• Title/Summary/Keyword: Polynomial-time Algorithm

Search Result 332, Processing Time 0.025 seconds

Short-term Scheduling Optimization for Subassembly Line in Ship Production Using Simulated Annealing (시뮬레이티드 어닐링을 활용한 조선 소조립 라인 소일정계획 최적화)

  • Hwang, In-Hyuck;Noh, Jac-Kyou;Lee, Kwang-Kook;Shin, Jon-Gye
    • Journal of the Korea Society for Simulation
    • /
    • v.19 no.1
    • /
    • pp.73-82
    • /
    • 2010
  • Productivity improvement is considered as one of hot potato topics in international shipyards by the increasing amount of orders. In order to improve productivity of lines, shipbuilders have been researching and developing new work method, process automation, advanced planning and scheduling and so on. An optimization approach was accomplished on short-term scheduling of subassembly lines in this research. The problem of subassembly line scheduling turned out to be a non-deterministic polynomial time problem with regard to SKID pattern’s sequence and worker assignment to each station. The problem was applied by simulated annealing algorithm, one of meta-heuristic methods. The algorithm was aimed to avoid local minimum value by changing results with probability function. The optimization result was compared with discrete-event simulation's to propose what pros and cons were. This paper will help planners work on scheduling and decision-making to complete their task by evaluation.

Key Recovery Algorithm from Randomly-Given Bits of Multi-Prime RSA and Prime Power RSA (비트 일부로부터 Multi-Prime RSA와 Prime Power RSA의 개인키를 복구하는 알고리즘)

  • Baek, Yoo-Jin
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.26 no.6
    • /
    • pp.1401-1411
    • /
    • 2016
  • The Multi-Prime RSA and the Prime Power RSA are the variants of the RSA cryptosystem, where the Multi-Prime RSA uses the modulus $N=p_1p_2{\cdots}p_r$ for distinct primes $p_1,p_2,{\cdots},p_r$ (r>2) and the Prime Power RSA uses the modulus $N=p^rq$ for two distinct primes p, q and a positive integer r(>1). This paper analyzes the security of these systems by using the technique given by Heninger and Shacham. More specifically, this paper shows that if the $2-2^{1/r}$ random portion of bits of $p_1,p_2,{\cdots},p_r$ is given, then $N=p_1p_2{\cdots}p_r$ can be factorized in the expected polynomial time and if the $2-{\sqrt{2}}$ random fraction of bits of p, q is given, then $N=p^rq$ can be factorized in the expected polynomial time. The analysis is then validated with experimental results for $N=p_1p_2p_3$, $N=p^2q$ and $N=p^3q$.

Motion Vector Based Overlay Metrology Algorithm for Wafer Alignment (웨이퍼 정렬을 위한 움직임 벡터 기반의 오버레이 계측 알고리즘 )

  • Lee Hyun Chul;Woo Ho Sung
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.12 no.3
    • /
    • pp.141-148
    • /
    • 2023
  • Accurate overlay metrology is essential to achieve high yields of semiconductor products. Overlay metrology performance is greatly affected by overlay target design and measurement method. Therefore, in order to improve the performance of the overlay target, measurement methods applicable to various targets are required. In this study, we propose a new algorithm that can measure image-based overlay. The proposed measurement algorithm can estimate the sub-pixel position by using a motion vector. The motion vector may estimate the position of the sub-pixel unit by applying a quadratic equation model through polynomial expansion using pixels in the selected region. The measurement method using the motion vector can calculate the stacking error in all directions at once, unlike the existing correlation coefficient-based measurement method that calculates the stacking error on the X-axis and the Y-axis, respectively. Therefore, more accurate overlay measurement is possible by reflecting the relationship between the X-axis and the Y-axis. However, since the amount of computation is increased compared to the existing correlation coefficient-based algorithm, more computation time may be required. The purpose of this study is not to present an algorithm improved over the existing method, but to suggest a direction for a new measurement method. Through the experimental results, it was confirmed that measurement results similar to those of the existing method could be obtained.

Interconnection Problem among the Dense Areas of Nodes in Sensor Networks (센서네트워크 상의 노드 밀집지역 간 상호연결을 위한 문제)

  • Kim, Joon-Mo
    • Journal of the Institute of Electronics Engineers of Korea TC
    • /
    • v.48 no.2
    • /
    • pp.6-13
    • /
    • 2011
  • This paper deals with the interconnection problem in ad-hoc networks or sensor networks, where relay nodes are deployed additionally to form connections between given nodes. This problem can be reduced to a NP-hard problem. The nodes of the networks, by applications or geographic factors, can be deployed densely in some areas while sparsely in others. For such a case one can make an approximation scheme, which gives shorter execution time, for the additional node deployments by ignoring the interconnections inside the dense area of nodes. However, the case is still a NP-hard, so it is proper to establish a polynomial time approximation scheme (PTAS) by implementing a dynamic programming. The analysis can be made possible by an elaboration on making the definition of the objective function. The objective function should be defined to be able to deal with the requirement incurred by the substitution of the dense area with its abstraction.

Modeling and Simulation Study of Multipath Ghosts (다중 경로 고스트의 모델링 및 시뮬레이션 연구)

  • Kwon, Sung-Jae
    • Journal of the Korea Computer Industry Society
    • /
    • v.6 no.5
    • /
    • pp.675-686
    • /
    • 2005
  • This paper proposes a new method of mathematically modeling and computer simulating television ghosts wherein television signals that have undergone multipath fading are generated without using approximations by considering the attenuation, time delay, phase, and timing jitter between consecutive frames. Conventional methods used polynomial interpolation or complex arithmetic to take into account the ghost phase, but our method uses only real arithmetic by employing the Hilbert transform and also reduces the computation time using the FFT (fast Fourier transform) algorithm. Furthermore, it is also possible to observe the transmit waveforms in both RF and IF ranges. Various ghost patterns generated in software provide for essential data required for the development of ghost canceling algorithms, and are deemed to be very useful in analyzing the constituent blocks of the transmitter and receiver chain in television broadcasting. The development of ghost cancelers needs to be preceded by the task of mathematically modeling ghosts and their extensive computer simulations.

  • PDF

Balancing assembly line in an electronics company

  • 박경철;강석훈;박성수;김완희
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1993.10a
    • /
    • pp.12-19
    • /
    • 1993
  • In general, the line balancing problem is defined as of finding an assignment of the given jobs to the workstations under the precedence constraints given to the set of jobs. Usually, the objective is either minimizing the cycle time under the given number of workstations or minimizing the number of workstations under the given cycle time. In this paper, we present a new type of an assembly line balancing problem which occurs in an electronics company manufacturing home appliances. The main difference of the problem compared to the general line balancing problem lies in the structure of the precedence given to the set of jobs. In the problem, the set of jobs is partitioned into two disjoint subjects. One is called the set of fixed jobs and the other, the set of floating jobs. The fixed jobs should be processed in the linear order and some pair of the jobs should not be assigned to the same workstations. Whereas, to each floating job, a set of ranges is given. The range is given in terms of two fixed jobs and it means that the floating job can be processed after the first job is processed and before the second job is processed. There can be more than one range associated to a floating job. We present a procedure to find an approximate solution to the problem. The procedure consists of two major parts. One is to find the assignment of the floating jobs under the given (feasible) assignment of the fixed jobs. The problem can be viewed as a constrained bin packing problem. The other is to find the assignment of the whole jobs under the given linear precedence on the set of the floating jobs. First problem is NP-hard and we devise a heuristic procedure to the problem based on the transportation problem and matching problem. The second problem can be solved in polynomial time by the shortest path method. The algorithm works in iterative manner. One step is composed of two phases. In the first phase, we solve the constrained bin packing problem. In the second phase, the shortest path problem is solved using the phase 1 result. The result of the phase 2 is used as an input to the phase 1 problem at the next step. We test the proposed algorithm on the set of real data found in the washing machine assembly line.

  • PDF

Path Algorithm for Maximum Tax-Relief in Maximum Profit Tax Problem of Multinational Corporation (다국적기업 최대이익 세금트리 문제의 최대 세금경감 경로 알고리즘)

  • Sang-Un Lee
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.23 no.4
    • /
    • pp.157-164
    • /
    • 2023
  • This paper suggests O(n2) polynomial time heuristic algorithm for corporate tax structure optimization problem that has been classified as NP-complete problem. The proposed algorithm constructs tax tree levels that the target holding company is located at root node of Level 1, and the tax code categories(Te) 1,4,3,2 are located in each level 2,3,4,5 sequentially. To find the maximum tax-relief path from source(S) to target(T), firstly we connect the minimum witholding tax rate minrw(u, v) arc of node u point of view for transfer the profit from u to v node. As a result we construct the spanning tree from all of the source nodes to a target node, and find the initial feasible solution. Nextly, we find the alternate path with minimum foreign tax rate minrfi(u, v) of v point of view. Finally we choose the minimum tax-relief path from of this two paths. The proposed heuristic algorithm performs better optimal results than linear programming and Tabu search method that is a kind of metaheuristic method.

Estimation of fruit number of apple tree based on YOLOv5 and regression model (YOLOv5 및 다항 회귀 모델을 활용한 사과나무의 착과량 예측 방법)

  • Hee-Jin Gwak;Yunju Jeong;Ik-Jo Chun;Cheol-Hee Lee
    • Journal of IKEEE
    • /
    • v.28 no.2
    • /
    • pp.150-157
    • /
    • 2024
  • In this paper, we propose a novel algorithm for predicting the number of apples on an apple tree using a deep learning-based object detection model and a polynomial regression model. Measuring the number of apples on an apple tree can be used to predict apple yield and to assess losses for determining agricultural disaster insurance payouts. To measure apple fruit load, we photographed the front and back sides of apple trees. We manually labeled the apples in the captured images to construct a dataset, which was then used to train a one-stage object detection CNN model. However, when apples on an apple tree are obscured by leaves, branches, or other parts of the tree, they may not be captured in images. Consequently, it becomes difficult for image recognition-based deep learning models to detect or infer the presence of these apples. To address this issue, we propose a two-stage inference process. In the first stage, we utilize an image-based deep learning model to count the number of apples in photos taken from both sides of the apple tree. In the second stage, we conduct a polynomial regression analysis, using the total apple count from the deep learning model as the independent variable, and the actual number of apples manually counted during an on-site visit to the orchard as the dependent variable. The performance evaluation of the two-stage inference system proposed in this paper showed an average accuracy of 90.98% in counting the number of apples on each apple tree. Therefore, the proposed method can significantly reduce the time and cost associated with manually counting apples. Furthermore, this approach has the potential to be widely adopted as a new foundational technology for fruit load estimation in related fields using deep learning.

The Hybrid Method of ToA and TDoA Using MHP Pulse in UWB System (UWB 시스템에서의 MHP 펄스를 이용한 ToA와 TDoA의 Hybrid 방식)

  • Hwang, Dae-Geun;Hwang, Jae-Ho;Kim, Jae-Moung
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.10 no.1
    • /
    • pp.49-59
    • /
    • 2011
  • Recently, ToA and TDoA estimation are favorable among all of estimation techniques because they have the best accuracy in estimating position. ToA and TDoA estimation are typical techniques based on time. So, it is important to have the time syncronization and offset between a target node and several reference nodes. If they don't have the time syncronization between a reference node and target node or have a time offset among reference nodes, the positioning error will increase due to the ranging error. The conventional positioning algorithm does not have a accurate device's position because ranging error is added the calc dation of the position. In this paper, we propose a hybrid method of ToA and TDoA ll increase due. We use MHP pulse that has orthogonal pulse instead of the existing pulse to transmit and receive pulses between a target node and reference nodes. We can estimate the target node's position by ToA and TDoA estimation to transmit and receive MHP pulses only once. When the proposed Hybrid method iteratively calculate the distance, we can select the ranging technique to have more accurate position. The simulation results confirm the enhancement of the Hybrid method.

Efficient Mining of Frequent Subgraph with Connectivity Constraint

  • Moon, Hyun-S.;Lee, Kwang-H.;Lee, Do-Heon
    • Proceedings of the Korean Society for Bioinformatics Conference
    • /
    • 2005.09a
    • /
    • pp.267-271
    • /
    • 2005
  • The goal of data mining is to extract new and useful knowledge from large scale datasets. As the amount of available data grows explosively, it became vitally important to develop faster data mining algorithms for various types of data. Recently, an interest in developing data mining algorithms that operate on graphs has been increased. Especially, mining frequent patterns from structured data such as graphs has been concerned by many research groups. A graph is a highly adaptable representation scheme that used in many domains including chemistry, bioinformatics and physics. For example, the chemical structure of a given substance can be modelled by an undirected labelled graph in which each node corresponds to an atom and each edge corresponds to a chemical bond between atoms. Internet can also be modelled as a directed graph in which each node corresponds to an web site and each edge corresponds to a hypertext link between web sites. Notably in bioinformatics area, various kinds of newly discovered data such as gene regulation networks or protein interaction networks could be modelled as graphs. There have been a number of attempts to find useful knowledge from these graph structured data. One of the most powerful analysis tool for graph structured data is frequent subgraph analysis. Recurring patterns in graph data can provide incomparable insights into that graph data. However, to find recurring subgraphs is extremely expensive in computational side. At the core of the problem, there are two computationally challenging problems. 1) Subgraph isomorphism and 2) Enumeration of subgraphs. Problems related to the former are subgraph isomorphism problem (Is graph A contains graph B?) and graph isomorphism problem(Are two graphs A and B the same or not?). Even these simplified versions of the subgraph mining problem are known to be NP-complete or Polymorphism-complete and no polynomial time algorithm has been existed so far. The later is also a difficult problem. We should generate all of 2$^n$ subgraphs if there is no constraint where n is the number of vertices of the input graph. In order to find frequent subgraphs from larger graph database, it is essential to give appropriate constraint to the subgraphs to find. Most of the current approaches are focus on the frequencies of a subgraph: the higher the frequency of a graph is, the more attentions should be given to that graph. Recently, several algorithms which use level by level approaches to find frequent subgraphs have been developed. Some of the recently emerging applications suggest that other constraints such as connectivity also could be useful in mining subgraphs : more strongly connected parts of a graph are more informative. If we restrict the set of subgraphs to mine to more strongly connected parts, its computational complexity could be decreased significantly. In this paper, we present an efficient algorithm to mine frequent subgraphs that are more strongly connected. Experimental study shows that the algorithm is scaling to larger graphs which have more than ten thousand vertices.

  • PDF