• Title/Summary/Keyword: Planing 모델링

Search Result 11, Processing Time 0.031 seconds

Studies on Planing Avoidance Control for a Ventilated Supercavitating Vehicle (분사형 초공동 수중운동체의 Planing 회피에 대한 연구)

  • Park, Jongyeol;Kim, Seonhong;Kim, Nakwan
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.53 no.3
    • /
    • pp.201-209
    • /
    • 2016
  • Supercavitation is a technology that reduces frictional resistance of an underwater vehicle by surrounding it with bubbles. Supercavity is divided into natural supercavity and ventilated supercavity which is formed by artificially supplying gas. Planing forces are present when a section of the underwater vehicle goes outside of the cavitation region in the supercavity condition. Planing often leads to an unstable flight because it acts vertically on the body suddenly. In this paper, a relationship between the ventilation rate and the cavitation number is determined. Based on the relationship, desired cavitation number which can avoid to planing is determined and then ventilation controller is designed. The performance of the ventilation controller is verified with a depth change controller using the cavitator. Simulation results show that the ventilation controller can minimize the planing force and moment.

Modeling and Simulation of the 6 DOF Motion of a High Speed Planing Hull Running in Calm Sea (정수중을 활주하는 고속선의 6자유도 운동 모델링 및 시뮬레이션)

  • Yoon, Hyeon Kyu;Kang, Namseon
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.53 no.1
    • /
    • pp.10-17
    • /
    • 2016
  • When a planing hull straightly runs and turns, its floating position and pitch angle are changed depending on its speed, and large transient motion happens. In this paper, six degrees of freedom(6 DOF) equations of motion, which could simulate the motion of a planing hull, are established. Static and dynamic forces in vertical plane are modeled using pre-calculated displacements and metacentric heights depending on various draft, lift under bottom, and vertical damping coefficients which are used to tune the final motion. Hydrodynamic coefficients in horizontal plane at various equilibrium state are calculated by using Lewandowski's empirical formula and the speed-dependent equilibrium state are calculated beforehand by Savitsky's formula. The speed effects are considered by curve-fitting the coefficients at various speed to the polynomials. Accelerating, decelerating and backing, turning, and zig-zag are simulated and compared with the sea trial results, and it is confirmed that the speed reduction, roll, and pitch during such maneuvers of sea trial and simulation are well consistent.

Modeling New Generation Expansion Planning Problems for Applications in Competitive Electric Power Industries (전력시장에 적용 가능한 새로운 전원개발계획문제 모델링)

  • 김진호;박종배;박준호
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.9
    • /
    • pp.521-528
    • /
    • 2004
  • The demise of the native franchise markets and the emergence of competitive markets in electricity generation service is substantially altering the way that operation and planning activity is conducted and is making it increasingly difficult for market participants such as generation firms to prospect the future electricity markets. Traditional generation expansion planning (GEP) problems which centrally determine the least-cost capacity addition plan that meets forecasted demand within pre-specified reliability criteria over a planning horizon (typically 10 to 20 years) is becoming no more valid in competitive market environments. Therefore, it requires to develop a new methodology for generation investments, which is applicable to the changed electric industry business environments and is able to address the post-privatization situation where individual generation firms seek to maximize their return on generation investments against uncertain market revenues. This paper formulates a new generation expansion planning problem and solve it in a market-oriented manner.

A Model to Decide the Approach to Build Data Warehouse considering Project′s Environmental Factors (프로젝트 환경요인을 고려한 Data Warehouse 구축방법의 선택모형)

  • 노규성;윤재희
    • Proceedings of the Korea Database Society Conference
    • /
    • 1999.06a
    • /
    • pp.403-413
    • /
    • 1999
  • Today's businesses are experiencing intensive global competition and the most accelerating pace of change ever. Competitors have sprung up that were not even on the business's radar. This environment impacts all decisions and strategies as business try to dominate their market or their industry merely to survive. So recently most of organizations are considering on building the data warehouse system to pursuit the business intelligence. We need the proper model to guide the approach to plan building data warehouse system when we want to plan it in considering the organizational status. Therefore we suggest a model to decide the approach to build data warehouse considering the project's environmental factors. First we review Ronald S. Swift(1998)'s five environmental factors that we have to consider when planing to build data warehouse. Then we propose a model to decide DW approach by the degree of those factors to be measured. DW approaches in this model are classified in conservative approach, technological approach, increasing approach. enterprise- wide approach, and ideal approach.

  • PDF

A Model to Decide the Approach to Build Data Warehouse considering Project's Environmental Factors (프로젝트 환경요인을 고려한 Data Warehouse 구축방법의 선택 모형)

  • 노규성;윤재희
    • Proceedings of the Korea Inteligent Information System Society Conference
    • /
    • 1999.03a
    • /
    • pp.403-413
    • /
    • 1999
  • Today's businesses are experiencing intensive global competition and the most accelerating pace of change ever. Competitors have sprung up that were not even on the business's radar. This environment impacts all decisions and strategies as business try to dominate their market or their marker or their industry merely to survive. So recently most of organizations are considering on building the data warehouse system to pursuit the business intelligence. We need the proper model to guide the approach to plan building data warehouse system when we want to plan it in considering the organizational status. Therefore we suggest a model to decide the approach to build data warehouse considering the project's environmental factors. First we review Ronald S. Swift(1998)'s five environmental factors that we have to consider when planing to build data warehouse. Then we propose a model to decide DW approach by the degree of those factors to be measured. DW approaches in this model are classified in conservative approach, increasing approach, enterprise wide approach, and ideal approach.

  • PDF

A Study on the Application of Modeling and Simulation for Planing Military Operations (군사 작전계획을 위한 모델링 시뮬레이션 활용 방안 연구)

  • Jung, Wan-Hee
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.41 no.1
    • /
    • pp.79-85
    • /
    • 2015
  • Modeling and simulation has widely been used in the weapon systems acquisition, the military training, and the warfighting experimentation. A study of the warfighting experimentation had been relatively scarce in comparison to other fields (acquisition, training). The main reasons are 1) reliability of simulation model isn't sufficient and 2) collaboration between professional groups is too difficult. To solve this problem, the application framework of warfighting experimentation for military operations was proposed. And through the framework, the case study about sea fight was fulfilled. This framework provides connectivity between warfighting experimentation and military operations planning procedure. With improved reliability, active application of warfighting experimentation could contribute to fighting capability.

Evaluating a Positioning Accuracy of Roadside Facilities DB Constructed from Mobile Mapping System Point Cloud (Mobile Mapping System Point Cloud를 활용한 도로주변 시설물 DB 구축 및 위치 정확도 평가)

  • KIM, Jae-Hak;LEE, Hong-Sool;ROH, Su-Lae;LEE, Dong-Ha
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.22 no.3
    • /
    • pp.99-106
    • /
    • 2019
  • Technology that cannot be excluded from 4th industry is self-driving sector. The self-driving sector can be seen as a key set of technologies in the fourth industry, especially in the DB sector is getting more and more popular as a business. The DB, which was previously produced and managed in two dimensions, is now evolving into three dimensions. Among the data obtained by Mobile Mapping System () to produce the HD MAP necessary for self-driving, Point Cloud, which is LiDAR data, is used as a DB because it contains accurate location information. However, at present, it is not widely used as a base data for 3D modeling in addition to HD MAP production. In this study, MMS Point Cloud was used to extract facilities around the road and to overlay the location to expand the usability of Point Cloud. Building utility poles and communication poles DB from Point Cloud and comparing road name address base and location, it is believed that the accuracy of the location of the facility DB extracted from Point Cloud is also higher than the basic road name address of the road, It is necessary to study the expansion of the facility field sufficiently.

A study on the integrated data modeling for the plant design management system and the plant design system using relational database (관계형 데이터베이스를 이용한 PDMS/PDS의 통합 데이터 모델링에 관한 연구)

  • 양영태;김재균
    • Journal of Ocean Engineering and Technology
    • /
    • v.11 no.3
    • /
    • pp.200-211
    • /
    • 1997
  • Most recently, offshore Engineering & Construction field is concerned about integration management technology such as CIM(Computer Integrated Manufacturing), PDM(Product Data Management) and Enterprise Information Engineering in order to cope with the rapid change of engineering and manufacturer specification as per owner's requirement during construction stage of the project. System integration and integrated data modeling with relational database in integration management technology improve the quality of product and reduce the period of the construction project by reason of owing design information jointly. This paper represents the design methodology of system integration using Business Process Reengineering by the case study. The case study is about the offshore plant material information process from front end engineering design to detail engineering for the construction and the basis of monitoring system by integrating and sharing the design information between the 2D intelligent P&ID and 3D plant modeling using relational database. As a result of the integrated data modeling and system integration, it is possible to maintain the consistency of design process in point of view of the material balancing and reduce the design assumption/duration. Near future, this system will be expanded and connected with the MRP(Material Requirement Planing) and the POR (Purchase Order Requisition) system.

  • PDF

Development of a Work Information Model and a Work Path Simulator for an Intelligent Excavation (지능형 굴삭을 위한 작업정보모델 및 작업경로 시뮬레이터 개발)

  • Kim, Sung-Keun;Min, Sung-Gyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.3D
    • /
    • pp.259-267
    • /
    • 2012
  • The development of construction automation systems is proposed as a potent solution to the difficulties encountered by the construction industry and the preparation for the rapidly changing construction environment. A research concerning an intelligent excavation system has taken place since 2006. The intelligent excavation system has several functions for environment sensing, 3D site modeling, work planning, work path generation, unmaned control, and information management. This paper presents a space information model and a work path simulator for work planning and work path generation which is one of key technologies required to apply the earthwork system to the real world. A data structure for an earthwork site is suggested. It overcomes the limitations of previous data structures such as Quadtree and Octree. The work path simulator can generate an effective work path with considering information on work environment, equipment and operator's heuristic. The work path generated by the simulator is compared with that suggested by human operators.

Seismic Analysis Process of Steel Box girder Bridge based on BIM (강상자형 교량의 BIM기반 내진해석 프로세스)

  • Lee, Heon-Min;Lee, Jin-Kyoung;Yoo, Jae-Myoung;Shin, Hyun-Mock
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.24 no.4
    • /
    • pp.421-428
    • /
    • 2011
  • The communication of each others is lack between planing, design, construction and maintenance in domestic construction industry. This problem makes the omission of information and the loss of cost. So, the introduction of BIM can be the solution about that. BIM manages all information generated during all life-cycle of a structure and consequently maximizes the efficiency of utilizing information. This is done through 3D information model associated with a three-dimensional(3D) parametric CAD. This study proposes the seismic analysis process of steel box bridge for structural design of bridge construction project based on BIM. The additional process is needed for the purpose that structural data is inherent in the property information of 3D information model. This process has 3D modeling progress done by using the information decided in design phase. The design document of seismic analysis can be derived with the proposed process to steel box bridge.