• Title/Summary/Keyword: Pillar Section

Search Result 56, Processing Time 0.022 seconds

Investigation of divergence tunnel excavation according to horizontal offsets between tunnels

  • Hong, Soon-Kyo;Oh, Dong-Wook;Kong, Suk-Min;Lee, Yong-Joo
    • Geomechanics and Engineering
    • /
    • v.21 no.2
    • /
    • pp.111-122
    • /
    • 2020
  • In most cases in urban areas, construction of divergence tunnel should take into account proximity to existing tunnel in operation. This inevitably leads to deformation of adjacent structures and surrounding ground. Preceding researches mainly dealt with reinforcing of the diverging section for the stability including the pillar. This has limitations in investigating the interactive effects between existing structures and surrounding ground due to the excavation of the divergence tunnel. In this study, the complex interactive behavior of pile, the operating tunnel, and the surrounding ground according to horizontal offsets between the two adjacent tunnels was quantitatively analyzed based on conditions diverged from operating tunnel in urban areas. The effects on ground structures confirmed by analyzing the ground surface settlements, pile settlements, and the axial forces of the pile. The axial forces of lining in operating tunnel investigated to estimate their impact on existing tunnel. In addition, in order to identify the deformation of the surrounding ground, the close range photogrammetry applied to the laboratory model test for confirming the underground displacements. Two-dimensional finite element numerical analysis was also performed and compared with the results. It identified that the impact of excavating a divergence tunnel decreased as the horizontal offset increased. In particular, when the horizontal offset was larger than 1.0D (D is the diameter of operating tunnel), the impact on existing structures further reduced and the deformation of surrounding ground was concentrated at the top of the divergence tunnel.

A Study on the Applicability of Unmanned Aerial Vehicles for Underwater Cultural Heritage Survey in Intertidal Zones (조간대에서의 수중문화재 조사를 위한 무인항공기의 적용 가능성에 관한 연구)

  • Young-Hyun Lee;Dong-Won Choi;Sang-Hee Lee;Sung-Bo Kim
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.26 no.4_2
    • /
    • pp.697-703
    • /
    • 2023
  • Intertidal zones, akin to tidal flats, are among the potential areas where underwater cultural heritage might be submerged. However, the shallow depths in these regions present challenges for conventional vessel-based survey methods. Moreover, during low tides, intertidal zones transform into tidal flats, limiting the efficiency of survey efforts due to restricted access and potential risks. As a result, proper underwater cultural heritage surveys encounter difficulties in these environments. In recent times, extensive research is underway to address these issues by investigating underwater cultural heritage surveys in intertidal zones, encompassing diverse fields, including equipment-based investigations. This study aimed to explore the feasibility of utilizing unmanned aerial vehicles (UAVs) to conduct intertidal cultural heritage surveys, employing aerial photography and 3D mapping to create detailed orthoimages and 3D models. The study focused on assessing the potential application of these techniques for cultural heritage surveying within intertidal zones. Notably, the survey conducted in Jindo's Naesan-ri demonstrated high-resolution capabilities, enabling the distinction of actual pottery fragments mixed within gravel fields. Similarly, in the survey of Jindo's Byeokpa-hang, it was found that a wooden pillar structure existed in a section about 200m long. The integration of various sensors, including LiDAR, with UAVs allows for diverse investigation possibilities, including bathymetric measurements, and is expected to facilitate the acquisition of varied datasets for further research and assessment.

Numerical investigation on 3D behavior of 2-Arch tunnel (2-Arch 터널의 3차원 거동 특성 - 수치해석 연구)

  • Yoo, Chung-Sik;Kim, Joo-Mi;Kim, Hee-Chul
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.3
    • /
    • pp.255-264
    • /
    • 2009
  • This paper concerns the behavior of 2-Arch tunnel constructed under various conditions. A 2-Arch tunnel section adopted in a subway tunnel construction site is considered in this study. A calibrated 3D finite element model was adopted to conduct parametric studies on a variety of construction scenarios including lagged distance between left and right tunnels, overburden, and geological condition. The results of analyses were examined in terms of crown settlement, shotcrete lining stress, and load on center column in relation to the lagged distance, cover depth, and the ground condition. The results indicate that the shotcrete lining stress and the center pillar load are more influenced by the second tunnel excavation than the tunnel deformation. Also shown is that a greater lagged distance is required to minimize the interaction between two tunnels when the ground condition becomes weaker. Fundamental mechanisms of 2-arch tunnel were also discussed based on the results.

Seismic Behavior and Economic efficiency Analysis of Bridge for PSC I-Shaped Girder of isolated device (지진격리장치를 갖는 PSC I형 거더교량의 지진거동 특성 및 경제성 분석)

  • Shin, Yung-Seok;Park, Jang-Ho;Choi, Kwang-Soo;Hong, Soon-Ho
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.21 no.2
    • /
    • pp.145-151
    • /
    • 2008
  • The research so far has primarily analyzed efficiency improvement but in this research, it analyzes the characteristics of earthquake behavior, with changed pier heights, through ordinary and seismic analysis. For this, the kind of bridge bearing has been changed against PSC I-shaped bridge, which is mostly used in practice, and at all times earthquake analysis has been performed with through height of pier. Especially considering sectional power resulting from earthquake analysis, displacement of PSC I-shaped bridge bearing, diameter of pier pillar by earthquake load, and upper spare gap have been analyzed. In case of high-pear, seismic isolated device is decided as proper for cars' driving and for management of bridge since it decreases movement of upper structure, than elastic bearing, reducing size of elastic connect device, and it's been analyzed it is effective for improvement of fine view and economic efficiency reducing section of lower bridge structure. Finally, when design PSC I-shaped bridge bearing, for the proper structure and high-pier side, applying seismic isolated device through precise inner analysis is proper than applying equal elastic bearing.

Numerical Analysis on Effect of Stemming Condition in Mine Ventilation Shaft Blasting (광산 통기수갱발파에서 전색조건이 발파효율에 미치는 영향에 관한 수치해석적 연구)

  • Kim, Jun-ha;Kim, Jung-gyu;Jung, Seung-won;Ko, Young-hun;Baluch, Khaqan;Kim, Jong-gwan
    • Explosives and Blasting
    • /
    • v.39 no.3
    • /
    • pp.15-23
    • /
    • 2021
  • Ventilation shafts are pathways in mines and tunnels for the removal of dust or smoke during underground space construction and operation. In mines, blasting with long blast holes is preferred for the excavation of a ventilation shaft in the 10~20m long crown pillar section. In this case, the bottom part of the blast hole is completely drilled in order to determine the drilling error, and this causes a problem of lowering the explosive charge and blasting efficiency. It is possible to solve the problem of explosive loading and to increase the blast efficiency by covering the curb of the blasthole by using stemming material. In this study, simulations for the blasting of a ventilation shaft were performed with various stemming lengths and the blasthole diameters(45, 76mm) using AUTODYN 2D SPH(Smooth particle hydrodynamics) analysis technique. Also the optimal bottom stemming column was derived by checking the size of the boulder and burden line according to blasting. Analysis result, blasting efficiency is lessened in case of stemming length less than 30cm and the optimal length of the stemming material should be 30cm or higher to achieve high efficiency of blasting.

Evaluation of Traffic Vibration Effect for Utilization of Abandoned Mine Openings (휴·폐광산 채굴 공동 활용을 위한 교통 진동 영향 평가)

  • Hyeon-Woo Lee;Seung-Joong Lee;Sung-Oong Choi
    • Tunnel and Underground Space
    • /
    • v.33 no.2
    • /
    • pp.95-107
    • /
    • 2023
  • In this study, the effect of repeated traffic vibration on the long-term stability of mine openings is analyzed for re-utilization of abandoned mine galleries. The research mine in this study is an underground limestone mine which is developed by room-and-pillar mining method, and a dynamic numerical analysis is performed assuming that the research mine will be utilized as a logistics warehouse. The actual traffic vibration generated by the mining vehicles is measured directly, and its waveform is used as input data for dynamic numerical analysis, As a results of dynamic numerical analysis, after 20,000 repetitions of traffic vibration, the mine openings is analyzed to be stable, but an increase in the maximum principal stress and an additional area of plastic zone are observed in the analysis section. As shown in the changes of displacement, volumetric strain, and maximum principal stress which are measured at the mine opening walls. It is confirmed that if the repeated traffic vibration is continuously applied, the instability of the mine openings can be increased. Authors expect that the results of this study can be used as a reference for basic study on utilization of abandoned mine.