• 제목/요약/키워드: Plant construction

Search Result 2,239, Processing Time 0.033 seconds

A Fundamental Research for Technology area of SCM in Korean Nuclear Power Plant Construction (원전건설 공급망관리 기술영역 도출을 위한 기초연구)

  • Park, Hang-Soon;Kim, Woo-Jung;Chong, Young-Whan;Won, Seo-Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.268-270
    • /
    • 2013
  • The construction project can be defined as a network combined between elements which are engineering, procurement, construction, start-up, and has a plenty of subjects and partners. For the successful project management in construction industry, it is necessary to adopt various management methods, such as lean production, information network system, SCM(Supply Chain Management), which can increase the efficiency of project management. During recent years, even though various management techniques have been applied, the SCM system has not formulated in construction industry. Especially, the Nuclear Power Plant Construction which requires high regulations of the safety and security has not applied SCM. Therefore, this study aimed to propose technology area of SCM in Korean Nuclear Power Plant Construction.

  • PDF

Analysis of Construction-phase Risk Factors for SMEs' Advance into the Overseas Plant Construction Projects

  • Park, Moonsun;Lee, Kyosun
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.328-331
    • /
    • 2017
  • The purpose of this study is to derive construction-phase risk factors in SMEs' advance into overseas plant construction projects. For this, construction-phase risk factors were investigated on the basis of the analysis of Korean construction companies, overseas plant industry-related research institutes, and overseas data. In addition, major risk factors were derived from the investigated construction-phase risk factors, and quantitative risk factors and qualitative risk factors were analyzed and derived from these major risk factors, by the use of three rounds of the Delphi analysis.

  • PDF

Research on the Methode of Construction Information Management Considering the Nuclear Power Plant Life Cycle (원자력발전소 생애주기를 고려한 시공정보 관리방안 연구)

  • Byon, Su-jin;Lee, Sang-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.229-230
    • /
    • 2016
  • The Nuclear Power Plant construction industry has the related to Information-integration field. In this study, the end user developed an Information Management System early in the project, and developed a management structure that systematically integrates and interfaces with information in each life-cycle phase. Particularly this paper related to the construction information of component.

  • PDF

Development of KMS system Prototype for Increasing Plant Construction Competitiveness (플랜트 건설의 경쟁력 향상을 위한 KMS 시스템 프로트타입 개발)

  • Koh, Sung-Won;Jun, Young-Joon;Koo, Ja-Kyung;Lee, Tai-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.725-728
    • /
    • 2008
  • According to this plant construction trends, the future plant construction will be very complex, specialization and oversize, so it is expected that future plant construction will create high-profits and require the connection between high-technology and construction method. To catch this advance, more detail business management plan and knowledge sharing technology are needed as basic element. Consequently, this study will analyze the status of current plant industry and develop the educational curriculum for plant business participants, and based on study outcome, this study will propose that web-based portal system by Knowledge Management System(KMS) prototype to fit each company's characteristics.

  • PDF

THE STUDY ON THE PROBLEMS OF MARITIME FACILITIES(GAS PLANT) INSURANCE REGULATIONS

  • Keun-Hyung Park;Moon-Sun Park ;Moon-Hwan Hwang;Yong-Su Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1576-1581
    • /
    • 2009
  • The purpose of this study is to provide the problems of insurance system of maritime facilities(Gas Plant) in korea. In order to find out the problems of insurance system of construction work, the literature research and case study on the maritime facility construction are adopted as research method. And this study analyzed the construction cases of maritime facilities(Gas Plant) to which the national contract law was applied for the first time. The findings of this study are as follows: In the case analysis of 00 facility construction, the contractor pay additional insurance fees for the construction. And the regulations on insurance registration are not stated clearly relating to the enforcement ordinance of the national contract law.

  • PDF

Design and Implementation of Case-Based Reasoning System for Knowledge Management : The Case Study of Plant Construction Division of 'H' Cooperation (지식경영을 위한 사례기반추론 시스템의 설계 및 구축 : 'H'기업의 플랜트 건설 프로젝트 적용사례)

  • Jang, Gil-San
    • The Journal of Information Systems
    • /
    • v.18 no.3
    • /
    • pp.231-249
    • /
    • 2009
  • Recently, plant construction industries are enjoying a favorable business climate centering around developing countries and oil producing countries rich in oil money. This paper proposes a methodology of implementing case-based reasoning(CBR) system for managing knowledge like lessons learned and various documents accumulated in performing power plant construction projects which are receiving a lot of order from foreign countries such as the Middle East, etc. Our methodology is consisted of 10 steps : user requirement gathering, information modeling, case modeling, case base design, similarity function design, user interface design, case base building, CBR module development, user interface implementation, integration test. Also, to illustrate the effectiveness of proposed methodology, the real CBR system is implemented for the plant business division of 'H' company which has international competitiveness in the field of plant construction industry. At present, the implemented CBR system is successfully utilizing as storing, sharing, and reusing knowledge which is accumulated in performing power plant construction projects in the target enterprise.

  • PDF

A Study on the safety management condition and disaster reduction measures of plant construction projects -focusing on chemical engineering plants- (플랜트 건설 사업 안전관리 실태 및 재해 저감 방안 연구 -화공 플랜트를 중심으로-)

  • Kim, Seung-Han;Lee, SUNG-ll
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.4
    • /
    • pp.87-94
    • /
    • 2017
  • The purpose of this study is to provide basic data to help ensure the safety and enhance industrial competitiveness of plant construction projects by analyzing the safety management status of, mainly, chemical engineering plant construction projects, and proposing specific measures and models to reduce human/educational, technical/systemic, institutional disasters. This study was done using literature research and case study/empirical study methods. The results of this study are summarized as follows. First, we classified the major disasters from the quarterly released 'major diaster cases in construction business' from Korea Occupational Safety and Health Agency according to the type of construction and presented the causes and prevention measures.

A Fundamental Research for Adaptation Method of SCM in Korean Nuclear Power Plant Construction (원전 건설공사를 위한 공급망관리체계 적용방안에 대한 기초연구)

  • Park, Hang-Soon;Won, Seo-Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.229-231
    • /
    • 2012
  • The supply chain in plant construction project can be defined as a network combined between elements which is engineering, procurement, construction, start-up. For successfully leading construction project, close relation and mutual cooperation should be preceded and Supply Chain Management(SCM) system is needed to improve the relation. In particular, because safety is a top priority for the companies work in the construction of Nuclear Power Plant(NPP), it is necessary to control all parties realated with NPP construction systematically. In this situation, it is important to purchase high-quality equipment in timely manner by developing Integrated cooperative systems. Therefore, this study aimed to propose developing solutions of SCM such as JIT and Envelop Design system, which can reduces difficulties of decision making between the parties involved in the project and will increase the efficiency of the engineering process in NPP.

  • PDF

Development and Application of Integrated Management System in Nuclear Power Plant Construction Project

  • Lee, Sang Hyun;Byon, Su Jin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.700-701
    • /
    • 2015
  • Nuclear power plant construction project can be called essential to establish a systematic project management system compared to other construction projects, taking into account the size and complexity and safety. To develop into a project management system for the Korea situation with the ongoing construction of the nuclear power plant was directed to promote nuclear power project management. In this paper, we introduce a comprehensive project management system for nuclear power projects. Currently considering the nuclear life cycle design, construction, and was developed by considering the flow of information to operate, and test each step linkage. The systems in English were developed to meet owner's requirements for advancing into overseas projects. Another point is that the systems were developed by management module, so that functions of each area can be selectively applied. It is expected that the system will establish itself as one that can be used for the entire lifecycle of nuclear power plants through gradual and systematic establishment of necessary data.

  • PDF

A Study on the Risk Level of Work Types in Nuclear Power Plant Construction (원자력발전소 건설공사의 공종별 위험도에 관한 연구)

  • Lee, Jong-Bin;Lee, Jun Kyung;Chang, Seong Rok
    • Journal of the Korean Society of Safety
    • /
    • v.28 no.3
    • /
    • pp.95-99
    • /
    • 2013
  • The goal of this study was to investigate some significant factors to influence level of safety at plant construction field and analyze degree of risk by work classification. Currently, there are lots of construction fields for the nuclear power plant for electricity generation, and our government also planned constructing more nuclear power plant in near future. However, much of the safety literature neglected the degree of risk factors on the plant construction field. Safety managers participated in the brainstorming session for drawing decision criteria of the degree of risk (i.e., significant factors). Then, they were asked to answer a structured questionnaire which was developed for drawing most important factors. Finally, the analytic hierarchy process (AHP) was used to analyze level of risk by work classification. The following results were obtained. First, total twelve factors judging degree of risk were found in the brainstorming session. Second, the questionnaire showed four significant factors, including number of workers, working environments, skill of craft and accident experience. Third, the results of AHP showed Architecture work is the most dangerous work among 6 work types. The results could be used to reduce degree of risk in construction field of the nuclear power plant.