• 제목/요약/키워드: Planning BOM

검색결과 32건 처리시간 0.024초

Modular BOM을 활용한 와이어링 하네스 원가 산출 (Using a Modular BOM for Cost Calculation in Wiring Harness)

  • 임창성;박훈;강정태
    • 한국CDE학회논문집
    • /
    • 제21권1호
    • /
    • pp.61-68
    • /
    • 2016
  • Since past till now, automotive wiring harness has been designed and produced under the method of part number list. However, the number of options has increased gradually on the basis of customer's needs and car manufacturer's policy, thereby bringing about an increase in the number of classified parts. Because of a large number of classified parts, cost estimates for manufacturing and production planning are more important than ever. However, the pre-existing manufacturing bill of material abbreviated as BOM is only focused on the list of materials used for actual manufacturing, and as such there have been limits to other fields or areas of usage except for manufacturing. In essence, the present paper is concerned with our study conducted on modular BOM as one of planning BOM. On such basis, we have been able to completely use a method by which to have access, make an option units' calculation in wiring harness manufacturing, and build an efficient system for cost estimates in manufacturing as well.

선박 의장 BOM을 Lifecycle을 고려한 BOM 통합 방안 연구 (Integration of Ship Outfitting BOM with Lifecycle Stages)

  • 김대석;이경호;이장현;이정민;이광;김진호
    • 한국CDE학회논문집
    • /
    • 제16권3호
    • /
    • pp.187-196
    • /
    • 2011
  • Generally, BOM (Bill of Material) means a part list which is needed to manufacture or assemble a product or part. During manufacturing processes, BOM is inevitably required for most of enterprise processes such as design, procurement, production planning/control, resource planning, and financial works. Every manufacturing industry uses many kinds of BOM's that are adjusted to the requirement of functions of their work division. Moreover, BOM evolves in different forms according to the product development phases such as conceptual design; function design, detail design, and production design because it is necessary to use different product structures to keep product data generated throughout the lifecycle of a product. This includes all data and information related to the all the product development phases. Shipbuilding works also are processed and controlled based on BOM. However, effective maintenance of ship outfitting BOM data is getting difficult as the amount and complexity of data have increased due to variety and long lifecycle of ship. For the effective management of outfitting BOM data, two aspects must be considered. One is how to classify numerous BOMs type and the others how to display BOMs. So this study suggests a method to classify BOM types and propose two categories - Structure BOM, Display BOM. Base on this result, we propose the integrated ship outfitting BOMs model and analysis outfitting BOMs.

수주생산 환경에서의 CIM 시스템을 위한 BOM과 라우팅의 구조화 -조선산업 사례 중심- (Structuring of BOM and Routings for CIM System In Make to Order Environments -Application of CIM System for Ship Production-)

  • 황성룡;김재균
    • 산업공학
    • /
    • 제15권1호
    • /
    • pp.26-39
    • /
    • 2002
  • Two key data areas of the integrated production database in computer-integrated manufacturing (CIM) systems are the product structure in the forms of bills of material(BOM) and the process structure in the forms of routings. The great majority of existing information systems regard the BOM and routing as two separate data entities, possibly with some degree of cross-referencing. This paper proposes new information structure called the bills of material and routings(BMR) that logically integrates the BOM and routings for the CIM systems in ship production. The characteristics of ship production are described as: 1) make-to-order production type, 2) combined manufacturing principles (workshop production and construction site production), 3) significant overlapping of design, planning and manufacturing, 4) very long order throughput time, 5) complex product structure and production process. The proposed BMR systematically manages ail parts and operations data needed ship production considering characteristics of ship production. Also, the BMR situated on the integrated production database more efficiently supports interface between engineering and production functions, and integrates a wide variety of functions within production such as production planning, process planning, operation scheduling, material planning, costing etc., and simplifies information flow between sub-systems in CIM systems.

선박 배관 설계를 위한 Enterprise BOM의 설계와 구현 (An Implementation Enterprise BOM for Marine Vessel of Pipe Equipment)

  • 김승현;이장현;김광식;전정익
    • 한국CDE학회논문집
    • /
    • 제16권1호
    • /
    • pp.41-51
    • /
    • 2011
  • Both enterprise information systems and CAD utilizes the BOM (Bill of Material) as the means of collaborative integration during the product design and production since the BOM has been commonly used for design, production planning, procurement, and production works. Therefore, BOM can be the referential data when it expresses not only the part lists but also product information required by product development process. Outfitting design is one of major design works in marine vessel design since marine vessels have various outfitting systems and huge number of parts. Also, the outfitting BOM has the evolutional forms that change from the initial design to the production design. In order to express the product information and part list in the enterprise BOM and the evolutional BOMs in each lifecycle, enterprise BOM of outfitting that consists of structure BOM and display BOM is suggested. Thereafter, we have developed the prototype of enterprise BOM in which some features of the outfitting BOM are implemented.

트리 구조의 BOM(Bill of Material)에 기초한 고성능 MRP(Material Requirement Planning) 시스템 (High performance MRP(Material Requirement Planning) system based on tree-structured BOM(Bill of Material))

  • 나홍범;이형곤;박진우
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 2006년도 춘계학술대회 논문집
    • /
    • pp.601-602
    • /
    • 2006
  • The primary role of MRP(Material Requirement Planning) is to make a production plan so that we have an exact quantity of right materials on needed time at right place. But the ignorance on capacity constraints makes some problems whenever production schedule is established. To increase the performance of MRP system, a novel approach which is based on new input data structure is suggested. The new input data structure includes all the information about Material BOM, Routing and resource data so that we can easily examine the usage of resources and generate higher performance production plans.

  • PDF

자동차 산업의 경영 스피드 향상을 위한 Enterprise-BOM 구조 설계 (Enterprise-BOM design for management speed-up in the automotive industry)

  • 임경수
    • 한국산학기술학회논문지
    • /
    • 제14권3호
    • /
    • pp.1033-1039
    • /
    • 2013
  • 제품수명주기가 짧아지고 고객의 니즈가 다양화되고 있는 글로벌 시장에서 보다 빠른 신제품 설계와 개발을 위해서는 정보시스템의 도움이 필요하다. 본 논문에서는 자동차산업의 경영 스피드 향상을 위한 방안으로 제품에 관한 정보를 전사적으로 통합하는 Enterprise-BOM의 기본모델을 제시하였다. 여기에는 세가지 BOM의 종류를 포함하며, 내부 주요 데이터 구조설계를 진행하여 전사 일원화 관리를 지원할 수 있도록 자동차 산업의 차종, 등급, 옵션, 색사양 주문 사양 등의 주요 속성에 대한 데이터를 체계화하였다. 이를 통해 사양변화와 개발변경이 빈번한 환경하에서 신속하고 유연성 있는 개발이 가능할 것이다.

JIT 와 MRP 통합에 의한 CIM 추진 사례연구 (CIM Implementation through JIT and MRP Integration)

  • 이영규;신희준;김명선
    • 산업공학
    • /
    • 제7권3호
    • /
    • pp.39-51
    • /
    • 1994
  • A CIM implementation case is introduced in this paper. It is accomplished through the integration of two fundamental approaches to production planning and control; JIT and MRP. The resultant system is a hybrid where some JIT methodologies prevail, but the benefits of the MRP are also required. A new BOM structure called 'Family-BOM' is designed for the load leveled production with small lot size and the synchronized production. The overall production planning concept is described with actual data.

  • PDF

반복 조인(Join)을 이용한 관계형 논리 부품구성표(BOM) 데이타 베이스 설계와 그 효용성 분석 (Design and Effectiveness Analysis of Relational Logical BOM (Bill Of Material) Database using Repeated Join)

  • 이경우;정기원
    • Asia pacific journal of information systems
    • /
    • 제2권1호
    • /
    • pp.57-76
    • /
    • 1992
  • Material Requirement Planning(MRP) has been the most widely implemented large scale production management system in the manufacturing industry. Computerization of MRP systems involves, in general, Bill Of Material(BOM) explosion algolithms which usually takes heavy computation time. In order to improve the effectiveness of the MRP systems, we propose to build a logical BOM database in advance, which reflects the Join operations for the BOM explosion. It reduces the response time for the BOM indented explosion. It reduces the MRP processing time. It also increased main memory utilization.

  • PDF

조립 BOM 생성을 위한 병렬순서 추출 알고리듬 (A Parallel Sequence Extraction Algorithm for Generating Assembly BOM)

  • 여명구;최후곤;김광수
    • 대한산업공학회지
    • /
    • 제29권1호
    • /
    • pp.49-64
    • /
    • 2003
  • Although assembly sequence planning is an essential task in assembly process planning, it is known as one of the most difficult and time consuming jobs because its complexity is increased geometrically when the number of parts in an assembly is increased. The purpose of this study is to develop a more efficient algorithm for generating assembly sequences automatically. By considering subassemblies, a new heuristic method generates a preferred parallel assembly sequence that can be used in robotic assembly systems. A parallel assembly sequence concept provides a new representation scheme for an assembly in which the assembly sequence precedence information is not required. After an user inputs both the directional mating relation information and the mating condition information, an assembly product is divided into subgroups if the product has cut-vertices. Then, a virtual disassembly process is executed to generate alternate parallel assembly sequences with intermediate assembly stability. Through searching parts relations in the virtual disassembly process, stable subassemblies are extracted from translation-free parts along disassembling directions and this extraction continues until no more subassemblies are existed. Also, the arithmetic mean parallelism formula as a preference criterion is adapted to select the best parallel assembly sequence among others. Finally a preferred parallel assembly sequence is converted to an assembly BOM structure. The results from this study can be utilized for developing CAAPP(Computer-Aided Assembly Process Planning) systems as an efficient assembly sequence planning algorithm.

BIM 기반/스마트 BOM의 형상관리에 의한 전 생명주기를 고려한 철도건설사업관리 시스템 및 방법에 관한 고찰 (BIM-based Smart BOM by the Configuration Management of the Life-cycleconsidering the Railway Construction Project Management System and Method)

  • 정수영;이종성;박수중;이근영
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.2280-2285
    • /
    • 2011
  • As the prefecture railroad construction accelerates, unmanned system's reliability and safety is increasing in demand. Accordingly, effective management of construction projects for the PM and SE techniques are being applied, with the introduction and use of PMIS computerized systems. Due to the construction of railways, from the start of PMIS research planning, design, procurement, to construction and commissioning, various expertise is being carefully gathered, and by integrating it into the unified budget ideas and processes, rational, efficient, organized, and manageable financial plans are developed for the computerized system. However, the current PMIS does not take into account the life-cycle. This study is to bring attention to the BIM smart BOM-based configuration management for life-cycle through the consideration for railway construction project management.

  • PDF