• Title/Summary/Keyword: Point source discharged pollution load density

Search Result 2, Processing Time 0.022 seconds

Selection Priority of Tributary Catchments for Improving Water Quality using Stream Grouping Method (하천그룹화 방법을 이용한 수질개선 하천유역의 우선순위 선정)

  • Cho, Byungwook;Choi, Jeongho;Yi, Sangjin;Kim, Youngil
    • Journal of Korean Society on Water Environment
    • /
    • v.28 no.1
    • /
    • pp.18-25
    • /
    • 2012
  • For effective watershed management, it is very important to select the tributaries through selection and concentration of targeted tributary catchments for improving water quality within the limited financial conditions. This study introduced the selection and diagnosis procedure of tributary catchments for improving water quality at Chungcheongnam-do based on water quality and flowrate monitoring, stream grouping method. The tributaries with high value of water quality and flowrate were selected for improving water quality according to stream grouping method. The diagnosis of selected tributaries for improving water quality was performed with analysis of the pollution load (generated, discharged, delivered) and point source discharged pollution load density. The plans for improving water quality of tributaries were suggested thorough various diagnosis of tributary catchments. For improving water quality of tributaries in Chungcheongnam-do, the tributary catchments in the Dangjin, Asan, Yesan, Cheonan, Hongseong area should be preferentially considered. The water quality improving plans for those tributary catchments, in accordance with the reduction of sources of pollution by population and livestock, should be established.

Improvement on Management of Non-point Source Pollution for Reasonable Implementation of TMDL - Focusing on Selection of Non-point Source Pollution Management Region and Management of Non-point Source Pollutant - (수질오염총량관리제의 합리적인 시행을 위한 비점오염원관리 개선방안 - 비점오염원 관리지역 선정 및 비점오염물질 관리를 중심으로 -)

  • Yi, Sang-Jin;Kim, Young-Il
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.36 no.10
    • /
    • pp.719-723
    • /
    • 2014
  • For effective implementation of total maximum daily load (TMDL), this study presented the improving plans of non-point source pollution management including the classification of non-point source pollution, calculation of non-point source pollution load (generated, discharged), selection of non-point source pollution management regions and management of non-point source pollutant. First of all, the definition of point source pollution and non-point source pollution based on the legal and scientific viewpoint should be precisely classified and managed. Especially, the forest, grassland and river without occurrence of environmental damage by activity of business and human should be separately classified natural background pollutants. The unit for generated and discharged non-point source pollution should be preferentially changed according to actual condition of watershed. The calculation methods of generated and discharged non-point source pollution should be corrected consideration on the amount and duration of rainfall. While the TMDL is implemented, non-point source pollution management regions should be selected in the watersheds exceed the targeted water quality standards by the rainfall. The non-point source pollution management regions should be selected in the minimal regions where have high values of discharged non-point source pollution density in the urban area, farmland and site area except forest, grassland in the whole watershed. The non-point source pollutant treatment facilities, which take into consideration non-point source pollution load per unit area, duration of the excess concentration, realizable possibility of treatment, effectiveness of treatment cost versus point source pollutant, should be established in the regions with a large generated non-point source pollution load and a high concentration of water quality exceed the targeted water quality standards by the rainfall.