• Title/Summary/Keyword: Planning Process

Search Result 4,192, Processing Time 0.032 seconds

Development of a planner of processing equipments for heterarchical SFCS (Heterarchical SFCS 를 위한 가공기계의 Planner 모듈 개발)

  • Kim, Hwa-Jin;Cho, Hyun-Bo;Jung, Moo-Young
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.22 no.4
    • /
    • pp.719-739
    • /
    • 1996
  • A common control model used to implement computer integrated manufacturing(CIM) is based on the hierarchical decomposition of the shop floor activities, in which supervisory controllers are responsible for all the interactions among subordinates. Although the hierarchical control philosophy provides for easy understanding of complex systems, an emerging manufacturing paradigm, agile manufacturing, requires a new control structure necessary to accommodate the rapid development of a shop floor controller. This is what is called autonomous agent-based heterarchical control. As computing resources and communication network on the shop floor become increasingly intelligent and powerful, the new control architecture is about to come true in a modern CIM system. In this paper, heterarchical control is adopted and investigated, in which a controller for a unit of device performs three main functions - planning, scheduling and execution. Attention is paid to the planning function and all the detailed planning activities for heterarchical shop floor control are identified. Interactions with other functions are also addressed. In general, planning determines tasks to be scheduled in the future. In other words, planning analyzes process plans and transforms process plans into detailed plans adequate for shop floor control. Planning is also responsible for updating a process plan and identifying/resolving replanning activities whether they come from scheduling or execution.

  • PDF

CAD Interface for Block Assembly Planning using Open CASCADE (Open CASCADE를 이용한 블록조립 계획용 CAD 인터페이스)

  • 최상수;신동목
    • Journal of Ocean Engineering and Technology
    • /
    • v.18 no.3
    • /
    • pp.26-31
    • /
    • 2004
  • This paper presents a process planning system that will generate and verify assembly sequences of block assemblies. It consists of a CAD interface system and an assembly sequence planning system. In developing this system, we used an open architecture CAD kernel for the CAD interface system, for visualizing the CAD model and the assembly sequences, and an expert system shell for the assembly sequence planning system. This paper also proposes a framework for the integration of all the steps required to automate the procedures, from design to production. The process planning system is demonstrated by a simple example.

Development of A CAPP System Based on Case-Based Reasoning (Case-Based Reasoning을 이용한 자동공정계획 시스템의 구축)

  • 이홍희;이덕만
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.21 no.46
    • /
    • pp.181-196
    • /
    • 1998
  • The aim of this research is the development of a CAPP system which can use the old experience of process planning to generate a process plan for a new part and learn from its own experience using the concept of stratified case-based reasoning(CBR). A process plan is determined through the hierarchical process planning procedure that is based on the hierarchical feature structure of a part. Each part and case have their own multiple abstractions that are determined by the feature structure of the part. Retrieving the case in stratified case-based process planning is accomplished by retrieving the abstraction that is most similar to the input part abstraction in each abstraction level of the case-base. A new process plan is made by the adaptation that translates the old case's process plan into the process plan of a new part. Operations, machines and tools, setups and operation sequence in each setup are determined in the adaptation of abstraction using some algorithms and the reasoning based on knowledge-base. By saving a new part and its process plan as a case, the system can use this new case in the future to generate a process plan of a similar part. That is, the system can learn its own experience of process planning. A new case is stored by adding the new abstractions that are required to save as the new abstraction to the existing abstractions in the case-base.

  • PDF

A Study on Implementation of Automobile Control Software Testing Process Based on TMMi (TMMi 기반 자동차 제어 SW 테스팅 프로세스 구축에 관한 연구)

  • Jang, Jin-Wook
    • Journal of Information Technology Services
    • /
    • v.8 no.3
    • /
    • pp.159-169
    • /
    • 2009
  • The issue of method of software testing process implementation has recently been in the spotlight in korea and some vendor make every effort to improve the software testing process through the evaluation of TMMi. The level of software process is at initial level, nevertheless, so the high quality of software is not guaranteed. This paper apply to the TMMi Level2 Assessment criteria of Automobile control software testing process. The test policy and strategy, test planning, test monitoring and control, test design and execution, test environment goal. The result need to emerge development process connection on the test policy and strategy process, test planning process etc. Also, the study analyzed the infra structure to reach the repeated level via key process area. As the result the process implementation in organization suggests the policy development and the implementation activity. Finally, the practical can refer to this paper in order to implementation the software testing process.

The Analysis of the Process Elements and the Characteristics of Biologists' and Gifted Students' Designing Experiment Activities (생물학자와 과학영재의 실험설계활동에서 나타나는 과정요소 및 특성 분석)

  • Yang, Il-Ho;Ryu, Seol-Jin;Lim, Sung-Man
    • Journal of Science Education
    • /
    • v.33 no.2
    • /
    • pp.271-289
    • /
    • 2009
  • The purpose of the research was to analyze the characteristics and the process elements which appeared to the process of designing experiment for biologists and gifted students in science. Four biologists and thirty-two gifted students were participated in this study. The findings indicated that (a) the researcher figured out the process elements could constructed in fifteen elements such as confirming questions, arrange materials, consideration for experimental subjects, searching variables, eliminating variables, selecting variables, planning operation of variables, planning control environmental variables, planning control biological variables, planning the methods of observation and assessment, planning the methods of collecting data, planning the interpretation of data, planning the repetition of experiments, planning the repetition of assessment, safety regulations as well. The biologists concentrated in the particular process elements related with variables, since the science-gifted students concerned the performance whole process elements themselves without deeper consideration, (b) the characteristics of biologists and science-gifted students in the process of designing experiment were as follows; 1) biologists and students showed the process elements which include the domain specific process skills as well, 2) biologists accurately conducted the designing experiments processes with repetition of specific process, since students designed experiments conventionally, and 3) biologists possessed the domain specific skills and know-how about their experiments, but students did not. The results show that the programs of designing experiment activity should be constructed with the process elements which were concentrated by biologists, should provide feedbacks to design experiment more accurately, and should be developed with concern of the process skills and know-hows of biologists.

  • PDF

An Automated Process Planning and Die Design System for Quasi-axisymmetric Cold Forging Product (준축대칭 제품의 냉간단조 공정설계 및 금형설계 자동화 시스템 개발)

  • Park, Jong-Ok;Lee, Joon-Ho;Jung, Sung-Yuen;Kim, Chul;Kim, Moon-Saeng
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.19 no.1
    • /
    • pp.107-118
    • /
    • 2002
  • This paper deals with an automated computer-aided process planning and die design system by which designer can determine operation sequences even if they have a little experience in process planning and die design of quasi-axisymmetric cold forging product by cold former working. The approach to the system is based on knowledge-based rules and a process knowledge base consisting of design rules is built. Knowledge for the system is formulated from plasticity theories, empirical results and the empirical knowledge of field experts. Programs for the system have been written in AutoLISP for the AutoCAD using a personal computer. An attempt is made to link programs incorporating a number of expert design rules with the process variables obtained by commercial FEM softwares, DEFORM and ANSYS, to form a useful package. The system is composed of three main modules and five sub-modules. The process planning and die design module considers several factors, such as the complexities of preform geometry, punch and die profiles, specifications of available cold farmer, and the availability of standard parts. As the system using 2D geometry recognition is integrated with the technology of process planning, die design, and CAE analysis, the standardization of die parts for wheel bolt requiring cold forging process is possible. The developed system makes it possible to design and manufacture quasi-axisymmetric cold forging product more efficiently.

An automated process planning 8 die design using expert system for blanking or piercing of irregular shaped sheet metal products (불규칙성 박판제품의 프로그래시브 다이설계를 위한 자동화된 CAD시스템)

  • Kim, J. H.;Kim, C.;Choi, J. C.;Kim, B. M.
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1995.10a
    • /
    • pp.214-218
    • /
    • 1995
  • Much labor, an exceedingly long lead time, and the skills of experienced engineers are required for press tool design. To reduce such problems, several CAD systems for blanking or piercing have been developed. This paper describes a computer-aided design for blanking or piercing of irregularly shaped sheet metal products. An approach to the system is based on knowledge base rules. The process planning & die design system is designed by considering several factors, such as complexity of blank geometry, punch profile, and availability of press equipment and standard parts. Therefore, after checking a production feasibility for irregular shaped sheet metal products, this system which is implemented strip layout module can carry out a process planning and generate the strip layout in graphic forms. Also this system implemented die layout module can carry out a die design for each process which is obtained form the result of an automated process planning and generate parts and assembly drawing of a die set.

  • PDF

Decomposition-based Process Planning far Layered Manufacturing of Functionally Gradient Materials (기능성 경사복합재의 적층조형을 위한 분해기반 공정계획)

  • Shin K.H.;Kim S.H.
    • Korean Journal of Computational Design and Engineering
    • /
    • v.11 no.3
    • /
    • pp.223-233
    • /
    • 2006
  • Layered manufacturing(LM) is emerging as a new technology that enables the fabrication of three dimensional heterogeneous objects such as Multi-materials and Functionally Gradient Materials (FGMs). Among various types of heterogeneous objects, more attention has recently paid on the fabrication of FGMs because of their potentials in engineering applications. The necessary steps for LM fabrication of FGMs include representation and process planning of material information inside an FGM. This paper introduces a new process planning algorithm that takes into account the processing of material information. The detailed tasks are discretization (i.e., decomposition-based approximation of volume fraction), orientation (build direction selection), and adaptive slicing of heterogeneous objects. In particular, this paper focuses on the discretization process that converts all of the material information inside an FGM into material features like geometric features. It is thus possible to choose an optimal build direction among various pre-selected ones by approximately estimating build time. This is because total build time depends on the complexity of features. This discretization process also allows adaptive slicing of heterogeneous objects to minimize surface finish and material composition error. In addition, tool path planning can be simplified into fill pattern generation. Specific examples are shown to illustrate the overall procedure.

A multiobjective evolutionary algorithm for the process planning of flexible manufacturing systems (유연제조시스템의 공정계획을 위한 다목적 진화알고리듬)

  • 김여근;신경석;김재윤
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.29 no.2
    • /
    • pp.77-95
    • /
    • 2004
  • This paper deals with the process planning of flexible manufacturing systems (FMS) with various flexibilities and multiple objectives. The consideration of the manufacturing flexibility is crucial for the efficient utilization of FMS. The machine, tool, sequence, and process flexibilities are considered In this research. The flexibilities cause to increase the Problem complexity. To solve the process planning problem, an this paper an evolutionary algorithm is used as a methodology. The algorithm is named multiobjective competitive evolutionary algorithm (MOCEA), which is developed in this research. The feature of MOCEA is the incorporation of competitive coevolution in the existing multiobjective evolutionary algorithm. In MOCEA competitive coevolution plays a role to encourage population diversity. This results in the improvement of solution quality and, that is, leads to find diverse and good solutions. Good solutions means near or true Pareto optimal solutions. To verify the Performance of MOCEA, the extensive experiments are performed with various test-bed problems that have distinct levels of variations in the four kinds of flexibilities. The experiments reveal that MOCEA is a promising approach to the multiobjective process planning of FMS.

A Case Study on Strategic Planning in NASA In the Perspective of Strategic Planning in Publicly funded R&D Organizations (미 항공우주국 (NASA)의 전략기획에 대한 사례 연구 - 공공 연구개발 조직의 전략기획의 관점에서)

  • Kwon Ki-Seok;Lee Kyu-Hyun
    • Journal of Science and Technology Studies
    • /
    • v.4 no.2 s.8
    • /
    • pp.103-127
    • /
    • 2004
  • This paper analyzes the strategic planning process of NASA (National Aeronautics and Space Administration) including its center, GSFC (Goddard Space Flight Center) in the framework of strategic planning in publicly funded R&D organizations. To construct this framework, theories have been considered mainly focused on strategic management and planning, its application on public sector, and characteristics of R&D activities. As a result, the framework could be set up in accordance with the process of strategic planning. Also, as a case study, we explored the practice of strategic planning process and organizational implementation of NASA and GSFC. During the analysis on the strategic process of NASA and GSFC, we could draw some lessons out as follows: First, we should consider the differences between private and public sectors when we establish strategic planning in public sector. Second, the stakeholder analysis should be involved in setting the mission, goals, and strategies of an organization. Third, it is necessary to identify and assess the socio-economic effects or public benefits by R&D programs of the organization and use the feedback on its goal. Fourth, to implement strategic planning effectively, planning process should be closely integrated with the management process such as setting goals, securing budgets, and evaluating the organization. Conclusively, the analysis on NASA and GSFC contribute to implementing strategic planning in publicly funded R&D organizations by providing the appropriately modified framework. As an extension of this study, more deliberate analysis on various practices of strategic planning and performance indicators should be followed.

  • PDF