• Title/Summary/Keyword: Place Pressure

Search Result 440, Processing Time 0.026 seconds

Incipient Fault Detection of Reactive Ion Etching Process

  • Hong, Sang-Jeen;Park, Jae-Hyun;Han, Seung-Soo
    • Transactions on Electrical and Electronic Materials
    • /
    • v.6 no.6
    • /
    • pp.262-271
    • /
    • 2005
  • In order to achieve timely and accurate fault detection of plasma etching process, neural network based time series modeling has been applied to reactive ion etching (RIE) using two different in-situ plasma-monitoring sensors called optical emission spectroscopy (OES) and residual gas analyzer (RGA). Four different subsystems of RIE (such as RF power, chamber pressure, and two gas flows) were considered as potential sources of fault, and multiple degrees of faults were tested. OES and RGA data were simultaneously collected while the etching of benzocyclobutene (BCB) in a $SF_6/O_2$ plasma was taking place. To simulate established TSNNs as incipient fault detectors, each TSNN was trained to learn the parameters at t, t+T, ... , and t+4T. This prediction scheme could effectively compensate run-time-delay (RTD) caused by data preprocessing and computation. Satisfying results are presented in this paper, and it turned out that OES is more sensitive to RF power and RGA is to chamber pressure and gas flows. Therefore, the combination of these two sensors is recommended for better fault detection, and they show a potential to the applications of not only incipient fault detection but also incipient real-time diagnosis.

Rainfall induced instability of mechanically stabilized earth embankments

  • Roy, Debasis;Chiranjeevi, K.;Singh, Raghvendra;Baidya, Dilip K.
    • Geomechanics and Engineering
    • /
    • v.1 no.3
    • /
    • pp.193-204
    • /
    • 2009
  • A 10.4-m high highway embankment retained behind mechanically stabilized earth (MSE) walls is under construction in the northeastern part of the Indian state of Bihar. The structure is constructed with compacted, micaceous, grey, silty sand, reinforced with polyester (PET) geogrids, and faced with reinforced cement concrete fascia panels. The connections between the fascia panels and the geogrids failed on several occasions during the monsoon seasons of 2007 and 2008 following episodes of heavy rainfall, when the embankment was still under construction. However, during these incidents the MSE embankment itself remained by and large stable and the collateral damages were minimal. The observational data during these incidents presented an opportunity to develop and calibrate a simple procedure for estimating rainfall induced pore water pressure development within MSE embankments constructed with backfill materials that do not allow unimpeded seepage. A simple analytical finite element model was developed for the purpose. The modeling results were found to agree with the observational and meteorological records from the site. These results also indicated that the threshold rainwater infiltration flux needed for the development of pore water pressure within an MSE embankment is a monotonically increasing function of the hydraulic conductivity of backfill. Specifically for the MSE embankment upon which this study is based, the analytical results indicated that the instabilities could have been avoided by having in place a chimney drain immediately behind the fascia panels.

The package loading equipment development cutting both ends in the process of packaging lumber for improving the working environments (노동강도 제거 및 양끝정렬 균일화를 위한 양끝절단포장적재시스템 개발)

  • Kang, Ji-Ho
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2008.04a
    • /
    • pp.135-147
    • /
    • 2008
  • The package loading process of the lumbering industry is an operation that after a pair of workers bind three or six lumbers into one unit and cut both ends of the lumbers, transports the weight cargo of 30-50kg by one meter, pack and load at a height of 1.2 meters. This package loading process causes lots of noise and wood dust when workers carry out the heavy work as the above. Therefore we developed the monolithic both ends cutting package loading equipment in order to prevent from getting musculoskeletal disease. An loading bar working system of this equipment is improved from pneumatic pressure system to oil pressure system, furnished the newly designed flow dividers, and developed the new system that a both end array is loaded identically. Also we developed the safety equipment of loading bar in order to prevent workers mistake and overload from malfunction during the package loading process. The main cause of job evasion on working place could be solved by preventing the musculoskeletal disease and improving the working environments.

  • PDF

Cooling Cycle for Energy Saving (에너지 절약용 냉방사이클)

  • Lee, Hung Joo;Kim, Yong Ku
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.1 no.2
    • /
    • pp.116-127
    • /
    • 1989
  • Research on reheating cooling cycle and its practical application have been made to prevent unequalized distribution of temperature and humidity of room due to lack of supply air volume and dewdrops on supply diffusers to be taken place as a result of lower temperature of supply air than that of dew point of room air in cooling cycle of constant air volume, single duct, single zone and draw-through fan type. In view of the fact that human body is insensitive to humidity, it is possible not only to construct the complete non-reheating cooling cycle by increasing the humidity point allowable with the deduction of occupant's sense of pleasantness minimizing, but also to get cooling cycle decreasing the reheating quantity if the humidity exceeds the point allowable. In addition, it is possible to save maximum 8% in electric energy for cooling in cooling system by constructing non-reheating cooling cycle instead of reheating cooling cycle and by increasing the relative humidity of room from 50% to 65% in case efficiency and air pressure of cooling system are low. It is also possible to get an optimum cooling cycle by determining the room humidity in consideration of pleasantness of occupants and conservation rate of electric energy if the cooling capacity, efficiency and total pressure of cooling equipment are fixed.

  • PDF

Numerical Analysis of Borehole Stability Depending on Drilling Fluid (Drilling Fluid를 적용한 시추공의 안정성에 대한 수치해석)

  • Sin, Chun-won;Yoo, Chung-Sik
    • Journal of the Korean Geosynthetics Society
    • /
    • v.16 no.2
    • /
    • pp.183-194
    • /
    • 2017
  • When a borehole is drilled, the load distributed by the removal is taken to re-establish equilibrium. As a result, the stresses around the borehole is redistributed. If there is no hydrostatic support pressure by drilling fluid (mud) introduced into the borehole, failure in the formation may take place. The mud pressure boundary that keeps the borehole stable is defined as a mud window. To predict the potential for failures around the borehole, a series of numerical analysis were performed and compared with a mud window. The effect of failure criterion and the intial stress ratio adopted on the mud window was also studied.

A Design for Natural Gas Reforming Reactor (천연가스 개질기 설계)

  • Lee, Taeckhong;Choi, Woonsun
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.23 no.5
    • /
    • pp.545-550
    • /
    • 2012
  • This work is for the design study of natural gas reformer (40 $m^3/hr$ over). We used experimental kinetic data from literature. After that, we set up theoretical model based on experimental reaction kinetic data. The shape of reactor is 1.7 m long and 200 mm dia. with cylinder geometry. Volume of reactor is 53.4 liter. Average flow velocity of gases in the reactor has been determined 0.272 m/sec and residence time is 9.26 sec. Reaction temperature is $850^{\circ}C$, with pressure 9.3 Bar. Used natural gas volume is about 9.21 $m^3/hr$. Produced hydrogen is 43.7 $m^3/hr$ with no change of pressure. Unreacted natural gas is 0.09 $m^3/hr$ and the amount of steam is 26.9 $m^3/hr$. Steam to $CH_4$ (s/c ratio) is 2.91. Reforming reaction take place from the reactor entrance to 120 cm region of cylinder type reactor. After the entrance of reacting gases to 120 cm region, the reaction reaches equilibrium which is close to products. This study can be applicable to design various reactors. Output data is in good agreements with the data in literatures1).

The Performance and Emission of the Intake Port Injection Type Hydrogen Fueled Engine (흡기관 분사 방식 수소 연료 기관의 성능 및 배출물에 관한 연구)

  • 이형승;이석재;이종화;유재석;김응서
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.1 no.2
    • /
    • pp.27-33
    • /
    • 1993
  • Using the solenoid driven gas injection valve, Hydrogen fuel supply system was made. It was attached to a single cylinder research engine and intake port injection type hydrogen fueled S.I. engine was constructed. Engine performance, emission characteristics, and abnormal combustion were studied through the engine test performed with the variations of fuel-air equivalence ratio and spark timing. Compared with gasoline, hydrogen burns so fast that cylinder peak pressure and temperature are higher and NO is emitted more at full load condition. IN the case of intake port injection type engine, COVimep becomes lower due to the well-mixing of air and fuel, and engine output is lower owing to the low volumetric efficiency. As fuel-air equivalence ratio goes up, the combustion speed increases, and COVimep decreases. NO emission peaks slightly lean of stoichiometric. As spark timing advances and fuel-air equivalence ratio goes up, the cylinder peak pressure and temperature become higher, so abnormal combustions take place easily.

  • PDF

Star formation in nuclear rings controlled by bar-driven gas inflow

  • Moon, Sanghyuk;Kim, Woong-Tae;Kim, Chang-Goo;Ostriker, Eve C.
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.46 no.1
    • /
    • pp.51.2-51.2
    • /
    • 2021
  • Nuclear rings are sites of intense star formation at the center of barred spiral galaxies. A straightforward but unanswered question is what controls star formation rate (SFR) in nuclear rings. To understand how the ring SFR is related to mass inflow rate, gas content, and background gravitational field, we run a series of semi-global hydrodynamic simulations of nuclear rings, adopting the TIGRESS framework to handle radiative heating and cooling as well as star formation and supernova feedback. We find: 1) when the mass inflow rate is constant, star formation proceeds in a remarkably steady fashion, without showing any burst-quench behavior suggested in the literature; 2) the steady state SFR has a simple linear relationship with the inflow rate rather than the ring gas mass; 3) the midplane pressure balances the weight of the overlying gas and the SFR surface density is linearly correlated with the midplane pressure, consistent with the self-regulated star formation theory. We suggest that the ring SFR is controlled by the mass inflow rate in the first place, while the gas mass adjusts to the resulting feedback in the course of achieving the vertical dynamical equilibrium.

  • PDF

Determination of Optimal Pressure Monitoring Locations for Water Distribution Systems using Entropy Theory (엔트로피 이론을 이용한 상수관망의 최적 압력 계측 위치 결정)

  • Chung, Gun-Hui;Chang, Dong-Eil;Yoo, Do-Guen;Jun, Hwan-Don;Kim, Joong-Hoon
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.7
    • /
    • pp.537-546
    • /
    • 2009
  • Determination of optimal pressure monitoring location is essential to manage water distribution system efficiently and safely. In this study, entropy theory is applied to overcome defects of previous researches about determining the optimal sensor location. The previous studies required the calibration using historical data, therefore, it was difficult to apply the proposed method in the place where the enough data were not available. Also, most researches have focused on the locations to minimize cost and maximize accuracy of the model, which is not appropriate for the purpose of maintenance of the water distribution system. The proposed method in this study quantify the entropy which is defined as the amount of information calculated from the pressure change due to the variation of discharge. When abnormal condition is occurred in a node, the effect on the entire network is presented by the entropy, and the emitter is used to reproduce actual pressure change pattern in EPANET. The optimal location to install pressure sensors in water distribution system is the nodes having the maximum information from other nodes. The looped and branched networks are evaluated using the proposed model. As a result, entropy theory provides general guideline to select the locations to install pressure sensors and the results can be used to help decision makers.

Experimental Study on the Precast Concrete Joint using Re-bar Debonding and Cutting Technique (철근 비부착 및 절단 기법을 사용한 PC 접합부의 실험적 연구)

  • Yi, Waon-Ho;Moon, Jung-Ho;Lee, Yong-Jae;Lee, Han-Jun
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.2 no.4 s.7
    • /
    • pp.131-141
    • /
    • 2002
  • Precast concrete (PC) panels are often used as retaining walls to support soil pressure. In such a case, the panels should be connected at the location where PC panels meet with a buttress. However, it is not easy to provide enough development length for the reinforcing steels due to the limited width of the buttress. If it happens, the width of buttress should be increased as large enough although it is not desirable. The critical section required for providing the development length is always located where the flexural moment is maximum. Thus it is the place the buttress width ends. Also it is the place that the reinforcing steels stressed to maximum. However, it is possible to make differentiate between the maximum moment location and the most stressed location of reinforcing steels. It means that the most stressed location of reinforcing steels, the critical section, can be moved to the other place where the moment is not maximum. New critical location will have less moment than that of buttress width ends. In consequence, the development length would be longer than that of the typical way of construction. Debonding or cutting technique make it possible to reduce the moment strength of a section. Therefore reinforcing steels are debonded or cut to have a desired flexural strength at a desired place. In this study, five test specimens in full scale were erected to examine the effects of critical section movement in PC panel joints. Test parameters were the length variations of debonded and cut reinforcing steels. The test results showed that the debonding or cutting technique could be used to lengthen the development length in the joint of PC panels.