• Title/Summary/Keyword: Pollution load amount

Search Result 96, Processing Time 0.023 seconds

A Case Study of Decreasing Environment Pollution Caused by Energy Consumption of a Dormitory Building Which Only Using Electricity by Efficiently Simulating Applying Residential SOFC (Solid Oxide Fuel Cell)

  • Chang, Han;Lee, In-Hee
    • Architectural research
    • /
    • v.21 no.1
    • /
    • pp.21-29
    • /
    • 2019
  • Recent years in Korea, some new developed buildings are only using electricity as power for heating, cooling, bathing and even cooking which means except electricity, there is no natural gas or other kinds of energy used in such kind of building. In vehicle industry area, scientists already invented electric vehicle as an environment friendly vehicle; after that, in architecture design and construction field, buildings only using electricity appeared; the curiosity of the environment impact of energy consumption by such kind of building lead me to do this research. In general, electricity is known as a clean energy resource reasoned by it is noncombustible energy resource; however, although there is no environmental pollution by using electricity, electricity generation procedure in power plant may cause huge amount of environment pollution; especially, electricity generation from combusting coal in power plant could emit enormous air pollutants to the air. In this research, the yearly amount of air pollution by energy using under traditional way in research target building that is using natural gas for heating, bathing and cooking and electricity for lighting, equipment and cooling is compared with yearly amount of air pollution by only using electricity as power in the building; result shows that building that only uses electricity emits much more air pollutants than uses electricity and natural gas together in the building. According to the amount of air pollutants comparison result between two different energy application types in the building, residential SOFC (Solid oxide fuel cell) is simulated to apply in this building for decreasing environment pollution of the building; furthermore, high load factor could lead high efficiency of SOFC, in the scenario of simulating applying SOFC in the building, SOFC is shared by two or three households in spring and autumn to increase efficiency of the SOFC. In sum, this research is trying to demonstrate electricity is a conditioned environment friendly energy resource; in the meanwhile, SOFC is simulated efficiently applying in the building only using electricity as power to decrease the large amount of air pollutants by energy using in the building. Energy consumption of the building is analyzed by calibrated commercial software Design Builder; the calibrated mathematical model of SOFC is referred from other researcher's study.

Performance Appraisal of Total Maximum Daily Loads: Performance on Development/Reduction Plan and Water Quality Status of Unit Watershed (수질오염총량관리제의 성과평가: 개발/삭감계획의 이행실적 및 단위유역의 수질 현황)

  • Park, Jae Hong;Park, Jun Dae;Rhew, Doug Hee;Jung, Dong Il
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.4
    • /
    • pp.481-493
    • /
    • 2009
  • This study was conducted to performance appraisal of Total Maximum Daily Loads (TMDLs), especially in terms of performance on development & reduction plan and water quality status of unit watershed. Because load allocations for pollution sources were predicted redundantly by uncertainty of prediction, TMDLs master plan has been frequently changed to acquire load allocation for local development. Therefore, It need to be developed more resonable prediction techniques of water pollution sources to preventing the frequent change. It is suggested that the reduction amount have to be distributed properly during the planning period. In other words, it has not to be concentrated on the specific year (especially final year of the planning period). The reason why, if the reduction amount concentrate on the final year of the planning period, allotment loading amount could not be achieved in some cases (e.g., insufficiency of budget, extension of construction duration). If the development plan was developed including uncertain developments, it is necessary to be developed reduction plan considered with them. However, some of the plans in the reduction plan could not be accomplished in some case. Because, it is not considered financial abilities of local governments. Consequently, development plan must be accomplished to avoid uncertain developments, and to consider financial assistance to support the implementation of effective plan. Water quality has been improved in many unit watersheds due to the TMDLs, especially in geum river and yeongsang/seomjin river.

A Survey on the Status of Air Pollution around Toll Booth of Expressway -Around Seoul and Suwon Toll Booth- (고속도로 요금소 주변의 대기오염에 관한 조사연구 -서울 및 수원 요금소를 중심으로-)

  • 이윤재;김정철;김광종;송동빈;차철환;권영근
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.4 no.1
    • /
    • pp.79-83
    • /
    • 1988
  • To improve working environment for the toll workers who were working at Kyungbu expressway in outskirts of Seoul and Suwon, the status of air pollution surrounding toll booth were measured from March 28 through June 14, 1986. The results were as follows: 1. The amount of TSP (total suspended particle) surrounding toll booth was directly proportional to the traffic load. The ratio of traffic load at Seoul and Suwon toll was 3.2:1 and of TSP was 2.6:1. 2. The proportion of particle larger than 5$\mum$ was 24.8 $\sim$ 34.9% of TSP at Seoul toll and 19.2 $\sim$ 32.7% at Suwon. The proportion of particle less than 2$\mum$ was 38.7 $\sim$ 51.8% of TSP at Seoul toll and 34.8 $\sim$ 54.8% at Suwon. 3. The concentration of respirable particle les than 7$\mum$ measured by personal air sampler was higher in Seoul toll booth than that of Suwon and it seems to be influenced by the exhausion of diesel engine. Especially the concentration of respirable particle of reformed toll booth with air curtain was 20% lower than unreformed one. 4. Concentration of Pb among suspended particles around Seoul toll was 5 times higher than Pb of Suwon toll. So it is considered that there were other possible pollution source of Pb beyond heavy traffic in Seoul toll area. The amount of Pb inside toll booth was extremely small but the concentration of benzo(a)pyrene showed a trend of increase according to traffic stagnation. 5. The concentration of $SO_2$ arround toll showed no difference between weekday and weekend and also showed no relation with traffic load. But the concentration of $NO_2$ was affected by traffic load.

  • PDF

A Comparison Between Reduction Methods for BOD Loadings to Achieve Water Quality Standards at the End of the Yeongsan River (영산강 하류부의 목표수질 달성을 위한 BOD 부하량 삭감방법의 비교)

  • 황대호;정효준;이홍근
    • Journal of Environmental Health Sciences
    • /
    • v.27 no.2
    • /
    • pp.119-126
    • /
    • 2001
  • The key point in establishing water quality management measures is how to decide the load reduction for pollution sources. This study was performed to compare reduction methods for BOD loadings to achieve water quality standards at the end of the Yeongsan river. The target year is 2006 and 2011 and reduction methods are uniform treatment and treatment by influence rate. Using QUAL2E model, the study was performed under the conditions of establishing and non-establishing the publicly owned treatment works(POTWs). Uniform treatment which allocate the same reduction rate to pollution sources showed that all streams into the river should be applied for the reduction. However, treatment by influence rate which allocate the reduction rate by the order of influence rate showed that achieving target quality might be possible with a few streams for the reduction. But total amount of load reduction of streams was not significantly different from two methods.

  • PDF

Evaluation of Applicability of APEX-Paddy Model based on Seasonal Forecast (계절예측 정보 기반 APEX-Paddy 모형 적용성 평가)

  • Cho, Jaepil;Choi, Soon-Kun;Hwang, Syewoon;Park, Jihoon
    • Journal of Korean Society of Rural Planning
    • /
    • v.24 no.4
    • /
    • pp.99-119
    • /
    • 2018
  • Unit load factor, which is used for the quantification of non-point pollution in watersheds, has the limitation that it does not reflect spatial characteristics of soil, topography and temporal change due to the interannual or seasonal variability of precipitation. Therefore, we developed the method to estimate a watershed-scale non-point pollutant load using seasonal forecast data that forecast changes of precipitation up to 6 months from present time for watershed-scale water quality management. To establish a preemptive countermeasure against non-point pollution sources, it is possible to consider the unstructured management plan which is possible over several months timescale. Notably, it is possible to apply various management methods such as control of sowing and irrigation timing, control of irrigation through water management, and control of fertilizer through fertilization management. In this study, APEX-Paddy model, which can consider the farming method in field scale, was applied to evaluate the applicability of seasonal forecast data. It was confirmed that the rainfall amount during the growing season is an essential factor in the non-point pollution pollutant load. The APEX-Paddy model for quantifying non-point pollution according to various farming methods in paddy fields simulated similarly the annual variation tendency of TN and TP pollutant loads in rice paddies but showed a tendency to underestimate load quantitatively.

A Study on Process Improvement for Reduction of Pollution Loading Rate in Small Individual Sewage Plant (소규모 개인하수처리시설의 MBR공정 적용에 관한 연구)

  • Eom, Han Ki;Choi, Yoo Hyun;Joo, Hyun Jong
    • Journal of Environmental Science International
    • /
    • v.25 no.2
    • /
    • pp.323-329
    • /
    • 2016
  • In this study, the applicability of MBR process was evaluated to improve processing of personal sewage treatment facilities of $50m^3/day$ or less. As result of the research, stable discharge water quality could be secured as result of the MBR effector operation according to rate of inflow and inflow load and treatment efficiency of 98% or higher was shown by the membrane filtering method operation for SS, $BOD_5$. it was found that high treatment efficiency of 99% or higher. It is judged that detention time can be designed until 6.9 hr when applying MBR process on personal sewage treatment facilities with high pollution load and that cutback of pollution load can be possible through this study. It was shown that MBR process application reduces an annual cost of 4,829,600 won based on the basic unit calculation results and solves burden of amount of borne by causers according to excess of discharge water quality standards.

Estimation of Pollution Using Load Duration Curves at Streams in Sapgyo Watershed (부하지속곡선을 이용한 삽교호수계 지류하천의 오염원인 분석)

  • Cho, Jeongho;Kim, Hongsu;Cho, Byunguk;Park, Sanghyun;Lee, Mukyu;Lee, byeonggu
    • Journal of Korean Society on Water Environment
    • /
    • v.37 no.3
    • /
    • pp.175-189
    • /
    • 2021
  • In this study, 48 streams in the Sapgyo Watershed were selected, and the Load Duration Curves (LDC) were drawn up for each stream using water quality and flow monitoring over the last three years (2018-2020), and it was evaluated whether the target water quality was achieved for each flow section. As a result of evaluating whether or not the target water quality exceeded according to the LDC, it was found that 22 rivers exceeded the target water quality. Five rivers exceeded the target water quality due to point pollutant sources, 13 rivers exceeded the target water quality due to non-point pollutant sources, and 4 rivers exceeded the target water quality due to both point and non-point pollutant sources. Among the rivers that exceeded the target water quality due to point pollutant sources, which included domestic sewage of the untreated population, there is a need to reduce the influx of polluted loads by the untreated population. The use of eco-friendly fertilizers is recommended for rivers with a relatively high farmland ratio among rivers exceeding the target water quality due to non-point pollutant sources, and installation of boiling point reduction facilities that can reduce the amount of polluted load introduced during rainfall or manage water shores. In rivers with a large number of livestock breeding heads, the livestock houses located in these rivers need to be preferentially transferred to livestock manure treatment plants. Due to the high ratio of land area because of urbanization, initial rainwater treatment facilities are required to reduce the amount of pollutant load flowing into the river through the impermeable layer during rainfall.

Application of the Load Duration Curve (LDC) to Evaluate the Achievement Rate of Target Water Quality in the Nakdong River Unit Watersheds (부하지속곡선(LDC ; Load Duration Curve)을 활용한 낙동강수계 오염총량 단위유역 목표수질 평가방법 적용 방안)

  • Jung, Kang-Young;Kim, Hong Tae;Kim, Sang Soo;Kim, Shin;Shin, Dong Seok;Kim, Gyeong Hoon
    • Journal of Environmental Science International
    • /
    • v.26 no.4
    • /
    • pp.433-445
    • /
    • 2017
  • In recent years, the United States has used the Load Duration Curve (LDC) method to identify water pollution problems, considering the size of the pollutant load in the entire stream flow condition to effectively evaluate Total Maximum Daily Loads (TMDLs). A study on the improvement of the target water quality evaluation method was carried out by comparing evaluations of two consecutive years of water quality and LDC data for 41 unit watersheds (14 main streams and 27 tributaries). As a result, the achievement rate of the target water quality evaluation method, according to current regulations, was 68-93%, and that by the LDC method was 82-93%. Evaluating the target water quality using the LDC method results in a reduction in the administrative burden and the total amount of planning as compared to the current method.

Analysis on Load of Non-point Source from Sewage Treatment Districts in Nakdong River (낙동강 유역 내 하수처리구역의 비점 배출 부하량 분석)

  • Shin, Hyun Suk;Kim, Mi Eun;Kim, Jae Moon;Jang, Jong Kyung
    • Journal of Korea Water Resources Association
    • /
    • v.48 no.9
    • /
    • pp.695-709
    • /
    • 2015
  • The inflow of nonpoint pollution sources due to sustainable development and urbanization is gradually increasing and causes a diversity of water pollution. There are lots of difficulties to find a solution as the problems related to variation of hydrological and natural phenomenon. A differentiated method to estimate the nonpoint pollution sources has been proposed using rainfall and characteristics of urbanization and observed data from sewage treatment districts in the study. The types of nonpoint pollution sources on an assumption of combined sewer system have been classified as three types which are inflow of rainfall, bypass of sewage treatments, and combined sewer overflows from a river. Three types for estimation of nonpoint pollution sources applied more accurately to generate a amount of nonpoint pollution loads. This study is expecting a wide application for effective water resource management on TMDL (total maximum delivery load) unit watershed and sewage treatment districts.

Pollutant Load Characteristics of a Rural Watershed of Juam Lake (주암호 농촌 소유역 오염부하특성)

  • Han, Kuk-Heon;Yoon, Kwang-Sik;Jung, Jae-Woon;Yoon, Suk-Gun;Kim, Young-Joo
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.47 no.3
    • /
    • pp.77-86
    • /
    • 2005
  • A monitoring study has been conducted to identify hydrologic conditions, water quality and nutrient loading characteristics of small watershed in Juam Lake. Climate data of the watershed were collected; flow rate was measured and water quality sampling was conducted at the watershed outlet for this study. Water quality data revealed that T-P concentrations meet I grade of lake water quality standard during non-storm period, but degraded up to II-III grade of lake water quality standard during storm period. The observed T-N concentrations always exceeded lake water quality standard. Therefore, T-P was identified as limiting chemical constituent for eutrophication of Juam Lake. T-P concentration of non-storm period also revealed that point source pollution is not serious in the watershed. Three year monitoring results showed that the observed T-N losses were $10.85\~18.88$ kg/ha and T-P losses were $0.028\~0.323$ kg/ha during six month (Mar. - Oct.), respectively. Major portion of runoff amount discharged by a few storm events a year and nutrient load showed apparent seasonal variation. Huge runoff amounts were generated by intense storms, which make application of water treatment or detention facilities ineffective. Monitoring results confirmed that water quality improvement by abating nonpoint source pollution in rural watershed of monsoon climate should be focused on source control. T-P losses from paddy field seemed to consist of significant amount of total load from study watershed. Therefore, management of drainage from paddy field is considered to be important for preventing algal blooming problem in Juam Lake.