results from minimum to maximum in Post-EII(p<0.05). The concentrations of BOD, SS, T-N, and T-P in treated wastewater were high under constructions in a training center. The concentrations of BOD and SS exceeded the consultation standard for the treated wastewater. These concentrations showed the significant difference with the IQR and the range from minimum to maximum of the water quality results in Post-EII(p<0.05). Therefore, the management and monitoring for water quality should be conducted in the treated wastewater by of construction operations. In addition, the alternative to enhance the reliability for the water quality results should be sought in Post-EII.

Establishment on Management Plan of Environmental Noise with Noise Map (소음지도를 활용한 환경소음 관리계획 수립)

  • Sun, Hyosung
    • Journal of Environmental Impact Assessment
    • /
    • v.20 no.2
    • /
    • pp.123-131
    • /
    • 2011
  • The objective of this study is to prepare the effective management plan of environmental noise with a noise map, and the guideline on the management plan of environmental noise was suggested through the review of existing application examples. The management plan of environmental noise with a noise map includes the practical contents in the stages of subdivision of management areas, establishment of reduction measures, opinion collection, post investigation, and reformulation of management plan. First, the classification of management regions is performed considering the excess degree of noise standard and the facility type in the phase of subdivision of management areas. Second, the optimal management plan is established through the investigation of regional characteristics and various noise reduction measures in the phase of establishment of reduction measures, which includes the examination of noise reduction effects with a noise map and the budget planning with the costing of noise reduction measures. Third, the opinion survey with a local resident and a expert is carried out in order to prove the validity of the management plan in the phase of opinion collection, and the management plan is modified with gathered opinions. Fourth, the post examination plan with noise measurement is performed in order to verify the real effect of noise reduction measures according to the management plan in the phase of post investigation. Finally, the amendment of the management plan as well as the improvement of a noise map is carried out at a regular cycle in the phase of reformulation of management plan.

A Study on Water Network Modeling System Based Upon GIS (지리정보시스템 기반의 상수관망 모델링 시스템 연구)

  • Kim, Joon-Hyun;Yakunina, Natalia
    • Journal of Environmental Impact Assessment
    • /
    • v.19 no.3
    • /
    • pp.315-321
    • /
    • 2010
  • ArcView and water network models have been integrated to develop the water network modeling system based upon GIS. To develop this system, pre, main, and post processing systems are required. GIS programming technique was adopted by using the ArcView's script language Avenue. The input data of models have been prepared by using the AutoCAD Map3D through the conversion of modeling input data to GIS data for A city. The modeling has been implemented by using EPANET, WaterCAD, InfoWorks. To develop the post processing system, the modeling results of the water network models have been analyzed by using GIS. During the application process of the developed system to B city with 300,000 population, main problems were found in the constructed GIS DB of that city. Thus, pilot study area of B city has been constructed, and pre-, main, and post-processing techniques were invented based upon GIS. Finally, the problems related to waterworks GIS projects in Korea were discussed and solutions were suggested.

Consistency Analysis between Predicted and Measured PM10 and NO2 Air Quality During Environmental Impact Assessment of Linear Construction Projects (선형사업에 대한 환경영향평가 시 대기질 예측치와 실측치의 정합성 분석 - PM10과 NO2를 중심으로 -)

  • No Ol, Lim;Hyun Chan, Sung;Sun Jeong, Kim;Ji Young, Kim;Seong Woo, Jeon
    • Journal of Environmental Impact Assessment
    • /
    • v.31 no.6
    • /
    • pp.378-387
    • /
    • 2022
  • Since air pollution has become a global issue to be managed, the Republic of Korea (ROC) is protecting air quality by predicting the air condition before a construction project starts through EnvironmentalImpact Assessment (EIA) and measuring the air condition afterwards the construction project ends through Post-environmental Impact Assessment (PEIA). The aim of this study consists on verifying the predicted and measured concentration data and analyzing their consistency in order to deduce improvement directions. Linear EIA projects which the investigation during operation period have been concluded between years 2017 and 2019 were used. As a result, the following improvement directions were suggested: reduction of EIA air quality standards, strengthen the management of projects with construction duration longer than 5 years, incorporation of first or second quarter (winter or spring) into the investigation period, consideration of construction equipment or conditions for better prediction. The strength of this study is that we arranged and utilized EIA predicted and PEIA measured data to understand the present EIA procedure and made meaningful suggestions through the consistency analysis contributing to air quality maintenance and investigation methodology enhancement.

Studies on Establishing an Effective System for the Management after Construction in the EIA Process (사후환경관리시스템을 통한 사후관리의 실효성 확보)

  • Maeng, Jun-Ho;Joo, Yong-Joon
    • Journal of Environmental Impact Assessment
    • /
    • v.17 no.1
    • /
    • pp.57-66
    • /
    • 2008
  • Follow-up process consists of two steps. First, it monitors whether project proponents comply with reviews made by KEI. The second steps is to survey environmental impacts during and after implementation of the proposed action. The follow-up requires the proper participation of stakeholders: project proponents, compliance monitors, impact monitors, and environmental agencies approving and reviewing said projects. Currently, follow-up process does not work well because each stakeholder does not play his proper role for various reasons such as mutual distrust among stakeholders and problems associated with institutional settings. This study intends to improve effectiveness of follow-up process and, ultimately, to improve quality of EIA in Korea by devising a follow-up system that delineates clear roles and build a strong network among stakeholders. In order to do so, the study identifies current problems associated with follow-up process and examines basic concepts and procedures involved in it. Secondly, it analyzes relational dynamics among stakeholders to identify what's behind the current mutual distrust. Third, it proposes a way to delineate clear roles to each stakeholder so that follow-up process runs efficient as an organic network.

A Study on the Environmental Assessment Guideline for Tidal Current Energy Development (조류발전 사업의 환경평가 가이드라인 연구)

  • Kim, Tae-Yun;Park, Jeong-Il;Maeng, Jun-Ho
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.20 no.4
    • /
    • pp.345-357
    • /
    • 2014
  • This study aims to develop a guideline of environmental assessment for tidal current energy development in Korea. Based on an extensive discussion of the environmental effects of tidal current energy, this study provides an appropriate guideline for environmental assessment on tidal current energy development in Korea. The guideline includes a method for proper site selection and specific techniques for environmental impact assessment. The guideline for environmental impact assessment consists of four steps - including current condition investigation, impact predictions, identification and incorporation of mitigation measures, and post environmental monitoring - to effectively predict and assess impacts of tidal current energy development on the ocean environment. It is expected that the guideline can facilitate the often demanding environmental assessment review process and to reduce the time taken for it.

Study of Radon Management in the Environmental Impact Assessment Stage (환경영향평가 단계에서의 라돈 관리에 대한 연구)

  • Kim, Im-Soon;Oh, Hong-Sok;Lee, Kwan-Hyung;Kim, Choong-Gon
    • Journal of Environmental Impact Assessment
    • /
    • v.27 no.3
    • /
    • pp.241-250
    • /
    • 2018
  • Recently, negative effects on human health such as disease caused by harmful environment have been dealt with seriously. In particular, studies on the effect of radon exposure, which is known as a primary carcinogen in lung cancer due to radioactive materials, have been actively studied. In Korea, since January 1, 2018, radon measurement is mandatory when building a new apartment, so it is necessary to measure the radon concentration and submit it to the local government and it should be posted where residents can see it. Radon has only recommended standards for multi-use facilities, but now it has decided to set recommendation standards for private homes. Therefore, it should now be possible to manage the radon in the environmental impact assessment phase as well as in the Post-environmental Impact Assessment. It should be possible to share health information such as the radon concentration and the risk of radon, and participation of health experts in the environmental impact assessment stage is required. Soil, air quality, hygiene and aerial items should be improved to take into account the effects of radon on human health during the environmental impact assessment process. If the level value of conncentration of radon shows above the recommended level, then alternative measures should be prepared and mitigation measures should be prepared as well.

Correlation Analysis on $CO_2$ Emission and Cost of Energy Resources and Life Cycle Assessment (에너지자원의 이산화탄소 배출량과 비용의 상관관계 분석과 전과정평가)

  • Kim, Heetae;Kim, Eun Chul;Ahn, Tae Kyu
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.06a
    • /
    • pp.153-153
    • /
    • 2010
  • The world is moving towards a post-carbon society and needs clean and renewable energy for sustainable development. There are many methodological approaches which are helping this shift based on analyzed data about energy resources and which focus on limited types of energy including liquid fossil, solid fossil, gaseous fossil, and biomass (e.g. IPCC Guidelines, ISO 14064-1, WRI Protocol, etc.). We should also consider environmental impact (e.g. greenhouse gas emissions, water use, etc.) and the economic cost of the renewable energy to make a better decision. Recently, researchers have addressed the environmental impact of new technologies which include photovoltaics, wind turbines, hydroelectric power, and biofuel. In this work, we analyze the environmental impact with a carbon emission factor to present a correlation between $CO_2$ emission and the cost of energy resources standardized by the energy output. In addition, we reviewed Life Cycle Assessment (LCA) as another methodology. Researchers who are studying energy systems have ignored the impacts of entire energy systems, e.g. the extraction and processing of fossil fuels. In power sector, the assessment should include extraction, processing, and transportation of fuels, building of power plants, production of electricity, and waste disposal. Therefore LCA could be more suitable tool for energy cost and environmental impact estimation.

  • PDF