  • In this paper, an advanced demand clustering algorithm which can explore the planned maintenance outage of generators in changed electricity industry is proposed. The major contribution of this paper can be captured in the development of the long-term estimates for the generation availability considering planned maintenance outage. Two conflicting viewpoints, one of which is reliability-focused and the other is economy-focused, are incorporated in the development of estimates of maintenance outage based on the advanced demand clustering algorithm. Based on the advanced clustering algorithm, in each demand cluster, conventional effective outage of generators which conceptually capture maintenance and forced outage of generators, are newly defined in order to properly address the characteristic of the planned maintenance outage in changed electricity markets. First, initial market demand is classified into multiple demand clusters, which are defined by the effective outage rates of generators and by the inherent characteristic of the initial demand. Then, based on the advanced demand clustering algorithm, the planned maintenance outages and corresponding effective outages of generators are reevaluated. Finally, the conventional demand clusters are newly classified in order to reflect the improved effective outages of generation markets. We have found that the revision of the demand clusters can change the number of the initial demand clusters, which cannot be captured in the conventional demand clustering process. Therefore, it can be seen that electricity market situations, which can also be classified into several groups which show similar patterns, can be more accurately clustered. From this the fundamental characteristics of power systems can be more efficiently analyzed, for this advanced classification can be widely applicable to other technical problems in power systems such as generation scheduling, power flow analysis, price forecasts, and so on.

ANALYSIS ON THE EVALUATION OF PROJECT EFFICIENCY BASED ON BUDGET EXECUTION: PLANNED OUTAGE MAINTENANCE (POM) FOR ELECTRICITY POWER PLANT

  • Sungkon Moon;Sangwon Han;Myoungwon Kang
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.66-73
    • /
    • 2011
  • With rapid industrialization, electric power consumption has been increasing every year in Korea and in other countries. The provision of additional power stations to produce more electricity is one possible response to this steady increase in consumption. Another alternative is to improve the efficiency of existing stations through timely and effective maintenance works. Since the construction of a new power plant involves a large amount of capital as well as difficulties in the selection of sites, the improvement of existing power stations' efficiencies is often a preferred solution. Therefore, this paper focuses on maintenance project management to address this issue. Among several types of maintenance works, this paper concentrates on planned outage maintenance (POM). This focus arises from the critical impact of POM on other maintenance work, as well as the entire process of electricity production. Unlike other maintenance work, POM is done on the basis of mid and long-term plans. In addition, only POM works are conducted during the outage of all power plants. To evaluate the efficiency of POM works, budget data relating to 164 POM projects between 2001 and 2008 was collected from 7 sites in South Korea. Data envelopment analysis (DEA) was selected as a methodology for evaluation. From this analysis, comparative study was used to determine the categories of projects that had performed well, and those with the most optimized budget structures. Moreover, through discussion with industry, this research develops a feasible proposed method by which to enhance the efficiency of POM projects.