This study has an objective to estimate effect on water-quality enhancement by removal of contaminated river-bed material using a two-dimensional numerical modeling in the Seonakdong River, the Pyunggang River and the Maekdo River. RMA2 and RMA4 models were used for flow and contaminant transport simulation, respectively. After the analysis of the effects of flow restoration plan for the Seonakdong River system made by Lee et al (2008), simulation have been performed about scenarios which contains operations of the Daejeo Gate, the Noksan Gate, the Makdo Gate (on planning), and the Noksan Pumping Station. Because there is no option for elution from bed sediment in the RMA4 model, a simple technique has been used for initial condition modification for elution. The analyses revealed that the effect on water quality improvement due to dredging of bed sediment seemed to be less than 10 % of the total effect. The most efficient measure for the water quality improvement of the river system was the linked operation of water-gates and pumping station.
Journal of the Society of Naval Architects of Korea
/
v.46
no.1
/
pp.69-77
/
2009
Loss of human lives and properties including environmental damage due to large scale accidents requires change of our perception to marine safety. IMO is trying to re-establish overall marine safety system through long term plan such as GBS. Along this line, current regulation based safety evaluation is in process of changing into performance based methods, and for this transition, simulation based safety evaluation during design stage considering damage is highly necessary. In this paper, first, damage scenario is developed from IMO regulations and accident case studies. Then an integrated and simulation based safety evaluation prototype system considering both damage stability and structural safety is developed for the use during ship design process.
This paper mainly deals with the dynamic walking of a biped robot. At first, in order to walk in various environments, it is desirable to adapt to such ground conditions with a suitable foot motion, and maintain the stability of the robot by a smooth hip motion. A method to plan a walking pattern consisting of a foot trajectory and a hip trajectory is presented. The effectiveness of the proposed method is illustrated by simulation results. Secondly, the paper brings forward a balance control technique based on off-line walking pattern with real-time modification. At last, the concept of Zero Moment Point (ZMP) is used to evaluate dynamic stability.
In Korea, diabetes mellitus, which causes micro and macrovascular complications, has been rapidly increasing during recent decades and has become a leading cause of disability-adjusted life years. The prevalence of diabetes mellitus was 12.4% in 2011 and that of prediabetes, a condition of high risk for developing diabetes mellitus, is 1.5- to 3-fold greater than that of diabetes. The diabetes prevention programs in other countries were shown to reduce or delay progression from prediabetes to diabetes mellitus. However, these results are not applicable to Korean people because of genetic and environmental differences. Therefore, we need to plan and perform a diabetes prevention study in Korean. Based on these results, we should design intervention tools for a Korean diabetes prevention program. We can consider several preventive interventions with lifestyle modification suitable for Korean people and pharmacologic treatments such as metformin or alpha-glucosidase inhibitor.
Lim, Kyeong Jin;Kim, Tae Woan;Jang, Yo Jong;Yang, Jin Ho;Lee, Seong Hyeon;Yeom, Du Seok;Kim, Seon Yeong
The Journal of Korean Society for Radiation Therapy
/
v.31
no.2
/
pp.51-63
/
2019
Purpose: Radiation therapy for breast cancer should consider the change in breast shape due to breathing and swelling. In this study, we evaluate the benefit of using virtual bolus for IMRT of left breast cancer. Materials and methods: 10 patients with early breast cancer who received radiation therapy after breastconserving surgery compared the VMAT and IMRT plans using the virtual bolus method and without using it. The first analysis compared the V95%, HI, CI of treatment volume, Dmean, V5, V20, V30 of ipsilateral lung, and Dmean of heart in VMAT plan made using the virtual bolus method(VMAT_VB) to the plan without using it(VMAT_NoVB) in case there is no change in the breast. In IMRT, the same method was used. The second analysis compared TCP and NTCP based on each treatment plan in case there is 1cm expansion of treatment volume. Result: If there is no change in breast, V95% in VB Plan(VMAT_VB, IMRT_VB) and NoVB Plan(VMAT_NoVB, IMRT_NoVB) is all over 99% on each treatment plan. V95% in VMAT_NoVB and VMAT_VB is 99.80±0.17% and 99.75±0.12%, V95% in IMRT_NoVB and IMRT_VB is 99.67±0.26% and 99.51±0.15%. Difference of HI, CI is within 3%. OAR dose in VB plan is a little high than NoVB plan, and did not exceed guidelines. If there is 1cm change in breast, VMAT_NoVB and IMRT_NoVB are less effective for treatment. But VMAT_VB and IMRT_VB continue similar treatment effect compared in case no variation of breast. Conclusion: This study confirms the benefit of using a virtual bolus during VMAT and IMRT to compensate potential breast shape modification.
Journal of the Korean Society of Clothing and Textiles
/
v.38
no.1
/
pp.19-32
/
2014
The Taekwondo uniform has remained consistent since it was officially designed in a V-neck form in 1976. Taekwondo is a martial art that emphasizes social etiquette; therefore, it is necessary to dress in a uniform that reflects Korean traditions and ancient oriental philosophy. However, the current official uniform has limitations in endowing traditionality and many usability problems. Thus, recognizing the problems raised with the uniform, the Kukkiwon (World Taekwondo Headquarters) developed a new style official uniform in 2011. This study is to endow traditional meaning to a new style uniform and proposes some design modifications that can convey a more traditional adequacy. The development of the new official uniform began with a specific plan for change from the existing uniform, this study as subsequent work is significant in that its endowment of symbolism and modification proposal is for the actual execution and global dissemination of traditional Taekwondo culture. The results of this study are as follows. First, we can endow Korea's traditional historicity and symbolism to the new uniform in form and colors. All contents of the design (in which the front side is open, the top is adjusted rightward, the rear length is shorter than the front length, comfort provided by side vents, dual collars for children's uniforms, and a belt) are adapted from the Korean traditional costume. Consequently, historicity can be endowed to the uniform. It is also confirmed that the traditional oriental philosophy including heaven and earth (天地), Yin-Yang (陰陽), and Five Elements (五行) can be endowed in the use of colors. Second, in order to project deeper historicity and symbolism to the form of the new uniform, this study proposes design modifications based on the selection as an item of Simui (深衣), a type of traditional clothing that contains a high symbolism similar to the Taekwondo uniform. It proposes giving shape to the practice of manners, the righteous life, and the straightforward mind by modifying the design of the uniform in the fish belly part of the sleeves, collars, back stitches, and side seams.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.435-439
/
2006
The purposes of study is to propose a new method contract price adjustment in construction projects. The research method of this study includes a case analysis and questionnaire survey. The results of this study are as follows: 1) For improvement method of contract amount adjustment, enactment for legislation pertaining to computation methods such as military's organization through total unit cost, and price flexibility computation at the point of design modification were presented. 2) Arithmetic formulas for cases in which volume is deleted or modified below the price flexibility exemption amount or in which there is no change to quantity, at the occurrence of design modification resulting from price flexibility, were proposed.
Journal of the Korean Institute of Landscape Architecture
/
v.35
no.5
/
pp.16-28
/
2007
In this study, the implications for landscape architecture in the restoration Project of Cheonggyecheon will be shown through the analysis of factors for landscape architect scheme modification. The method of study consists of theoretical study, analysis of the plan and design of landscape architecture of the restoration project of Cheonggyecheon, and deduction of implications thereof. The controversial feints included the many difficulties in realizing the productive design of landscape architecture due to the selective collecting of public opinion and the problems of settling the complications, the design limit of the turnkey and MA systems, the lack of hydraulic knowledge and technology and the shortage of vegetation monitoring data and experimental materials. The alternative proposals are as follows: 1) there should be agreement between the government organization and the civil group, 2) in the turnkey bidding for the river restoration projects, the river restoration design based on the volume divided into some parts should be reconsidered in order to maintain consistency in the total design, 3) in order to maintain consistency in the planning policies, MA designs should also be introduced and applied from the first stage of the project through its completion, and 4) data such as the safe water level in case of flooding for the facilities and the vegetation and data in connection with the ecological restoration of river should be accumulated. If these controversies are not settled effectively, the river restoration project will be delayed due to complications with the citizens and wasted time and effort will result from the frequent design changes. In addition, landscape architecture in this kind of restoration project is bound to decrease in the future due to frequent changes in the hydraulic-centered design.
Journal of The Korean Association For Science Education
/
v.38
no.3
/
pp.319-329
/
2018
Research Projects allow students to experience of scientific research by conducting experiments on specific scientific subjects and writing reports. The process of research begins as students find and propose research questions and its importance has been consistently emphasized. In this study, we developed various strategies to support students to draw research questions and applied to each phase. We analyzed how students' research questions were developed at different phases. The program consists of five phases, such as (1) Exploration, (2) Literature Review and Data Collection, (3) Modification and Extension, (4) Sharing and Evaluation, (5) Final Selection and Research Plan. The program was applied to high school Research Project for 12 hours. A total of 13 students were divided into four groups of 3-4 students and conducted researches. The results of each student's research process and final research plans were then collected and analyzed. The overall quality of research questions produced by the students showed improvement in each phase. Each strategy improved in various aspects of the research questions at each level. Students were able to find their own area of interest in the 'Exploration' phase and then they began to suggest verifiable plans in the 'Literature and Data Collection' phase. They were able to find a variety of variables under the 'Modification and Extension' phase, whereas the precision of research questions improved in the 'Sharing and Evaluation' and the 'Final Selection and Research Plan' phase.
Korean Journal of Construction Engineering and Management
/
v.17
no.4
/
pp.3-11
/
2016
Recently, overseas plant orders of domestic enterprises are steadily increased, and the amount of orders in the first half of 2014 were 93% increased compared to the previous year. In addition, now which is the third quarter of 2015, overseas plant orders are already over 249.8 billion dollars so the interests of plant industry research has been increased. In the life cycle of the plant project, CM before the construction stage is to complement the uncertainties that are inherent in the early stages of the project, and from the viewpoint of supporting the rational decision-making, the importance of its role is on the rise. Among them, excavating and investing participation plan in the planning stage is an important work that has a large impact force to influence the success and failure of future project. However, the work has become a problem with frequent consultations due to decision-making, continuous modification, and inefficient repetitive tasks. Therefore, it is needed that work process should be changed to effectively accommodate. The purpose of this paper is to derive the major work items for excavating and investing participation plan in the planning stage of the plant project, and establish a standardized work process through the Delphi analysis. The result of this study is expected to be utilized for EPC companies in ensuring the technical competitiveness in planning on overseas markets, and improve the efficiency of work.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.