• Title/Summary/Keyword: Phosphorus removal process

Search Result 281, Processing Time 0.029 seconds

Factors affecting Phosphorus removal in BNR process applied Moving Bed Biofilm (유동상 생물막법을 적용한 BNR공법에서의 인제거 영향인자)

  • Park, Woon-Ji;Kim, Dong-Oog;Lee, Chan-Ki
    • Journal of Industrial Technology
    • /
    • v.26 no.B
    • /
    • pp.3-10
    • /
    • 2006
  • In this study, the of MBBR(moving bed biofilm reactor) process for Phosphorus Removal efficiency depending on seasons and the factors affecting phosphorus removal efficiency in the process is evaluated. As a result of experiment, T-P removal efficiency has its highest value in winter, (80.8%). and T-P removal efficiency has its lowest value in autumn, (49%). Optimum SRT for Phosphorus Removal revealed is about 8.8 days and process performs more efficiently as the temperature decreases. It is accepted that nitrate to anaerobic zone is affecting the Phosphorus removal process. With increasing the organic loading rate, Phosphorus removal efficiency also increases. Also, an experiment has been conducted to find out the highest efficiency according to Media existence and it has revealed that Media addition provides better phosphate removal.

  • PDF

The Nitrogen and Phosphorus Removal of UNR Process Using Sludge Carbon Source (슬러지 탄소원을 주입한 UNR공정의 동절기 질소, 인 처리효율)

  • Kim Young Gyu;Kim In Bae
    • Journal of Environmental Health Sciences
    • /
    • v.28 no.1
    • /
    • pp.93-97
    • /
    • 2002
  • The aim of this study was to evaluate on the removal effect of total nitrogen and phosphorus with municipal wastewater in ultrasonic nutrient removal (UNR) process using ultrasonic sludge carbon source. The removal efficiency for total nitrogen was 44.2% at biological nutrient removal (BNR) process, 50.8% at UNR process. The removal efficiency for total phosphorus was 45.6% at BNR process, 46.2% at UNR process. The removal of nitrogen was effectively influenced by ultrasonic sludge carbon source.

A Study on Nitrogen and Phosphorus Removal in FNR Process (FNR process를 이용한 하수처리장의 질소.인의 제거에 관한 연구)

  • Cho Il-Hyoung;Lee Nae-Hyun;Lee Seung-Mok;Kim Young-Kyu
    • Journal of Environmental Science International
    • /
    • v.15 no.6
    • /
    • pp.571-577
    • /
    • 2006
  • This study make a comparison between the phosphorus removal performance of FNR(Ferrous Nutrient Removal) process and A/O process by the laboratory experiments. For simultaneous removal of phosphorus, iron electrolysis was combined with oxic tank. Iron precipitation reactor on the electrochemical behaviors of phosphorus in the iron bed. The phosphorus removal in FNR process was more than A/O process. Iron salts produced by iron electrolysis might help to remove COD and nitrogen. And the demanded longer SRT is the more removes the removes COD, nitrogen, and phosphorus. Also, FNR process of sludge quantity more reduce than A/O process to input cohesive agents.

The Nitrogen and Phosphorus Removal of MUNR Process Using Sludge Carbon Source (초음파처리 슬러지 탄소원을 첨가한 침지헝 분리막공법의 질소, 인 처리에 관한 연구)

  • 김영규;황성희
    • Journal of Environmental Health Sciences
    • /
    • v.28 no.5
    • /
    • pp.1-3
    • /
    • 2002
  • This study was to evaluate on the removal efficiencies of total nitrogen and phosphorus in municipal wastewater at MUNR process using sludge carbon source for environmental micro-organism. The removal efficiencies of total suspended solid were 85.9~91%, total nitrogen were 38.6~87.2% and total phosphorus were 30.8~39.0%, respectively. It was shown that removal efficiency of nitrogen was effectively influenced by sludge carbon source treated with ultrasonication. The removal efficiency of total phosphorus was low because the sludge was not wasted during this treatment.

A Study on Phosphorus Removal Effects Per Iron Surface Area in FNR Process (철전기분해장치(FNR)에서 철판의 표면적이 인제거에 미친 영향에 관한 연구)

  • Kim, Young-Gyu
    • Journal of Environmental Health Sciences
    • /
    • v.38 no.6
    • /
    • pp.568-574
    • /
    • 2012
  • Objectives: The purpose of this experiment is to understand the phosphorus removal ratio effects of iron plates per unit of surface area through the iron electrolysis system, which consists of an anoxic basin, aerobic basin, and iron precipitation apparatus. Methods: Iron electrolysis, which uses an iron precipitation reactor in anoxic and oxic basins, consisted of iron plates with total areas of 400 $cm^2$, 300 $cm^2$ and 200 $cm^2$ respectively. The FNR process was operated with a hydraulic retention time and a sludge retention time of 12 hours and three days, respectively. Wastewater used in the experiments was prepared by dissolving $KH_2PO_4$ in influent water. Results: The iron plates 400 $cm^2$ (16.6 $mA/cm^2$), 300 $cm^2$ (13.3 $mA/cm^2$) and 200 $cm^2$ (7.3 $mA/cm^2$) in surface area in the phosphorus reactor had respective phosphorus of 2.4 mg/l, 2.7 mg/l and 3.2 mg/l in the effluent and phosphorus removal respective efficiencies of 90.3%, 89.1% and 87.1%. The effluent in the reactor, where the iron plate was not used, had relatively very low phosphorus removal efficiency showing phosphorus concentration of 15.3 mg/l and a phosphorus removal efficiency about 38.3%. Phosphorus removal per ferrous was 0.472 mgP/mgFe in the iron electrolysis system where the surface area of iron was low. Phosphorus pollution load per active surface area and the phosphorus removal efficiency had an interrelation of RE = -0.27LS + 89.0 (r = 0.85). Conclusion: With larger iron plate surface area, the elution of iron concentration and phosphorus removal efficiency was higher. The removal efficiency of phosphorus has decreased by increasing the initial phosphate concentration in the iron electrodes. This shows a tendency of decreasing phosphorus removal efficiency because of decreasing of iron deposition as the phosphorus pollution load per active surface area increases.

Phosphorus and Nitrogen Removal from Synthetic Wastewater by Intermittently Activated Sludge combined with Aluminium Corrosion (알루미늄부식을 조합한 간헐폭기법에 의한 합성폐수 중의 인 및 질소 제거)

  • 정경훈;정오진;최형일
    • Journal of Environmental Health Sciences
    • /
    • v.27 no.3
    • /
    • pp.99-106
    • /
    • 2001
  • A laboratory experiment was performed to investigate phosphorus and nitrogen removal from synthetic wastewater by intermittently activated sludge process packed with aluminium plate. Three continuous experimental systems, I. e. an intermittently activated sludge process(Run A), an intermittently activated sludge process with an aluminium plate packed into the reactor(Run B), and a reactor post stage(Run C) were compared. In the batch experiments, the phosphorus removal time in the reactor packed with copper and aluminium plate simultaneously was faster than that of the reactor packed with only an aluminium plates. However, the reactor packed with only an aluminium plate could be used for phosphorus removal. Move phosphorus was removed with an increase of surface area of aluminium plate and electrolysis(NaCl) concentration. The efficiency of COD and nitrogen removal was not affected in Run B. However, the phosphrus removal efficiency decreased because of reaction products and activated sludge which gradually covered gradually the surface of the aluminium plate. The efficiency of phosphorus removal in Run C was 86.3% at the HRT of 3.2 hours. Especially, the efficiency of phosphorus removal in Run C was higher than that in Run B.

  • PDF

Treatment Efficiency and Organic Matter Characterization of Wastewater through Activated Sludge Process and Advanced Wastewater Treatment Process (활성슬러지공정과 고도처리공정에 따른 하수처리수의 처리효율과 유기물 특성)

  • Hong, JiHea;Sohn, Jinsik
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.18 no.6
    • /
    • pp.807-813
    • /
    • 2004
  • Wastewater was treated by two different treatment processes; activated sludge process and advanced wastewater treatment process (KNR process) using lab-scale experiment. Two treated wastewater showed good treatment efficiency of organic matter removal, up to 90% removal. Nitrogen and phosphorus were not effectively removed though activated sludge process, while KNR process showed good removal efficiency of nitrogen and phosphorus; 56% nitrogen removal and 95% phosphorus removal. KNR process showed better removal efficiency of organic matter, nitrogen, and phosphorus compared to activated sludge process. Organic matter characterization was tracked though measurement of UV scan, SUVA, and XAD fractionation. Treated wastewater showed higher SUVA value than wastewater influent, indicting less aromatic characteristic of organic matter. XAD fractionation showed hydrophilic fraction decreased though wastewater treatment, suggesting microbes preferentially digest hydrophilic and aliphatic molecules rather than hydrophobic and aromatic molecules of organic matter.

Enbancement of Treatement Efficiency in a Biological Nutrient Removal Process by addition of Volatile Fatty Acids (휘발성 지방산의 주입을 통한 생물학적 영양염류 제거공정의 효율증진에 관한 연구)

  • Choung, Yoon Kyoo;Ko, Kwang Baik;Kim, Sue Jin;Yim, Seong Keun
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.10 no.3
    • /
    • pp.73-82
    • /
    • 1996
  • The removal efficiencies of organic substrates, nitrogen and phosphorus in the anaerobic-aerobic biological phosphorus removal process were investigated by addition of acetic acid, propionic acid and butyric acid which are normal volatile fatty acids contained in anaerobic digester supernatants. Substrate utilization coefficients for the phosphorus release and uptake were also estimated. The effect of a VFA, which showed higher phosphorus removal efficiency than the other VFAs did, was also studied in an anaerobic-aerobic-anoxic biological nutrient removal process. For the anaerobic-aerobic process added by VFA, the phosphorus removal efficiencies were up to about 68%, 55% and 61% for the reactors of acetic acid, propionic acid and butyric acid added, respectively, which indicates the efficiencies were increased by about 8-21%, comparing to that of 47% for the reactor with no VFA added. There were no significant difference in removal efficiencies for organic substrate and $NH_3-N$ without regard to addition of VFA. However, the removal efficiency of total nitrogen was increased in the case of VFA added, since $NO_3-N$ was less produced. For the anaerobic-aerobic-anoxic process added VFA, the removal efficiencies for $NH_3-N$ and $PO{_4}^{3-}-P$ were increased by 5% and 13%, respectively, comparing with them in the reactors not added VFA.

  • PDF

Phosphorus Removal in Pilot Plant Using Biofilm Filter Process from Farm Wastewater

  • Shin, Sung-Euy;Choi, Du-Bok;Lee, Choon-Boem;Cha, Wol-Suk
    • Biotechnology and Bioprocess Engineering:BBE
    • /
    • v.11 no.4
    • /
    • pp.325-331
    • /
    • 2006
  • Various environmental conditions affecting total phosphorus removal from farm wastewater in a biofilm filter process were investigated using loess balls and Chromobacterium LEE-38 at a pilot plant. When Chromobacterium LEE-38 was used, the removal efficiency of total phosphorous was approximately 10- or 5-fold higher than that of Acinetobacter CHA-2-14 or Acinetobacter CHA-4-5, respectively. When a loess ball of $11{\sim}14mm$ manufactured at a $960^{\circ}C$ calcining temperature was used, the removal efficiency of total phosphorous was 90.0%. When 70% of the volume fraction was used, the maximum efficiency of total phosphorus removal was 93.1%. Notably, when the initial pH was in the range of 6.0 to 8.0, the maximum removal efficiency of total phosphorus was obtained after 30 days. When the operating temperature was in the range of 30 to $55^{\circ}C$, the maximum removal efficiencies of total phosphorus, 95.6 to 94.6%, were obtained. On the other hand, at operating temperatures below $20^{\circ}C$ or above $40^{\circ}C$, the removal efficiency of total phosphorous decreased. Among the various processes, biofilm filter process A gave the highest removal efficiency of 96.4%. Pilot tests of total phosphorus removal using farm wastewater from the biofilm filter process A were carried out for 60 days under optimal conditions. When Acinetobacter sp. Lee-11 was used, the average removal efficiency in the p-adsorption area was only 32.5%, and the removal efficiencies of chemical oxygen demand (COD) and biological oxygen demand (BOD) were 56.7 and 62.5%, respectively. On the other hand, when Chromobacterium LEE-38 was used, the average removal efficiency was 95.1%, and the removal efficiencies of COD and BOD were 91.3 and 93.2%, respectively.

Biological Phosphorus Removal using the Sequencing Batch Reactor Process (연속회분식반응조를 이용한 생물학적인 인 제거 연구)

  • Yang, Hyung-Jae;Shin, Eung-Bai;Chung, Yun-Chul;Choi, Hun-Geun
    • Journal of Korean Society on Water Environment
    • /
    • v.16 no.4
    • /
    • pp.533-539
    • /
    • 2000
  • A bench-scale reactor using SBR process was experimented with an synthetic wastewater. The main purpose of this investigation was to evaluate applicability in the field and process removal efficiencies in terms of BOD and T-P and its corresponding kinetic parameters. Removal rate of phosphorus was 77% in terms of total phosphorus. Effluent concentrations were $9.8mg/{\ell}$ BOD and $1.1mg/{\ell}$ T-P. Effluent quality was maintained consistently stable by controlling decant volume and operating cycles. The efficiency for phosphorus removal was increased due to decrease in BOD-SS loading value in the range of $0.25{\leq}$aeration time ratio${\leq}0.52$.

  • PDF