• Title/Summary/Keyword: Piled abutment

Search Result 12, Processing Time 0.025 seconds

Behavior of Piled Abutment adjacent to Surcharge Loads (측방유동을 받는 교대말뚝기초에 대한 거동분석)

  • 정상섬;서정주;장범수
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.11a
    • /
    • pp.25-32
    • /
    • 2000
  • In order to analyze the behavior of piled abutment adjacent to surcharge loads a numerical study was conducted. In 2D plane stalin analysis, the distribution of lateral soil movement was investigated by varying the thickness of clay layer and the magnitude of surcharge loads. In 3D analysis, the magnitude and distribution of lateral pile-soil movement were studied for different cap rigidity. Based on limited parametric studies, a simple method is proposed to identify the lateral pressure of piled abutment adjacent to surcharge loads.

  • PDF

Design Guidelines of Piled Bridge Abutment subjected to Lateral Soil Movements (교대말뚝기초의 측방이동 판정기준 분석)

  • 정상섬;이진형;서동희;김유석;장범수
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.03a
    • /
    • pp.381-388
    • /
    • 2002
  • A series of centrifuge model tests were performed to investigate the behavior of piled bridge abutment subjected to lateral soil movements induced by the construction of approach embankment. In these tests, both the depth of soft clay and the rate of embankment construction are chosen as key parameters to examine the effects on lateral soil movements. The depth of soft clay layer varies from 5.2 m to 11.6 m, and the rate of embankment construction has two types of staged construction(1m/30days, 1m/15days) and instant construction. It is shown that, the distribution of lateral flow induced by stage embankment construction has a trapezoidal distribution. And practical guidelines to check the possibility of some lateral movement of piled abutment were investigated. The validity of the proposed guidelines by centrifuge test was compared with the observed performance by lateral movement index, F(Japan Highway Public Corporation) and modified I index(Korea Highway Corporation). Based on the results obtained, the critical values of F and modified I, as a practical guidelines, are proposed to 0.03 and 2.0, respectively.

  • PDF

Evaluation of Stability about Lateral Soil Movement of Bridge Abutment Constructed on Soft Ground (연약지반 위에 시공되는 교대의 측방유동에 대한 안정성 평가)

  • Yoo, Nam-Jae;Kim, Dong-Gun;Jeon, Sang-Hyun
    • Journal of Industrial Technology
    • /
    • v.30 no.B
    • /
    • pp.25-32
    • /
    • 2010
  • In this paper stability about lateral soil movement of bridge abutment constructed on the soft ground, reinforced with the sand compaction pile (SCP) and the preconsolidaton methods, was evaluated by using the centrifuge testing facility which stress conditions in field could be reconstructed in the laboratory. The layouts of model such as ground condition, sand compaction piles and abutment was determined on the basis of similitude law with the reduced scale of 1/200. Construction sequences of installing SCP, preparing reclaimed ground, preconsolidating ground and building the piled bridge abutment were reconstructed during centrifuge modelling and measurements of movement were followed in each sequence. From analyzing the results of measuring movements of the model abutment and the ground, measured lateral movement of model abutment was found to be within the allowable value so that stability of abutment against lateral sliding was secured.

  • PDF

Centrifuge Model Experiments for Lateral Soil Movements of Piled Bridge Abutments. (교대말뚝기초의 측방유동에 관한 원심모형실험)

  • Choi, Dong-Hyurk;Jeong, Gil-Soo;Park, Byung-Soo;Yoo, Nam-Jae
    • Journal of Industrial Technology
    • /
    • v.25 no.B
    • /
    • pp.63-71
    • /
    • 2005
  • This paper is an experimental result of investigating lateral soil movements at piled bridge abutments by using the centrifuge model facility. Three different centrifuge model experiments, changing the methods of ground improvement at bridge abutment on the soft clayey soil (no improvement, preconsolidation and plastic board drains (PBD), sand compaction pile (SCP) + PBD), were carried out to figure out which method is the most appropriate for resisting against the lateral soil movements. In the centrifuge modelling, construction process in field was reconstructed as close as possible. Displacements of abutment model, ground movement, vertical earth pressure, cone resistance after soil improvement and distribution of water content were monitored during and after centrifuge model tests. As results of centrifuge model experiments, preconsolidation method with PBD was found to be the most effective against the lateral soil movement by analyzing results about displacements of abutment model, ground movement and cone resistance. Increase of shear strength by preconsolidation method resulted in increasing the resistance against lateral soil movement effectively although SCP could mobilize the resistance against lateral soil movement. It was also found that installment with PBD beneath the backfill of bridge abutment induced effective drainage of excess pore water pressure during the consolidation by embanking at the back of the abutment and resulted in increasing the shear strength of clay soil foundation and eventually increasing the resistance of lateral soil movement against piles of bridge abutment.

  • PDF

Centrifuge Modelling of Bridge Abutment Foundation on the Sloped Ground (경사지반에 위치한 교대기초의 원심모델링)

  • Yoo, Nam-Jae;Jun, Sang-Hyun;Hong, Young-Kil
    • Journal of Industrial Technology
    • /
    • v.27 no.B
    • /
    • pp.209-214
    • /
    • 2007
  • This paper is the research result about centrifuge model experiments of investigating the behavior of bridge abutment on the sloped ground. Ground condition of the studied site was the bridge abutment with pile foundation adjacent to the slope. The pile foundations was supported on the soft rocks covered with the embankment. Evaluating the behavior of such a complicate ground and structure conditions was not easy so that the centrifuge modelling was performed to find the overall behavior of them. Layout of centrifuge model experiment was simplified to simulate easily the actual behavior of very complicate site condition. Construction process in field such as ground excavation for footing foundation, installation of piles, placement of footing and bridge abutment, backfilling and surcharge loading eas duplicated in the centrifuge model experiment. Consequently, the stability of the piled bridge abutment adjacent to the slope of embankment was evaluated throughout centrifuge modelling.

  • PDF

The Behavior of Piled Bridge Abutments Subjected to Lateral Soil Movements - Design Guidelines - (측방유동을 받는 교대말뚝기초의 거동분석 (II) - 측방유동 판정기준 -)

  • 이진형;서정주;정상섬;장범수
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.1
    • /
    • pp.21-29
    • /
    • 2003
  • In this study, practical guidelines to check the possibility of some lateral movement of piled abutment were investigated. In these tests, both the depth of soft clay and the rate of embankment construction are chosen to examine the effect on lateral soil movements. The depth of soft clay layer varies from 5.2 m to 11.6 m, and the rate of embankment construction has two types : staged construction(1m/30days, 1m/15days) and instant construction. Various measuring instruments such as LVDTs, strain gauges, pressure cells, and pore pressure transducers are installed in designed positions in ordo. to clarify the soil - pile interaction and the short and long term behavior f3. piled bridge abutments adjacent to surcharge loads. The validity of the proposed guidelines by centrifuge test was compared with the observed performance by lateral movement index, F(Japan Highway Public Corporation) and modified I index(Korea Highway Corporation). Based on the results obtained, the critical values off and modified I, as a practical guidelines, are proposed as 0.03 and 2.0, respectively.

Three Dimensional Analysis of Piled Abutment Adjacent to Surcharge Loads (3차원해석에 의한 교대말뚝기초의 측방유동 발생메카니즘 분석)

  • 서동희;서정주;장범수;정상섬
    • Journal of the Korean Geotechnical Society
    • /
    • v.17 no.2
    • /
    • pp.85-93
    • /
    • 2001
  • 본 논문에서는 연약지반에 시공된 교대말뚝기초에 인접하여 성토하중이 재하될 때 발생하는 측방유동의 발생메커니즘을 규명하기 위해 3차원 유한요소해석을 수행하였다. 본 수치해석에서는 점성토 지반과 점성토-사질토 지반 그리고 사질토-점성토 지반에 선단지지된 강관말뚝에 대하여 성토하중 크기(q=20, 75, 100kPa)와 말뚝두부조건(변위구송, 회전구속) 그리고 말뚝중심간격(s=2.5d, 5.0d, 7.0d, 단독말뚝)에 따라 측방유동압의 분포형태와 크기를 분석하였다. 그 결과 측방유동압의 분포형태는 교대말뚝기초의 수평변위와 유사한 형태로 나타났으며 측방유동압의 크기는 배면 성토하중의 크기에 대한 비로써 결정할 수 있었다. 그리고 점성토 지반과 점성토-사질토 지반의 경우, 측방유동압의 분포형태와 크기는 말뚝두부조건에 가장 큰 영향을 받는 반면 사질토-점성토 지반의 경우에는 말뚝두부조건보다는 토층조건에 가장 큰 영향을 받는 것으로 분석되었다. 본 연구결과를 토대로 연약지반에 시공된 교대말뚝기초의 측방유동에 대한 설계 및 해석시 지침자료로서 측방유동압의 분포형태와 크기를 추천.제안한다.

  • PDF

Analysis of Soil Bailed Wall under Piled Bridge Abutment (교대하부 도로확장에 적용된 쏘일네일 벽체의 해석)

  • Im, Yu-Jin
    • The Journal of Engineering Research
    • /
    • v.6 no.1
    • /
    • pp.83-96
    • /
    • 2004
  • A soil mailed wall is adapted as road widening measure and is constructed under a miniature abutment built on steel pipe piles. The soil nailed wall called for removal of the existing embankment slope to permanently retain the fill behind the abutment. The soil nailed wall is fully instrumented and is monitored. A 3D finite element analysis is used to study further the behavior of the soil nailed wall. The complete sequence of construction is simulated. The numerical model is calibrated against the instrumented nailed wall. Then a parametric study is conducted. The results provide valuable information related to the effect of the excavation and nailing on the following: axial load and bending moment in the piles, load in the nails, and wall deflections.

  • PDF

A Study on the Behavior of Piled Abutment Subjected to Lateral Soil Movement of Soft Ground Improved by Deep Cement Mixing Method (DCM 공법으로 개량된 연약지반의 측방유동을 받는 교대 말뚝기초의 거동 분석에 관한 연구)

  • Choi, Yeonho;Kang, Gyeongho
    • The Journal of Engineering Geology
    • /
    • v.30 no.2
    • /
    • pp.131-145
    • /
    • 2020
  • The construction on these flimsy ground, activation of unsymmetrical surcharges, can often cause of the embankment road lateral flow or the destruction of the activities. In this study, the stability of the abutment pile foundation installed on soft ground and its behavior has been evaluated. The behavior of the abutment pile foundation under lateral flow was studied by verifying the behavior and reinforcement effects of the abutment pile foundation of previous studies about horizontal loads acting on the pile due to the lateral flow of the ground by performing finite element analysis. As a result of the consolidation analyses, the undrained cohesion or the strength of the soft ground, was increased by about 1.1 to 1.8 times by the increase in the strength of the soft ground according to the degree of consolidation. It is deemed reasonable to use 3.8 cm of the allowable displacement both economically and constructively, but considering the importance of the structure and the uncertainty of the ground, measurement shall be carried out during construction and thorough safety management of the lateral flow should be done.