• Title/Summary/Keyword: Plant design

Search Result 3,854, Processing Time 0.025 seconds

Man-hour Reduction by Development of Library in a 3-D Design System for Plant Projects (플랜트 프로젝트용 3차원 디자인 시스템에서 라이브러리 개발을 통한 설계시간 감축)

  • Lee, Jung-Hyun;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.5 no.4
    • /
    • pp.68-72
    • /
    • 2009
  • This study discussed for library development of the 3 dimensional design system for the progressive developmental world wide plant industry. Its previous background had spatial limitation by utilizing 2 dimensional CAD. This work presented an effective mode for improving man-hour by applying with 3 dimensioal design system through theoretical definition, category, and means of basic man-hour. We researched an effective method for reducing man-hour through applied example on the actual project by comprehending affection of extra development for library on man-hour.

  • PDF

A Thesis of Design Air Operated Valve Actuator in Nuclear Power Plant (원자력 발전소 AOV 구동기 설계 정립화)

  • Choi, J.K.;Hwang, J.H.;Kim, Y.B.;Son, K.Ch.
    • Proceedings of the KSME Conference
    • /
    • 2008.11b
    • /
    • pp.2616-2620
    • /
    • 2008
  • AOV used fluid capacity and fluid pressure control in nuclear power plant with heating power plant. AOV structures safely must be secured the reliability and a safety of the atomic power plant. but, AOV where is used from domestic is using the product of the overseas enterprise. The AOV design and maintenance technique is insufficient. Therefore According to ASME designed AOV, The performance test resultant fluid leakage did not occur and AOV design was satisfactory.

  • PDF

Design of Reliable Adaptive Fitter with Fault Tolerance Using DSP (DSP를 이용한 고장허용을 갖는 신뢰 적응 필터 설계)

  • 유동완;이전우;서보혁
    • The Transactions of the Korean Institute of Electrical Engineers D
    • /
    • v.50 no.1
    • /
    • pp.8-13
    • /
    • 2001
  • LMS algorithm has been used for plant identifier and noise cancellation. This algorithm has been researched for performance enhancement of filtering. The design and development of a reliable system has been becoming a key issue in industry field because the reliability of a system is considered as an important factor to perform the system's function successfully. And the computing with reliability and fault tolerance is a important factor in the case of aviation, system communication, and nuclear plant. This paper presents design of reliable adaptive filter with fault tolerance. Generally, redundancy is used for reliability. In this case it needs computing or circuit for voting mechanism, or fault detection. Therefore it has simple computing, and practicality for application. And in this paper, reliability of adaptive filter is analyzed. The effectiveness of the proposed adaptive filter is demonstrated to the case studies of plant identifier and noise cancellation by using DSP.

  • PDF

Development of Requirement Taxonomy for Design Bases Management during NPP lifecycle (원전 생애주기간 설계기준 정보관리를 위한 요건 분류체계 개발)

  • Kim, Jong-Myeong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.134-135
    • /
    • 2018
  • Nuclear Power Plant consists of about 1.4 million facilities. and the design standards and design requirements for the continuos utilization and safety of facilities are complexly connected with the facilities. When a design change for facilities or design requirements is occurred at the time of construction or operation, there are a lot of facilities, design requirements, and design bases that are affected by the facilities or design bases being changed. The above design changes are so complex that the existing document-bases design change process is time-consuming and may also cause human error. In this study, we developed a design requirement taxonomy that can be applied to the data-centric design bases document that can improve it. To do this, we analyze the design elements from the highest level to the lowest level applied to the nuclear power plant, and classify the design elements according to the characteristics of the design elements.

  • PDF

The Effects of the Scope of Plant Layout Conversion on Manufacturing Cell Design Processes and Outcomes

  • Choi, Moon-Jin
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.18 no.3
    • /
    • pp.159-177
    • /
    • 1993
  • One of major research issues in cellular manufacturing is studing factors that are fovorable or detrimental to the conversion of traditional functional layouts to GT cellular layouts. Among many factors, this paper explored plausible relationships between the scope of plant conversion and the manufacturing cell design processes and outcomes. The cell design practices of 28 U. S. plants were surveyed through a mail questionaire. While most relationships were not statistically significant, some interesting findings and insights could be drawn. With this researhc, we can better understand a part of relationships between the company's conversion strategy and the cell design strategies and outcomes.

  • PDF

A Brief Review on the Design Factors of Steam Generator U-Tube Assembly for CANDU Type Nuclear Power Plant

  • Park, Nam-Il;Park, June-Soo
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1996.05d
    • /
    • pp.321-326
    • /
    • 1996
  • During the plant operation, steam generator U-tube assembly will potentially be subject to adverse environmental conditions which can cause damages to them. This report addresses the major design factors of CANDU type steam generator which are intended to minimize the potential tube damages. Such factors include U-tube material, high circulation ratio, tube-to-tubesheet joint, tube support design. Also a few suggestions are presented for the design and performance improvement of CANDU type steam generators.

  • PDF

A Economic Evaluation for APR+ Standard Design (APR+ 표준설계에 대한 경제성 분석)

  • Ha, Gag-Hyeon;Lee, Jae-Ho
    • Journal of Energy Engineering
    • /
    • v.25 no.1
    • /
    • pp.43-47
    • /
    • 2016
  • KHNP CRI has developed APR+ nuclear power plant since 2007, which is GEN III+ model with 1500 MWe capacity. To develop safer nuclear power plant than APR1400, we investigated advanced design features of ALWR being constructed in Korea and being developed/constructed in foreign countries. We applied the advanced design features and lessons learned from Fukushima accident to develop APR+ standard design suitable for both domestic construction and overseas construction business. One economic assessments have performed during safety design improvement phase(2013.1 ~ 2015.12) of APR+. The result of the economic analysis for APR+ safety inhancement design showed that APR+ N-th plant is about 39.2% more economical than coal-fired 1,000MW power plant. Also APR+ plant is more cost advantage over foreign advanced nation ALWRs.

Hydraulic Cylinder Design of Lifting Pump Mounting and Structural Safety Estimation of Mounting using Multi-body Dynamics (다물체 동역학을 이용한 양광펌프 거치대의 유압 실린더 설계 및 구조 안전성 평가)

  • Oh, Jae-Won;Min, Cheon-Hong;Lee, Chang-Ho;Hong, Sup;Kim, Hyung-Woo;Yeu, Tae-Kyung;Bae, Dae-Sung
    • Journal of Ocean Engineering and Technology
    • /
    • v.29 no.2
    • /
    • pp.120-127
    • /
    • 2015
  • When a deep-seabed lifting pump is kept this device has bending and deformation in the axis due to its long length(8m). These influences can be caused a breakdown. Therefore, a mounting must be developed to keep the lifting pump safe. This paper discusses the hydraulic cylinder design of the lifting pump and structural safety estimation of the mounting using SBD(simulation-based design). The multi-body dynamic simulation method is used, which has been used in the automotive, structural, ship building, and robotics industries. In this study, the position and diameter of the hydraulic cylinder were determined based on the results of the strokes and buckling loads for the design positions of the hydraulic cylinder. A structural dynamic model of the mounting system was constructed using the determined design values, and the structural safety was evaluated using this dynamic model. According to these results, this system has a sufficient safety factor to manufacture.

Man-hour Reduction with a Regulatory Review Program for a Pressure Vessel Design (관련규정 검토 프로그램 활용 시 압력용기 설계시간 단축 효과)

  • Joo, Jung-Min;Yoo, Ho-Seon
    • Plant Journal
    • /
    • v.8 no.1
    • /
    • pp.60-72
    • /
    • 2012
  • In this study to reduce the review time of the pressure vessel regulations pressure vessel legislation review program has been developed. During the course of this research program to develop the domestic construction in a real project, saving 47% of the time was found.

  • PDF

A Design of Control Network for DCS in Nuclear Power Plant (원전 DCS용 제어통신망 설계)

  • 이재민;박태림;문홍주;권욱현
    • Proceedings of the IEEK Conference
    • /
    • 2000.06a
    • /
    • pp.85-88
    • /
    • 2000
  • Distributed Control System(DCS) is one of the best solutions to implement control systems because it provides continuous observation of control process and execution of commands to induce proper operations. In this paper, a design of control network for DCS in nuclear power plant is proposed. The proposed control network on DCS has a simple architecture and deterministic property. Thus, the proposed control network offers hard real-time periodic service. It also has redundant media for the fault-tolerance. As a result, high safety and reliability required in nuclear power plant are guaranteed.

  • PDF