• Title/Summary/Keyword: Phosphorus removal

Search Result 686, Processing Time 0.025 seconds

Phosphorus Removal in Wastewater Using Activated Ca-Loess Complex

  • Kang, Seong Chul;Lee, Byoung Ho
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.26 no.5
    • /
    • pp.713-721
    • /
    • 2012
  • In many instances phosphorus is a limiting factor for eutrophication in streams, and lakes. Because wastewater treatment plant itself may be the main phosphorus source in a natural water body, removal of phosphorus in final effluent of wastewater treatment processes is required. Amongst various technologies for phosphorus removal in wastewater, adsorption technology was investigated using activated Ca-loess complex. Ca was added in loess to enhance adsorption capacity and intensity of phosphorus. Ca added loess was activated at a high temperature of $400^{\circ}C$ which turned out to be the optimum temperature. Activated Ca-loess complex below $400^{\circ}C$ had not enough strength to be applied as an activated Ca-loess pallet column in wastewater treatment process. Ca-loess complex which activated above $400^{\circ}C$ lost its adsorption capacity as the loess surface was glassified when the activation temperature reached above $400^{\circ}C$20. Even if adsorption capacity of activated Ca-loess was not very high due to the lack of abundant pores on its surface, adsorption intensity was still high because it was activated with added Ca in loess. Activated loess was made by pallets. The activated loess pallets were filled in a column, and were applied in wastewater treatment process. Using an activated Ca-loess pallet column, total phosphorus (T-P) was reduced from about 0.5 mg/l to lower than 0.1 mg/l in wastewater treatment, and ionic phosphorus (phosphate) was completely removed for the four months of pilot plant operation.

Microbial Communities of Activated Sludge Performing Enhanced Biological Phosphorus Removal in a Sequencing Batch Reactor Supplied with Glucose

  • Jeon, Che-Ok;Seung, Han-Woo;Park, Jong-Moon
    • Journal of Microbiology and Biotechnology
    • /
    • v.13 no.3
    • /
    • pp.385-393
    • /
    • 2003
  • Microbial communities were analyzed in an anaerobic/aerobic sequencing batch reactor (SBR) fed with glucose as a sole carbon source. Scanning electron microscopy (SEM) showed that tetrad or cuboidal packet bacteria dominated the microbial sludge. Quinone, slot hybridization, and 165 rRNA gene sequencing analyses showed that the Proteobacteria beta subclass and the Actinobacteria group were the main microbial species in the SBR sludge. However, according to transmission electron microscopy (TEM), the packet bacteria did not contain polyphosphate granules or glycogen inclusions, but only separate coccus-shaped bacteria contained these, suggesting that coccus-shaped bacteria accumulated polyphosphate directly and the packet bacteria played other role in the enhanced biological phosphorus removal (EBPR). Based on previous reports, the Actinobacteria group and the Proteobacteria beta subclass were very likely responsible for acid formation and polyphosphate accumulation, respectively, and their cooperation achieved the EBPR in the SBR operation which was supplied with glucose.

Removal of Nitrogen and Phosphorus by Activated Sludge Process Combined with Aluminum Corrosion (알루미늄 부식을 적용한 활성슬러지법에서 질소 및 인 제거)

  • Choi Hyung Il;Cheong Kyung Hoon;Park Sang Il;Paik Ke Jin
    • Journal of Environmental Health Sciences
    • /
    • v.31 no.2 s.83
    • /
    • pp.172-178
    • /
    • 2005
  • A laboratory experiment was performed to investigate simultaneous removal of phosphorus and nitrogen from raw sewage by intermittently aerated activated sludge process packed with aluminum and silver plate. Two continuous experimental process, i.e. an intermittently aerated activated sludge process, and an intermittently aerated activated sludge process with an aluminum and silver plate packed into the reactor were compared. The pitting corrosion of aluminum does not affect the performance of the biological treatment. The amounts of Al eluted from aluminum plate 17 mg to 60.6 mg in this experimental conditions, and Al/P mole ratio were from 3.31 to 11.25. The total nitrogen removal efficiency in Run E were $60.6\%$ at the HRT of 12 hours. The effluent $PO_4-P$ concentration as low as $1.0\;mg/\iota$ could have been obtained during the continuous experiment in Run E at HRT of 12 hours.

Phosphorus Removal from Sewage with the Corrosion of Aluminum and Silver to Pilot-Plant

  • Park, S-I;Park, H-I;Jung, O-J;Shin, D-Y;Cheong, K-H
    • Proceedings of the Korean Environmental Health Society Conference
    • /
    • 2003.06a
    • /
    • pp.98-101
    • /
    • 2003
  • The pilot scale experiment was performed to investigate phosphorus and nitrogen removal from sewage by intermittently activated sludge process combined with the electrochemical interaction (Localized Corrosion) of aluminum and silver. The average T-N removal rate for HRT of 24hr was 57.4%. It was possible to remove P in sewage to under 1 mg/L with a short HRT of 12 hr using Al and Ag plate but often required additional A1 plate supplement during the operation.

  • PDF

Case Study: Operation of the Juam Constructed Wetland for Effluent from a Sewage Treatment Plant and Diffuse Pollution for Two Years (하수종말처리장 방류수와 비점오염원 처리를 위한 주암호 인공습지 2년 운영 사례)

  • Jung, Yong-Jun
    • Journal of Korean Society on Water Environment
    • /
    • v.22 no.6
    • /
    • pp.1031-1037
    • /
    • 2006
  • In order to improve water quality of the Juam Lake, a constructed wetland was implemented and operated for 2 years with the effluent of sewage treatment plant and diffuse pollutant discharged from agricultural area. During the summer season, average removal efficiencies for BOD and SS were 15.8% and 39.4%, respectively. Due to the mixed effect of vegetation, soil microbes and sediments, the higher nutrient removal efficiencies were obtained: average T-N and T-P removal efficiencies were 64.2% and 71.7%, respectively. The concentration of sediment was increased initially, and maintained constant throughout monitoring period. The highest nitrogen and phosphorus uptake were observed in Phragmites japonica. The nitrogen uptake was estimated as 0.235 DW mg/g while phosphorus uptake was estimated as 2.059 DW mg/g.

The Operating Characteristics of SMMIAR process for Biological Nitrogen.phosphorus Removal (생물학적 질소.인 제거를 위한 SMMIAR(Submerged Moving Media Intermittent Aeration Reactor) 공정의 운전 특성)

  • 김홍태;김학석;김규창
    • Journal of Environmental Science International
    • /
    • v.12 no.1
    • /
    • pp.55-61
    • /
    • 2003
  • This study was carried out to obtain the operating characteristics of SMMIAR process for biological nitrogenㆍphosphorus removal. SMMIAR was operated at HLR(Hydraulic loading rate) of 39.6, 52.8, 63.4 and 79.2 $\ell$/$m^2$/d respectively and the operating parameters such as intermittent aeration time ratio of aerobic/anoxic, DO and microorganism concentration were changed to confirm the optimum operating condition. The concentrations of the wastewater BOD, TN(Total nitrogen) and TP(Total phosphorus) were 150, 30 and 7.5mg/$\ell$ respectively. Achieving better removal efficiencies of BOD, TN and TP up to 90, 85.4 and 95.4% respectively, we must keep in operation condition of SMMIAR by 0.75 of time ratio of aerobic/anoxic and by minimum 45 minutes of oxic period simultaneously.

Kinetics of Removing Nitrogenous and Phosphorus Compounds from Swine Waste by Growth of Microalga, Spirulina platensis

  • Kim, Min-Hoe;Chung, Woo-Taek;Lee, Mi-Kyung;Lee, Jun-Yeup;Ohh, Sang-Jip;Lee, Jin-Ha;Park, Don-Hee;Kim, Dong-Jin;Lee, Hyeon-Yong
    • Journal of Microbiology and Biotechnology
    • /
    • v.10 no.4
    • /
    • pp.455-461
    • /
    • 2000
  • Abstract Spirulina platensis was grown in SWlUe waste to reduce inorganic compowlds and simultaneously produce feed resources. Spirulina platensis prefers nitrogenous compounds in Ibe order: $NH_4^{+}-N>NO_3^{-}-N>simple-N$ such as urea and simple amino acids. It even consumes $NH_4^{+}-N$ first when urea or nitrate are present. Therefore, the content of residual $NH_4^{+}-N$ in Spimlina platensis cultures can be determined by the relative extent of the following processes: (i) algal uptake and assimilation; (ii) ammonia stripping; and (iii) decomposition of urea to NH;-N by urease-positive bacteria. The removal rates of total nitrogen ffild total phosphorus were estimated as an indicator of the treatment effIciency. It was found that Spirulina platensis was able to reduce 70-93% of $P_4^{3-}-P$, 67-93% of inorganic nitrogen, 80-90% of COD, and 37-56% of organic nitrogen in various concentrations of swine waste over 12 days of batch cultivation. The removal of inorganic compounds from swine waste was mainly used for cell growth, however, the organic nitrogen removal was not related to cell growlb. A maximum cell density of 1.52 dry-g/l was maintained with a dilution rate of 0.2l/day in continuous cultivation by adding 30% swine waste. The nitrogen and phosphorus removal rates were correlated to the dilution rates. Based on the amino acid profile, the quality of the proteins in the Spirulina platensis grown in the waste was the same as that in a clean culture.ulture.

  • PDF

Effect of TiCl4 Concentration and Mixing Intensity on Phosphorus Removal in Synthetic Wastewater (TiCl4 농도와 교반강도가 수중 인 제거에 미치는 영향)

  • Seo, Wan-Woo;Lee, Bong-Hee;Park, Hwa-Soo;Kim, Jong-Ho;Ahn, Johng-Hwa
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.38 no.3
    • /
    • pp.150-153
    • /
    • 2016
  • This study evaluates the efficacy of titanium tetrachloride ($TiCl_4$) on phosphorus (P) removal in synthetic wastewater. Jar test experiments were performed at various $TiCl_4$ concentration (0.25-0.59 mM), and intensities of slow (30-60 rpm) and rapid (100-250 rpm) mixings to determine the conditions at which P removal was most efficient. The P-removal efficiency was highest (about 99%) at $TiCl_4$ concentration $([TiCl_4])=0.39mM$ with rapid-mixing intensity=100 rpm and slow-mixing intensity=30 rpm. The slow-mixing intensity was more sensitive than the rapid-mixing intensity to the P removal efficiency when [$TiCl_4$] was low ($0.25{\leq}[TiCl_4]{\leq}0.27mM$).

Removal of Nutrients Using an Upflow Septic Tank(UST) - Aerobic Filter(AF) System (부패조와 호기성 여과공정을 이용한 영양염류 제거)

  • Park, Sang-Min;Jun, Hang-Bae; Bae, Jong-Hun;Park, Woo-Kyun;Park, Noh-Back
    • Korean Journal of Environmental Agriculture
    • /
    • v.29 no.3
    • /
    • pp.232-238
    • /
    • 2010
  • The objective of this study was to investigate a small sewage treatment system. This system was developed to improve a nitrogen and phosphorus removal efficiency and generate less solid using upflow septic tank(UST) - aerobic filter(AF) system. The UST equipped with an aerobic filter, the filter was fed with both raw sewage and recycled effluent from the UST to induce the denitrification and solid reduction simultaneously. Overall removal efficiencies of COD and total nitrogen(TN) were above 96% and 73% at recycle ratio of 200%, respectively. Critical coagulant dose without the biochemical activity was found to be 40 mg/L. Removal efficiency of total phosphorus(TP) in influent was above 90% by chemical and biological reactions. Although the phosphorus concentration was low under the high alkalinity in raw sewage, the pH value was unchanged by the coagulant dose.

Characteristics of Nutrient Removal with Variation of the Anoxic-Oxic Phase Repetition in Sequencing Batch Reactor Process (SBR공정의 무산소-호기 구간반복에 따른 영양염류 제거 특성)

  • Lee, Jaekune;Yim, Soobin
    • Journal of the Korean GEO-environmental Society
    • /
    • v.10 no.1
    • /
    • pp.43-48
    • /
    • 2009
  • This study was performed to investigate the characteristics of nutrient removal by Sequencing Batch Reactor (SBR) system, which could achieve high removal efficiencies of nitrogen and phosphorus and make it possible convenient management and operation. In this study, dissolved oxygen (DO), chemical oxygen demand (COD), nitrogen, and phosphorus in SBR system were examined by variation of anoxic-oxic phase repetition in order to optimize an operational method. The 1~4 times of anoxic-oxic phases (Run 1~4) were repeated during 1 cycle operation period. As the repetition frequency increased, it was more difficult to maintain DO condition enough for denitrification. The SBR system showed high COD removal efficiency more than 91% regardless of operational condition. About 68% of nitrogen removal rate was obtained in conditions of 2 or 3 times repetition of anoxic phases, in which NOx-N among discharged total nitrogen account for more than 99%. Approximately 40% of phosphorus was eliminated in the conditions of 1~3 times of anoxic phase repetition.

  • PDF