• Title/Summary/Keyword: Pohang Light Source (PLS)

Search Result 47, Processing Time 0.035 seconds

Design of shunt structure to avoide TE mode in PLS-II storage ring vacuum chamber

  • Ju, Yeong-Do;Ha, Tae-Gyun;Park, Seong-Ju;Park, Jong-Do
    • Proceedings of the Korean Vacuum Society Conference
    • /
    • 2010.08a
    • /
    • pp.42-42
    • /
    • 2010
  • We, previously, proved that the noise in the vertical readback from some of beam position monitors (BPMs) in the vacuum chamber of Pohang Light Source (PLS) are caused by the transverse electric (TE) longitudinal harmonic resonances. Based on this analysis, we now design the shunt structure to remove the TE mode resonces near the BPMs operation frequency of 500 MHz in the storage ring vacuum chamber of PLS upgrade project (PLS-II). The simulation result and experimental test result will be presented.

  • PDF

The Status and prospect of Pohang Synchrotron Light Source at PAL on its 25th Anniversary

  • Jo, Mu-Hyeon
    • Proceedings of the Korean Vacuum Society Conference
    • /
    • 2013.08a
    • /
    • pp.61.2-61.2
    • /
    • 2013
  • 우리나라 최초의 거대과학 장치인 포항방사광가속기(PLS)는 지난 16년(1994~2010) 동안 국내외 이용자에게 제3세대 방사광을 제공했다. 최초 2기의 빔라인을 시작으로 꾸준하게 빔라인 증설과 성능개선을 위해 노력해 왔다. 지속해서 늘어나는 방사광 이용자 수와 더욱더 좋은 수준의 방사광 요구에 부응하기 위하여 2009년부터 3년 동안 가속장치의 성능향상사업(PLS-II)을 마쳤다. PLS-II는 PLS 대비에너지와 빔전류는 3 GeV, 400 mA로 늘리는 반면 빔의 크기는 크게 줄이고 빔안정성을 개선한 고품질 X-선 방사광 발생장치이다. 2012년부터 16기의 삽입장치 빔라인을 포함한 30기의 빔라인을 가동하여 이용자 지원을 하고 있으며 초전도케비티 설치를 포함한 목표 성능의 확보에도 많은 노력을 기울이고 있다. 현재는 6 nm-rad의 빔에 미턴스, 3-GeV전자빔, 약 0.5 ${\mu}m-rms$ 빔안정도를 가진 200 mA Top-up 운전으로 빔을 제공 하고 있으며 2014년 말에는 저장전류 400 mA급의 PLS-II 목표치로 운전할 계획이다. 본 발표에서는 포항가속기의 25년 역사를 돌아보고 가속장치의 건설에 얽힌 이야기, 중요장치 그리고 운전과 빔제공에 관한 내용, 특히 핵심 운전가치인 빔안정성을 개선하고 유지하기 위한 노력을 빔운전 측면과 진공을 포함한 엔지지어링 측면에서 언급하고자 한다. PLS 건설부터 현재 운용 중인 30기의 빔라인에서 수행된 연구 성과의 통계에 대하여 훑어보고 X-선 산란과 광전자분광을 이용한 구조, 성분 및 물성분석, 그리고 이미징 등의 분야에서 나온 탁월한 연구 결과를 살펴본다. 앞으로 건설될 신규 빔라인과 빔라인의 향후 운영 방향을 소개한다. 마지막으로 지금 포항가속기연구소에서 건설 중인 제4세대 가속기(X-선 자유전자레이저) 프로젝트의 개요 및 건설 현황과 함께 앞으로 기대되는 새로운 과학에 대하여도 소개하고자 한다.

  • PDF

Pohang Light Source(PLS)용 전자석의 설계, 제작 및 측정

  • ;John Milburn
    • Journal of the Korean Magnetics Society
    • /
    • v.5 no.6
    • /
    • pp.986-990
    • /
    • 1995
  • 국내 최초의 대형 가속기 시설인 포항방사광 가속기(Pohang Light Source)가 1995년 9월을 기점으로 일반 User들을 위하여 방사광을 제공하기 시작하였다. 포항방사광 가속기는 전자를 2.0GeV까지 가속시키는 선형 가속기와 가속된 전자를 원형 궤도에 저장 하는 전자저장링, 전자가 방출하는 방사광을 실험 지역까지 끌어내는 빔라인으로 이루어져 있다. PLS는 입자들을 충돌시켜 그 구성 물질을 찾아내는 Collider가 아니라 전자에서 방출되는 빛을 사용하기 위한 광원(Light Source)이다. 이미 전세계적으로 운전 중인 Light Source가 여러개 있지만 PLS는 방사광의 활용만을 목적으로 설계 제작 되었다. 따라서 기존의 광원보다 낮은 Beam Emittance를 가지고 있고 삽입 장치를 설치할 수 있는 직선 구간을 많이 보유하고 있다는 .larw. 면에서 기존의 광원과는 구별 하여 3세대 광원이라고 부른다. 3세대 방사광 가속기에 사용되는 전자석은 전자가 저장링을 수백억번 이상을 회전할 동안 안정된 전자 궤도를 보장하여야 하므로 전자석들끼리의 Fundamental 성분의 에러 및 한 전자석에서 허용되는 다극 에러가 아주 작아야 한다. 또 허용되는 에러들이 작기 때문에 그것들을 분간하기 위한 자장 측정 장치 또는 매우 정밀하여야 한다. 이 보고서에서는 이런 Tolerance를 만족시키기 위한 전자석의 설계, 제작, 측정에 대하여 설명하였다.

  • PDF

Impedance Calculation for Vacuum Components in Pohang Light Source Storage Ring

  • Ju, Yeong-Do;Lee, Byeong-Jun;Son, Yeong-Uk;Yu, In-Ha;Jeon, Myeong-Hwan;Park, In-Su;Kim, Seung-Hwan;Ha, Tae-Gyun;Gong, Hyeong-Seop;Son, Yun-Gyu;Park, Yong-Jeong;Park, Jong-Do;Nam, Sang-Hun
    • Proceedings of the Korean Vacuum Society Conference
    • /
    • 2014.02a
    • /
    • pp.151.2-151.2
    • /
    • 2014
  • Broadband impedances for the 3-GeV pohang light source-II (PLS-II) storage ring have been numerically estimated using a full three dimensional finite-difference time-domain code, CST particle studio. The total broadband impedance of all the vacuum components was estimated as 0.256 ohm, which is a small fraction of the total machine impedance budget.

  • PDF

Helium Leak Test for the PLS Storage Ring Chamber (포항가속기 저장링챔버의 헬륨누설검사)

  • Choi, M.H.;Kim, H.J.;Choi, W.C.
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.13 no.3
    • /
    • pp.31-38
    • /
    • 1993
  • The storage ring vacuum system for the Pohang Light Source (PLS) has been designed to maintain the vacuum pressure of $10^{-10}Torr$ which requires UHV welding to have helium leak rate less than $1{\times}10^{-10}Torr{\cdot}{\ell}/sec$. In order to develop new technique (PLS) welding technique), a prototype vacuum chamber has been welded by using Tungsten Inert Gas welding method and all the welded joints have been tested with a non-destructive method, so called helium leak detection, to investigate the vacuum tightness of the weld joints. The test was performed with a detection limit of $1{\times}10^{-10}Torr{\cdot}{\ell}/sec$ for helium and no detectable leaks were found for all the welded joints. Thus the performance of welding technique is proven to meet the criteria of helium leak rate required in the PLS Storage Ring. Both the principle and the procedure for the helium leak detection are also discussed.

  • PDF

OPERATING CHARACTERISTICS OF THE PLS INJECTION KICKER MODULATOR (포항방사광가속기 킼커 대출력 펄스전원장치 운전특성)

  • Nam, S.H.;Jeong, S.H.;Ko, I.S.
    • Proceedings of the KIEE Conference
    • /
    • 1998.07e
    • /
    • pp.1800-1802
    • /
    • 1998
  • The Pohang Light Source (PLS) is a third generation 2 GeV synchrotron machine. An injection kicker modulator is positioned in the PLS storage ring tunnel. The kicker modulator is driving four kicker magnets simultaneously. The kicker magnets produce magnetic field to deflect the stored beam orbit in the storage ring closer to the injected beam from the PLS beam transfer line. The injected beam then falls into the storage ring beam dynamic aperture. The current kicker modulator was upgraded and installed on August 1995. Since then, the kicker modulator has shown very reliable and stable performance. The kicker modulator specifications are ${\sim}6.0{\mu}s$ full width, ${\sim}24$ kA peak current, and 10 Hz repetition rate. Output current waveform is a half sinusoid. Two thyratron switches(EEV CX-1536AX) are used in the kicker modulator. Total accumulated thyratron heater run hour is about 15,000 hours as of May 1998. Measurement result of spatial magnetic field distribution in the kicker magnet shows good uniformity.

  • PDF

PLS-II 저장링 진공시스템 건설

  • Park, Jong-Do
    • Proceedings of the Korean Vacuum Society Conference
    • /
    • 2011.08a
    • /
    • pp.100-100
    • /
    • 2011
  • 포항가속기연구소에서는 제3세대 방사광가속기 성능향상사업(PLS-II)을 수행하고 있다. 2010년 12월 말 PLS (Pohang light Source) 해체를 시작한 후 2011년 6월 말 까지 PLS-II 저장링 건설을 완료 하였으며 현재 시운전을 계속하고 있다. 성능향상은 기존 PLS 건물을 그대로 유지한 채 삽입장치를 20기 까지 설치하도록 변경하도록 하였으며 전자빔의 에너지는 2.5 GeV에서 3 GeV로, 빔전류는 200 mA에서 400 mA로 증가시키는 반면 빔에미턴스는 약 1/3로 줄인다. 저장링 진공시스템은 저장된 전자가 충분한 시간동안 저장되도록 운전시 2${\times}$10-9 Torr 이하의 진공도를 가지도록 건설하였다. 본 발표에서는 지난 2년 동안 진행되어온 PLS-II 저장링 진공시스템에 대한 설계, 제작, 시험, 설치, 시운전 및 건설 일정/인력에 등에 대하여 보고하며 PLS 건설 및 해체에 대한 내용도 보고한다.

  • PDF

KLYSTRON-MODULATOR SYSTEM PERFORMANCES FOR PLS 2-GeV LINAC (포항 20억 전자볼트 선형가속기 클라이스트론-모듈레이터 시스템의 성능)

  • Park, S.W.;Park, S.S.;Lee, K.T.;Oh, J.S.;Cho, M.H.;NamKung, W.
    • Proceedings of the KIEE Conference
    • /
    • 1995.07c
    • /
    • pp.1365-1367
    • /
    • 1995
  • The PLS 2-GeV linac employs 11 units of high-power pulsed klystrons(80MW) as the main RF sources. The matching modulators of 200 MW(400kV, 500 A) can provide a flat-top pulse width of 4.4 ${\mu}s$ with a maximum pulse repetition rate of 120 Hz at the full power level. For a good stability of electron beams, the pulse-to-pulse flat-top voltage variation of a modulator requires less than 0.5%. In order to achieve this goal, we stabilized high voltage charging power supplies within 1% by a phase controlled SCR voltage regulator. In addition, we employed ac/dc feedback together with a resistive De-Q'ing system to achieve far less than 0.5% variation of the PFN charging voltage. This paper presents the main feature of the klystron-modulator system and the characteristics of the pulsed high-power RF system performance during the beam injection operation for the Pohang Light Source commissioning.

  • PDF

Diagnostic Instruments of PLS-II

  • Kim, Chang-Beom;Kim, Do-Tae;Choe, Jae-Yeong;Lee, Heung-Su;Park, Eung-Su;Sin, Seung-Hwan;Hwang, Jeong-Yeon
    • Proceedings of the Korean Vacuum Society Conference
    • /
    • 2012.02a
    • /
    • pp.527-527
    • /
    • 2012
  • In the Pohang Light Source (PLS), a major upgrade (PLS-II) of existing machine had been performed in last 3 years. Big improvements in beam parameters are expected from this major upgrade and various diagnostic instruments were installed to measure them. These include beam position monitor, beam current monitor, tune monitor, scraper, beam loss monitor, photon beam monitor, beam size monitor, streak camera, and so on. In this work, we would like to briefly introduce diagnostic instruments of the PLS-II and present measurement results in the commissioning process of the PLS-II.

  • PDF