• Title/Summary/Keyword: Plant Project Management

Search Result 263, Processing Time 0.024 seconds

모니터 소재의 색상편차 개선을 위한 6시그마 프로젝트 (A Six Sigma Project for Reducing the Color Variation of the Monitor Materials)

  • 홍성훈;반재석
    • 품질경영학회지
    • /
    • 제29권3호
    • /
    • pp.166-176
    • /
    • 2001
  • This paper considers a six sigma project for reducing the color variation of the monitor materials in a chemical plant. The project follows a disciplined process of five macro phases: define, measure, analyze, improve, and control (DMAIC). A process map is used to identify process input variables. Three key process input variables are selected by using an input variable evaluation table; a melting pressure, a coloring agent, and a DP color variation. DOE is utilized for finding the optimal process conditions of the three key process input variables. The sigma level of defects rate becomes a 4.58 from a 2.0 at the beginning of the project.

  • PDF

원자력 발전 플랜트 RCB 시공의 리스크 요인에 관한 분석 모델 (Analysis Model on Risk Factors of RCB Construction in Nuclear Power Plant)

  • 신대웅;신윤석;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.212-213
    • /
    • 2014
  • The purpose of this study is to suggest analysis model of RCB construction in nuclear power plant. For the objective, This study drew the risk factors of RCB construction from existing literature. The results of the study proposed analysis model made hierarchy in rebar, form, and concrete work. These will be baseline data for risk management in construction project of nuclear power plant.

  • PDF

플랜트 FEED 설계를 위한 시스템엔지니어링 기술프로세스 적용방안 연구 - 환경플랜트 사례를 중심으로 (A Study on Application of Systems Engineering Technical Process to FEED in Plant construction Industry - focused on a case of Environmental Plant)

  • 기완욱;김준필;홍대근;서석환
    • 시스템엔지니어링학술지
    • /
    • 제9권2호
    • /
    • pp.37-53
    • /
    • 2013
  • With rapid growth of the world plant market, an increasing attention is paid on the plant engineering. Up to present time, Korean plant engineering technology has been concerned with the down stream part of the plant engineering, so called EPC, considered as a lower value chain compared with the up stream, composed of FEED(Front End Engineering Design) and PMC(Project Management Consultancy). In other words, a key issue for Korean plant industry is how to catch up the FEED technology, currently occupied by the advanced countries. In this paper, we propose an SE(Systems Engineering) approach, conventionally applied for aerospace and defense industry, to the FEED for plant engineering. Specifically, we proposed a new SE process composed of: 1) SPA matrix for reverse systems engineering, and 2) PPA matrix for forward systems engineering. To illustrate the proposed method, a case study for an environmental plant is performed.

해외 플랜트 건설사업의 타당성 분석 문제점 및 개선방안 (Problem Analysis and Improvement Strategy for Feasibility Analysis of Overseas Plant Construction Projects)

  • 이원규;박문선;김용수
    • 한국건설관리학회논문집
    • /
    • 제11권5호
    • /
    • pp.3-14
    • /
    • 2010
  • 본 연구는 EPC LSTK 프로젝트의 계획단계에서 계약자가 수행하는 타당성 분석사례들을 조사 및 분석하고, 이에 대한 문제점 및 개선방안 제시를 위하여 수행되었다. 이를 위하여 GCC 국가를 대상으로 한 5개의 타당성분석에 대한 사례를 조사하고 이를 분석하였다. 상기와 같은 목적과 방법에 따라 진행된 본 연구의 결과를 요약하면 다음과 같다. 1) 타당성 분석시 고려변수 등에 대한 영향요인 분석 미흡으로 원가상승, 공기지연 초래 및 품질저하의 문제점이 존재하는 것으로 분석되었다. 2) 상기의 문제점을 바탕으로 원가상승에 대한 문제, 공기지연에 대한 문제, 품질저하의 문제에 대해 타당성 분석 차원의 개선방안을 제시하였다. 3) 해외 플랜트 공사에 있어 상기에서 분석한 문제점 및 개선방안을 준용할 수 있는 사업 타당성 분석 프로세스를 단계 별로 제시하였다.

ANALYSIS ON THE EVALUATION OF PROJECT EFFICIENCY BASED ON BUDGET EXECUTION: PLANNED OUTAGE MAINTENANCE (POM) FOR ELECTRICITY POWER PLANT

  • Sungkon Moon;Sangwon Han;Myoungwon Kang
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.66-73
    • /
    • 2011
  • With rapid industrialization, electric power consumption has been increasing every year in Korea and in other countries. The provision of additional power stations to produce more electricity is one possible response to this steady increase in consumption. Another alternative is to improve the efficiency of existing stations through timely and effective maintenance works. Since the construction of a new power plant involves a large amount of capital as well as difficulties in the selection of sites, the improvement of existing power stations' efficiencies is often a preferred solution. Therefore, this paper focuses on maintenance project management to address this issue. Among several types of maintenance works, this paper concentrates on planned outage maintenance (POM). This focus arises from the critical impact of POM on other maintenance work, as well as the entire process of electricity production. Unlike other maintenance work, POM is done on the basis of mid and long-term plans. In addition, only POM works are conducted during the outage of all power plants. To evaluate the efficiency of POM works, budget data relating to 164 POM projects between 2001 and 2008 was collected from 7 sites in South Korea. Data envelopment analysis (DEA) was selected as a methodology for evaluation. From this analysis, comparative study was used to determine the categories of projects that had performed well, and those with the most optimized budget structures. Moreover, through discussion with industry, this research develops a feasible proposed method by which to enhance the efficiency of POM projects.

  • PDF

Forest Structure and Composition in the Vicinity of Srinagar Hydroelectric Power Project in Alaknanda Valley, Garhwal Himalaya, India

  • Ballabha, Radha;Kuniyal, Archana;Tiwari, Prabhawati;Tiwari, Jay Krishan
    • Journal of Forest and Environmental Science
    • /
    • 제36권2호
    • /
    • pp.78-90
    • /
    • 2020
  • We studied forest structure and composition in the vicinity of Srinagar Hydroelectric Power Project in Alaknanda Valley, Garhwal Himalaya, India to provide baseline data for the management of forests. Eight sites were selected in the vicinity of power project based on elevation and species composition. Density varied from 650 to 340 ind ha-1 for trees and from 4,360 to 6,480 ind ha-1 for shrubs. TBC ranged from 35.02 to 54.02 ㎡ ha-1 for trees and from 0.875 to 2.628 ㎡ ha-1 for shrubs. On the basis of density and IVI, Pinus roxburghii was found dominant tree species in most of the sites, whereas among the shrubs, Carissa opaca was dominant. Dominance of Pinus roxburghii in most of the sites is an indication towards possible threat to associated species in the area. The dominance-diversity curve of trees showed a geometric distribution, whereas the shrubs displayed log-normal curves. The forest has rich and diverse species composition however; habitat degradation caused by the construction of Power Project might lead to reduction of plant species from the area. The information obtained from this study will be helpful in predicting possible changes in the forest ecosystem properties in near future after completion of the power project.

플랜트 4D의 효율적 공정연계체계를 위한 일정 및 도면의 개선된 연계방법론 구축 (Improved Link System of Schedule and 3D Object for Visualizing Effective 4D Model on Plant Project)

  • 강인석;문현석;박서영;윤선미
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.559-562
    • /
    • 2006
  • 기존의 4D시스템은 하나의 일정에 하나의 3D객체만을 연계하는 1:1링크체계를 활용하고 있으나, 방대한 수의 공정 및 3D Object를 가진 플랜트 시설의 특성을 고려하면 객체정보의 다중선택을 통한 일괄적인 링크체계를 구성할 필요가 있다. 이를 위해 본 연구에서는 플랜트 4D시스템 구축을 위한 개선된 일정 및 도면의 연계방법론으로서 다중객체의 표현방법론 및 양방향 연계방법론을 구성하였으며, 이를 위해 Interface Board 개념을 도입하였다. 즉, 현재 프로젝트에서 다중 링크되는 모든 항목들의 현황관리를 위한 별도의 전문화된 기능을 도입함으로서, 플랜트 4D시스템 구축의 개선된 링크방법론이 될 수 있고, 다중 링크과정에서 발생되는 각종 오류를 감소시킬 수 있을 것으로 기대된다.

  • PDF

RETScreen을 활용한 조력발전 개발사업 경제성 분석 - 아산만 조력발전소 사례를 중심으로 - (Economic Analysis for a Tidal Power Plant Project using RETScreen - Focused on the Tidal Power Plant in Asan Bay)

  • 김민옥;정근채
    • 한국건설관리학회논문집
    • /
    • 제14권4호
    • /
    • pp.152-163
    • /
    • 2013
  • 본 연구에서는 타 신재생에너지에 비해 영구적으로 사용이 가능하며, 예측가능한 대용량의 균질 에너지 생산이 가능하며, 발전효율이 높은 조력에너지를 활용하기 위한 조력발전 개발사업에 대한 경제적 타당성을 분석한다. 이를 위해, 세계적으로 청정에너지 프로젝트의 경제성 및 민감도 분석을 위해 널리 활용되고 있는 캐나다 천연자원부 산하의 CANMET 에너지기술센터에서 개발한 RETScreen을 활용하였다. 분석 대상 조력발전 개발사업과 관련된 자료가 총괄적으로 존재한다는 한계점에도 불구하고, RETScreen의 기능을 이용함으로써 기획단계에서 사업의 경제적 타당성을 검토하기에 충분한 예측력을 가진 분석 결과를 도출할 수 있었다. 경제성 및 민감도 분석 결과, 사업과 직접적으로 관련된 현금의 흐름만을 고려할 경우, 국내에서도 조력발전 개발사업은 충분한 경제성을 갖고 있으며 탄소배출권 시세와 전력 판매단가의 상승폭에 따라 조력발전 사업의 경제성은 더욱 높아질 수 있을 것으로 예측되었다. 본 연구의 결과를 바탕으로, 자연환경을 파괴하지 않는다는 전제 아래 조력발전소의 건설이 활성화된다면, 가까운 미래에 닥쳐올 에너지 문제를 슬기롭게 해결할 수 있을 것으로 기대된다.

설계 전 단계에서의 CM 적용 사례 - 영주 신 제조창 CM 사례를 중심으로 - (The Case of CM as Applied to the Pre Design Phase - Focused on the Case of YongJu New Tobacco Manufacturing Plant -)

  • 박용준
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.19-26
    • /
    • 2003
  • 담배 제조공장의 노후화에 직면하여 경쟁력 확보, 현대화, 합리화, 환경친화 둥을 실현하고자 신제조창 사업이 구상되었으며, 이러한 목표 실현을 위해 사업 초기단계의 적절한 계획 및 검토가 필요하게 되었고, 이에 따라, 초기단계에 CM을 도입하게 되었다. 건물, 대지 등에 대한 타당성 검토, 공장건설 기본계획 수립 및 제조시설의 선정, 건설공사 발주용 입찰안내서 작성 등의 설계 전 업무부터 준공 후 유지관리까지 사업 전반에 걸쳐 CM업무를 수행하였다. 영주 신 제조창 CM은 다른 턴키프로젝트와는 달리 기본설계 이전에 분야별 전문성이 확보된 CM단이 조직되어 활동을 시작하였다. 이에 따라 본 연구에서는 사례프로젝트의 설계 전 단계에서 실제 수행된 CM업무들을 분석${\cdot}$평가한다. 이를 통해 설계 전 단계 CM업무의 중요성을 강조하고, 향후 CM 투입 시점이 설계 전 단계로 변화하는데 일조하고자 한다.

  • PDF

Basic Study on the Assembly Process Design of Curtain-wall System for Minimization of Carbon Emission

  • Yi, June-Seong
    • 한국건축시공학회지
    • /
    • 제12권6호
    • /
    • pp.648-663
    • /
    • 2012
  • With recent attempts to improve quality and productivity, the prefabrication manufacturing system has been occupying an increasing share of the construction area. To minimize site work, material is more frequently being produced and partially assembled at a plant, and then installed at a site. For this reason, the production process is being divided and the materials are being delivered to the site after passing through multiple plants. With these changes in the production process, the materials delivery plan is becoming an important management point. In particular, as road transportation using trucks has a 71 percent share of the domestic transportation market, selecting the proper transportation path is important when delivering materials and equipment to a site. But the management system at the project design phase to calculate the delivery cost by considering the production process of the pre-fab material and the $CO_2$ emission at the material delivery phase is currently lacking. This study suggests a process design model for assembly production of the pre-fab material and transportation logistics based on carbon emission. The suggested model can be helpful to optimize the location of the intermediate plant. It is expected to be utilized as a basic model at the project plan and design phase when subcontractors make decisions on items such as materials procurement, selecting the production method, and choosing the location of the assembly plant.