• Title/Summary/Keyword: Pipe Deterioration Evaluation

Search Result 18, Processing Time 0.021 seconds

Aging Deterioration for Electric Power Transmission Tower on Offshore Through Periodic Inspections (해상송전철탑 구조물의 주기점검을 통한 경년열화 변화특성)

  • Lee, Ho Beom;Jang, Il Young
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.16 no.4
    • /
    • pp.25-33
    • /
    • 2012
  • In electric power transmission tower structures on offshore, implementation of life management using the event data of regular safety inspections for structural and material damages is strongly recommended. In this study, six tower structures in Sihwa Lake around Yeoungheung island were target bodies for the safety inspections. safety inspections for deterioration about each of six towers were performed about three items for steel member, five items for concrete foundation, and four items for steel-pipe pile in seawater and seawater itself. Safety inspections for steel members included the visual observations of surface appearances, the measurements of member thicknesses, and the checks of painting states. Also safety inspections for concrete foundations comprised the estimation of crack features, the evaluation of non-destructive compression strengths, and the measurements of neutralization depths and chlorides contents. For steel-pipe piles in seawater the inspections comprised the surveys of corrosion states in accordance with potential levels tests and anode tests, the analyses of photos taken on surfaces of the piles as well as the evaluation of seawater quality. A set of deterioration inspections was performed at the same positions around october of each year for three consecutive years. As a result in this study, Newly developed deterioration indexes have been applied profitably to maintain structural safety for electric power transmission towers by utilizing these event data systematically.

A Decision-Supporting Model for Rehabilitation of Old Water Distribution Systems

  • Kim, Joong-Hoon;Geem, Zong-Woo;Lee, Hyun-dong;Kim, Seong-Han
    • Korean Journal of Hydrosciences
    • /
    • v.8
    • /
    • pp.31-40
    • /
    • 1997
  • Flow carrying capacity of water distribution systems is getting reduced by deterioration of pipes in the systems. The objective of this paper is to present a managerial decision-making model for the rehabilitation of water distribution systems with a mininum cost. The decisions made by the model also satisfy the requirements for discharge and pressure at demanding nodes in the systems. Replacement cost, pipe break repair cost, and pumping cost are considered in the economic evaluation of the decision along with the break rate and the interest rate to determine the optimal replacement time for each pipe. Then, the hydraulic integrity of the water distribution system is checked for the decision by a pipe network simulator, KYPIPE, if discharge and pressure requirements are satisfied. In case the system does not satisfy the hydraulic requirements, the decision made for the optimal replacement time is revised until the requirments are satisfied. The model is well applied to an existing water distribution system, the Seoul Metropolitan Water Supply System (1st Phase). The results show that the decisions for the replacement time determined by the economic analysis are accepted as optimal and hydraulic integrity of the system is in good condition.

  • PDF

Development of Rehabilitation and Management Techniques for Old Water Distribution Systems (기존 상수도 노후관망의 개량 및 관리 기법의 개발)

  • 김중훈;김종우
    • Water for future
    • /
    • v.29 no.3
    • /
    • pp.197-205
    • /
    • 1996
  • Flow carrying capacity of water distribution systems is getting reduced by deterioration of pipes in the systems. The objective of this study is to develop a managerial decision-making model for the rehabilitation of water distribution systems with a minimum cost. The decisions made by the model also satisfy the requirements for the discharge and pressure at demanding nodes in the system. The replacement cost, pipe break repair cost, and pumping cost are considered in the economic evaluation of the decision along with the break ratio and interest ratio to determine the optimal replacement time for each pipe. Then, the hydraulic integrity of the water distribution system is checked for the decision by a pipe network simulator, KYPIPE, if the discharge and pressure requirements, the decision made for the optimal replacement time is revised until the requirements are satisfied. The model is applied to an existing water distribution system, the Metropolita Water Supply Project (1st Phase). The result shows that the decisions for the replacement time determined by the economix analysis are accepted as optimal and the hydraulic integrity of the system is in good condition.

  • PDF

Experimental Study on the Adhesion and Performance Evaluation of Joints for Modified Polyethylene Coated Steel Pipes (개질 폴리에틸렌 코팅 강관의 부착 및 체결부 성능 평가 연구)

  • Myung Kue Lee;Sanghwan Cho;Min Ook Kim
    • Composites Research
    • /
    • v.37 no.3
    • /
    • pp.238-245
    • /
    • 2024
  • In this study, as part of the development of a monitoring system for the efficient maintenance of steel pipes, an experimental study was conducted to evaluate the performance of steel pipes treated with modified polyethylene coating. In the case of the conventional mechanical pre-coating method, there was a deterioration in polyethylene adhesion during expansion testing, which led to the application of a chemical pre-treatment process using a calcium-mixed phosphate zinc film to resolve this issue. SEM and EDX analyses showed that the densest structure was observed at a Zn/Ca ratio of 1.0, and improved heat resistance compared to the conventional method was confirmed. Additionally, to prevent coating detachment during expansion, an evaluation of adhesion and elongation was conducted on steel pipes with modified polyethylene coating, incorporating materials such as elastomers based on maleic anhydride grafting, metal oxides, blocking agents, and slip agents. Experimental results showed that the specimen (S4) containing all modified materials exhibited more than a 25% performance improvement compared to the specimen (S2) containing only metal oxides. Lastly, the development and performance evaluation of wedge-shaped socketing and pressing wheels, which are part of the pipe fixing accessories, were conducted to prevent surface coating damage on the completed pipes.

A Study on Risk Evaluation Method of Ground Subsidence around Sewer (하수관로 주변 도로함몰 위험도 평가 방법에 관한 연구)

  • Kim, Jinyoung;Choi, Changho
    • Journal of the Korean GEO-environmental Society
    • /
    • v.19 no.7
    • /
    • pp.13-18
    • /
    • 2018
  • Recently, road subsidence has been increasing in urban areas, threatening the safety of citizens. In the lower part of the road, various road facilities such as water supply and drainage pipelines and telecommunication facilities are buried, and the deterioration of the facilities causes the road subsidence. In particular, in the case of old sewer pipes which are attracting attention as a main cause of road subsidence, the management of sewer pipe replacement, repair and reinforcement is being performed depending on the burial year. Therefore, in this study, we tried to suggest a reliable road subsidence risk assessment method considering various sewer specifications and surrounding environment information and CCTV exploration result and GPR exploration result.

A Case Study on Failure and Analysis of Air Over Hydraulic Brake Line (공기 유압식 브레이크 라인 파손 사례 및 파손 분석 연구)

  • Park, Jeongman;Park, Jongjin
    • Journal of Auto-vehicle Safety Association
    • /
    • v.12 no.2
    • /
    • pp.47-55
    • /
    • 2020
  • In this case study, the brake line failure of air over hydraulic(AOH) brake system is described. AOH brake system is applied to commercial vehicles between 5 to 8 tons. It consists of a hydraulic system using compressed air and operates the air master to form hydraulic pressure to transfer braking power to the wheels. When the brake lines of the system applied to vehicles with high load capacity are damaged, the braking force of one shaft is lost, and the braking distance increases rapidly, leading to a big accident. Failure of the brake line occurs due to various causes such as road surface fragmentation, corrosion of the line, and aged deterioration of air brake hose. The braking force could be decreased even when a very small break in the form of a pin-hole occurs. However, it is difficult to find a part where the thickness of the line is thin due to stone pecking or corrosion generated in the pin-hole formed on the brake line located under the lower part of the vehicle by the sensory evaluation or the conventional braking force test. Accordingly, it is necessary to analyze the condition and cause of the failure of the brake line more precisely when the accident investigation of the heavy vehicles, and also to examine the necessity of the advanced test for the aged brake line.

Evaluation of Residual Strength and Behavior of Reinforced STG 800 Welded Square Composite Column after Fire 3 Hour (강관철근을 보강한 합성기둥의 3시간 가열 후 잔존 압축력 실험평가)

  • Kim, Sun-Hee;Yom, Kyong-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.242-243
    • /
    • 2021
  • The concrete inside the steel tube of CFT columns enables them to have great strength and ductility. CFT columns are also excellent in fire-resistance because explosive heat upon a fire can be contained in the tube by the concrete debris. However, the studies to evaluate the residual strength of CFT columns after a fire have not been conducted enough. The studies to evaluate the residual strength of CFT columns after a fire are indispensable because it is the barometer of the damage of composite columns caused by a fire and the degree of repair and reinforcement work for the columns after a fire. Accordingly, the purpose of this study is to evaluate the deterioration of load capacity and structural behavior of square CFT columns with the same shapes and boundary conditions before and after a fire. The study also evaluates the influential factors of the CFT columns reinforced to secure the residual strength after a fire.

  • PDF

Performance Evaluation of Concrete Bench Flume Using Industrial by Products (산업부산물을 이용한 콘크리트 벤치플룸의 성능평가)

  • Jae-Ho Jung
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.11 no.3
    • /
    • pp.276-281
    • /
    • 2023
  • Water pipes manufactured using existing Portland cement suffer from the problem of rapid deterioration and reduced durability due to the hydration product of cement being vulnerable to acids. Therefore, in this study, water pipes were manufactured using slag and fly ash, which are industrial by-products from various industries, and their characteristics were analyzed. As a result of the experiment, slump in unhardened concrete tended to increase due to the ball bearing action of fly ash, and the amount of air was reduced due to unburned coal, indicating that measures for frost resistance were needed. In addition, the initial strength of the compressive strength was increased through steam curing, and the results were equal to or better than OPC when mixing more than 50 % of slag. The acid resistance results showed that the mass reduction rate was less than 5 %, showing excellent durability performance, and the bending failure load of the water pipe also exceeded the KS standards, so it is judged to be commercializable.