• Title/Summary/Keyword: Piping closure rate

Search Result 2, Processing Time 0.022 seconds

Study on a Multi-pipe Water Hammer Phenomenon by using CFD of Rapid Valve Closing (전산유체해석(CFD)을 이용한 밸브의 급폐쇄에 따른 다중 배관 수격 현상에 관한 연구)

  • Park, No-Suk;Kim, Seong-Su;Kang, Moon-Sun;Choi, Jong-Woong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.27 no.4
    • /
    • pp.479-487
    • /
    • 2013
  • This study was to investigate characteristics for the pressure wave propagation and the maximum pressure near a rapid closure valve which was installed the end of multi piping network. The multi piping network consists of one inlet and three outlet with straight pipes. The diameter of the pipes including the valve was 100 mm, 80 mm, 80 mm respectively. The valve was rapidly closed with the instantaneous time which was 0.023s in the level for the water hammer. For the simulation, the influence of the pipe thickness and deformation due to pressure-wave-propagation was not considered. CFD was conducted under the following condition : the initial pressure was 1bar in the inlet and the mass flow rate was 7.83 kg/s in the outlet(the velocity in the pipe with 100 mm diameter was 1 m/s). As the valve have conditions that were status with and without fluid flow in the pipe after valve closing, the maximum pressure change and the frequency analysis were examined. As the results, the case that was status with fluid flow appeared the higher maximum pressure than another's, the maximum frequency band was about 10 ~ 11 Hz.

A Study on the Steam Hammering Characteristics by Sudden Closure of Main Stop Valve in the Main Steam Piping System of a Power Plant (화력발전소 주증기배관에서 밸브 차단에 따른 수증기 충격 특성에 관한 연구)

  • Ha, Ji-Soo;Lee, Boo-Youn
    • Journal of the Korean Institute of Gas
    • /
    • v.17 no.2
    • /
    • pp.70-77
    • /
    • 2013
  • The present study has been carried out to analyze the effect of steam hammering on the steam piping system including the final superheater, the high pressure turbine, check valve and the first reheater by sudden stoping of main stop valve in a power plant. For the present steam hammering analysis, the well known Flowmaster software has been used to model the steam piping system and the time dependent characteristics of pressure and steam mass flow rate has been conducted. Using the result of the unsteady pressure and steam mass flow rate, the forces acting on the elbows in the piping system has been derived. From the present analysis, it has been elucidated that the elbow just before the main stop valve and the elbow near the connection pipe between bypass pipe and check valve had the largest force among the elbows in the steam piping system. The structural safety diagnostics study on the elbow and the supporting structures of the steam piping system of a power plant will be conducted in the future by the present results of the forces acting on the elbow.