• Title/Summary/Keyword: Portal zone

Search Result 24, Processing Time 0.02 seconds

Schistosoma mansoni-Related Hepatosplenic Morbidity in Adult Population on Kome Island, Sengerema District, Tanzania

  • Kaatano, Godfrey M.;Min, Duk-Young;Siza, Julius E.;Yong, Tai-Soon;Chai, Jong-Yil;Ko, Yunsuk;Chang, Su-Young;Changalucha, John M.;Eom, Keeseon S.;Rim, Han-Jong
    • Parasites, Hosts and Diseases
    • /
    • v.53 no.5
    • /
    • pp.545-551
    • /
    • 2015
  • Schistosomiasis is one of the important neglected tropical diseases (NTDs) in Tanzania, particularly in Lake Victoria zone. This baseline survey was a part of the main study of integrated control of schistosomiasis and soil-transmitted helminths (STHs) aimed at describing morbidity patterns due to intestinal schistosomiasis among adults living on Kome Island, Sengerema District, Tanzania. Total 388 adults from Kome Islands (about 50 people from each village) aged between 12 and 85 years, were examined by abdominal ultrasound according to the Niamey protocol. Liver image patterns (LIPs) A and B were considered normal, and C-F as distinct periportal fibrosis (PPF). The overall prevalence of PPF was 42.2%; much higher in males than in females (47.0% in male vs 34.4% in females, P=0.007). Abnormal increase of segmental branch wall thickness (SBWT) and dilated portal vein diameter (PVD) were also more common in males than in females. Hepatosplenomegaly was frequently encountered; 68.1% had left liver lobe hepatomegaly and 55.2% had splenomegaly. Schistosoma mansoni-related morbidity is quite high among adults in this community justifying the implementation of integrated control strategies through mass drug administration, improved water supply (pumped wells), and health education that had already started in the study area.

Estimation of GHG emissions and footprint from Daecheong Reservoir using G-res Tool

  • Min, Kyeongseo;Kim, Dongmin;Chung, Sewoong
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.209-209
    • /
    • 2022
  • Reservoirs play a key role in the carbon cycle between terrestrial and marine systems and are pathways that release greenhouse gases(GHGs), CO2, CH4, and N2O, into the atmosphere by decomposing organic matters. Developed countries have been actively conducting research on carbon emission assessment of dam reservoirs for over 10 years under the leadership of UNESCO/IHA, but associated research is very rare in Korea. In particular, the GHGs footprint evaluation, which calculates the change in net carbon emission considering the watershed environment between pre- and post- impoundment, is very important in evaluating the carbon emission of hydroelectric dams. The objective of this study was to estimate the GHG emissions and footprints in Daecheong Reservoir using the G-res Tool, an online platform developed by UNESCO/IHA. The G-res Tool estimates CO2 and CH4 emissions in consideration of diverse pathway fluxes of GHGs from the reservoir and characterizes changes in GHG fluxes over 100 years based on the expected lifetime of the dam. The input required to use the G-res Tool include data related to watersheds, reservoirs, and dams, and most were collected through the government's public portal. As a result of the study, the GHG footprint of Daecheong Reservoir was estimated to be 93 gCO2eq/m2/yr, which is similar to that of other reservoirs around the world in the same climate zone. After impoundment, the CH4 diffusion emission from the reservoir was 73 gCO2eq/m2/yr, also similar to those of the overseas reservoirs, but the CH4 bubbling emission, degassing emission, and CO2 diffusion emissions were 44, 34, 252 gCO2eq/m2/yr, respectively, showing a rather high tendency. Since the dam reservoir carbon footprint evaluation is essential for the Clean Development Mechanism evaluation of hydroelectric power generation, continuous research is needed in the future. In particular, experimental studies that can replace the emission factors obtained from the overseas dam reservoirs currently used in the G-res Tool should be promoted.

  • PDF

Numerical analysis of pre-reinforced zones in tunnel considering the time-dependent grouting performance (터널 사전보강영역의 경시효과를 고려한 수치해석 기법에 관한 연구)

  • Song, Ki-Il;Kim, Joo-Won;Cho, Gye-Chun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.9 no.2
    • /
    • pp.109-120
    • /
    • 2007
  • Auxiliary support systems such as the reinforced protective umbrella method have been applied before tunnel excavation to increase ground stiffness and to prevent the large deformation. However, determination procedure of geotechnical parameters along the construction sequence contains various errors. This study suggests a method to characterize the time-dependent behavior of pre-reinforced zones around the tunnel using elastic waves. Experimental results show that shear strength as well as elastic wave velocities increase with the curing time. Shear strength and strength parameters can be uniquely correlated to elastic wave velocities. Obtained results from the laboratory tests are applied to numerical simulation of tunnel considering its construction sequences. Based on numerical analysis, initial installation part of pre-reinforcement and portal of tunnel are critical for tunnel stability. Result of the time-dependent condition is similar to the results of for $1{\sim}2$ days of the constant time conditions. Finally, suggested simple analysis method combining experimental and numerical procedure which considering time-dependent behavior of pre-reinforced zone on tunnel would provide reliable and reasonable design and analysis for tunnel.

  • PDF

Study on collapse mechanism and treatment measures of portal slope of a high-speed railway tunnel

  • Guoping Hu;Yingzhi Xia;Lianggen Zhong;Xiaoxue Ruan;Hui Li
    • Geomechanics and Engineering
    • /
    • v.32 no.1
    • /
    • pp.111-123
    • /
    • 2023
  • The slope of an open cut tunnel is located above the exit of the Leijia tunnel on the Changgan high-speed railway. During the excavation of the open cut tunnel foundation pit, the slope slipped twice, a large landslide of 92500 m3 formed. The landslide body and unstable slope body not only caused the foundation pit of the open cut tunnel to be buried and the anchor piles to be damaged but also directly threatened the operational safety of the later high-speed railway. Therefore, to study the stability change in the slope of the open cut tunnel under heavy rain and excavation conditions, a 3D numerical calculation model of the slope is carried out by Midas GTS software, the deformation mechanism is analyzed, anti-sliding measures are proposed, and the effectiveness of the anti-sliding measures is analyzed according to the field monitoring results. The results show that when rainfall occurs, rainwater collects in the open cut tunnel area, resulting in a transient saturation zone on the slope on the right side of the open cut tunnel, which reduces the shear strength of the slope soil; the excavation at the slope toe reduces the anti-sliding capacity of the slope toe. Under the combined action of excavation and rainfall, when the soil above the top of the anchor pile is excavated, two potential sliding surfaces are bounded by the top of the excavation area, and the shear outlet is located at the top of the anchor pile. After the excavation of the open cut tunnel, the potential sliding surface is mainly concentrated at the lower part of the downhill area, and the shear outlet moves down to the bottom of the open cut tunnel. Based on the deformation characteristics and the failure mechanism of the landslides, comprehensive control measures, including interim emergency mitigation measures and long-term mitigation measures, are proposed. The field monitoring results further verify the accuracy of the anti-sliding mechanism analysis and the effectiveness of anti-sliding measures.