• Title/Summary/Keyword: Phase-shift control

Search Result 276, Processing Time 0.026 seconds

A Study on the Power Losses and Conversion Efficiency Analysis for the Phase-Shift Controlled Full-Bridge Converter (위상제어방식 풀브릿지 컨버터의 전력손실과 변환효율 분석에 관한 연구)

  • Ahn, Tae-Young;Bong, Sang-Cheol;Heo, Tae-Won
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.14 no.3
    • /
    • pp.228-234
    • /
    • 2009
  • In this paper, we present an analytical method that provides fast and efficient evaluation of the power losses and the conversion efficiency for phase-shift controlled full-bridge converter. In the proposed method, the conduction losses are evaluated by calculating the effective values of the ideal current waveform first and incorporating them into an exact equivalent circuit model of the phase-shift controlled full-bridge converter that includes all the parasitic resistances of the circuit components. While the conduction losses are accurately accounted for the synchronous rectification, the core losses are assumed to be negligible in order to simplify the analysis. The validity and accuracy of the proposed method are verified with experiments on a prototype phase-shift controlled full-bridge converter. An excellent correlation between the experiments and theories are obtained for the input voltages of 400V, output voltage 12V and maximum power 720W.

Effect of Shift Interval for the Clinical Nurse on the Circadian Rhythm (임상 간호사의 교대근무 기간이 circadian rhythm 변화에 미치는 영향)

  • 황애란;정현숙;임영신;이혜원;김조자
    • Journal of Korean Academy of Nursing
    • /
    • v.21 no.2
    • /
    • pp.129-149
    • /
    • 1991
  • Circadian rhythm is entrained in the 24-hour time interval by periodic factors in the environment, known as zeitgeber. But most rotating work schedules are outside the range of the entrainment of the pacemaker timing the human circadian sleep - wake cycle. It has been postulated that physiological and emotional disturbances occur in most human functions when the circadian rhythm is disturbed. So application of circadian principles to the design of shift schedules can aid in maintaining the temporal integrity of the circadian system and thereby minimize for the shift worker any detrimental consequences of circadian disruption. This study was a quasi-experimental study to test the effect of shift intervals for the clinical nurse on the circadian rhythm. Twenty nurses newly employed in general units of two hospitals were selected as an experimental group and twelve college nursing students as a control group. Both groups were selected according to an established criteria using a purposive sampling technique. Ten subjects were assigned to a weekly shift group and another ten to a biweekly shift group engaged in a semi -continuous shift schedule(sunday off) with a backward direction, that is, morning -evening - night shift. The control group worked a morning shift for 42 days. Oral temperature rhythm, waking tim, sleep - wake cycle, fatigue, and mental performance were measured during the experimental period. The data collection period was from April 30, 1990 to June 10, 1990. MANOVA, paired t-test, ANOVA, and Student Newman Keuls method were used for statistical analysis. The results are summarized as follows. 1. Phase delay in the acrophase of temperature rhythm was shown according to the backward rotating shift. A complete adaptation to work on the night shift was achieved between the sixth and ninth day of the night shift. 2. There was no difference in either waking time or sleep- wake cycle according to the duration of the working day for every shift group. Significant difference was found in the waking time and the sleep -wake cycle for subjects on the morning, evening, and night shift in both of the shift groups(weekly shift group : λ=0.121, p<0.01, λ=0.112, p<0.01, biweekly shift group : λ=0.116, p<0.01, λ=0.084, p<0.01). 3. There was no difference in fatigue between the first working day and the last working day for the control group and for the biweekly shift group. In the weekly shift group, physical fatigue was significantly different for the first day and the sixth day of the night shift(t=-2.28, p<0.05). Physical fatigue and total fatigue on the first day of the night shift showed a significant difference among the control group, the weekly shift group, and the biweekly shift group(F=5.79, p<0.01, F=4.56, p<0.05). There was a significant difference between the shift groups and the control group(p<0.05), Physical fatigue, neurosensory fatigue and total fatigue on the last day of the night shift showed a significant difference among the control group, the weekly shift group, and the biweekly shift group(F=12.65, p<0.01, F=7.77, p<0.01, F=9.68, p<0.01). There was a significant difference between the shift groups and the control group(p<0.05). 4. No difference in mental performance was seen between the first day and the last day of work in each case. An arithmatic test on the first day of the night shift revealed a significant difference among the control group, the weekly shift group, and the biweekly shift group(F=3.79, p<0.05). There was a significant difference between the shift groups and the control group(p<0.05) . The digital symbol substitution test and the arithmetic test on the last day of the night shift showed a significant difference among the control group, the weekly shift group, and the biweekly shift group(F=3.68, p<0.05, F=5.55, p<0.01), and both showed a significant difference between the shift groups and the control group(p<0.05). Accordingly, this study showed that during night duty, the waking time, sleep- wake cycle, and fatigue increased and mental performance decreased compared with morning and evening duty. It was also found that the weekly shift group had a higher fatigue score on the sixth day of night duty as compared to the -first day, but the waking time, sleep- wake cycle, and mental performance revealed no difference for the duration of the night duty or between shift groups, and complete adaptation of temperature rhythm was achieved between the sixth and ninth day of night duty. It is possible to conclude from these results that for intermediate circadian type in a healthy young woman, a biweekly shift system is more compatible with the circadian timing system than weekly shift system.

  • PDF

Nonlinear Control of an Automatic Transmission Using Sliding Mode (슬라이딩모드를 이용한 자동변속기의 비선형제어)

  • 조승호
    • Transactions of the Korean Society of Mechanical Engineers
    • /
    • v.19 no.3
    • /
    • pp.605-614
    • /
    • 1995
  • In the automatic transmission using planetary gear there exists nonlinearities due to the finite difference between gear ratios, which yield torque hole during shift and influence on the ride quality and life of clutch. Based on the reaction carrier and converter turbine speed sliding functions are defined. Nonlinear closed-loop control laws are derived using them. Computer simulation shows that the closed loop design is better than the open loop design and semi-closed loop design.

Power Control Method for FB-SRC IH Cooktop System Considering Limited Switching Frequency Range Condition (가용 동작 주파수 범위를 고려한 FB-SRC 기반 IH 쿡탑 시스템의 전력 제어 방안)

  • Hwang, Yun-Seong;Lee, Joo-Seung;Kang, Seung-Hyun;Kwon, Man-Jae;Jang, Eunsu;Lee, Byoung-Kuk
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.27 no.3
    • /
    • pp.256-264
    • /
    • 2022
  • The frequency power control method (FCM) which has a wide operating frequency range is adopted for induction heating (IH) cooktops. When FCM is applied to the full-bridge series resonant converter (FB-SRC) based IH system, high-frequency switching of the inverter is required compared to the half-bridge SRC (HB-SRC)-based IH system. Therefore, the switching loss of the inverter increases, and applying FCM under the condition that the inverter operating frequency range is limited is difficult. Therefore, this paper proposes a control strategy with the phase shift power control method considering that limited frequency conditions are presented. Loss analysis following the control method is performed through simulation and mathematical analysis. In addition, the validity of the proposed control strategy is verified by analyzing the heating performance following the control method through the test results of the 3,200[W] prototype.

A Study on the Loss Analysis for the Phase-Shaft Full-Bridge Converter (위상이동 방식 Full-Bridge 컨버터의 손실 분석에 관한 연구)

  • Bae, Jin-Yong;Kim, Yong;Baek, Soo-Hyun;Lee, Eun-Young;Choi, Geun-Soo
    • Proceedings of the KIEE Conference
    • /
    • 2003.04a
    • /
    • pp.157-162
    • /
    • 2003
  • This paper presents the loss analysis of Phase-Shift Full-Bridge Converter. Full-Bridge DC/DC Converter presented in this paper used a phase shift control in the primary side to achieve ZVS (Zero-Voltage-Switching) for main switch. Phase-Shaft Full-Bridge converter have an effect on the high power system. This paper analyses the loss of each component and the various losses in the circuit assessed. The result of the analysis are verified using 2.5kW, 50kHz prototype.

  • PDF

Coupled Line Phase Shifters and Its Equivalent Phase Delay Line for Compact Broadband Phased Array Antenna Applications

  • Han, Sang-Min;Kim, Young-Sik
    • Journal of electromagnetic engineering and science
    • /
    • v.3 no.1
    • /
    • pp.62-66
    • /
    • 2003
  • Novel coupled line phase shifters and its equivalent phase delay line for compact broadband phased array antennas are proposed. These phase control circuits are designed to be less complex, small size and to use a less number of active devices. The phase shifter is able to control a 120$^{\circ}$ phase shift continuously, and the phase delay line for a reference phase has a fixed 60$^{\circ}$ shifted phase. Both have the low phase error of less than $\pm$3.5$^{\circ}$ and the low gain variations of less than 1 ㏈ within the 300 MHz bandwidth. These proposed circuits are adequate to form the efficient beam-forming networks with compactness, broadband, less complexity, and low cost.

The power regulation of a High-Frequency Induction Heating System with time variance load using a neural fuzzy controller (뉴로퍼지 제어기를 이용한 고주파 유도 가열기의 시변부하에 대한 정전력 제어)

  • 장종승;김승철;임영도
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.2 no.2
    • /
    • pp.223-230
    • /
    • 1998
  • This paper describes a phase-shift pulse-width modulation and pulse-frequency modulation series resonant high-frequency inverter using IGBT(Insulated-Gated Bipolar Transistor) for the power control of high-frequency induction heating using neuro-fuzzy, which is practically applied for 20KHz~500KHz induction-heating and melting power supply in industrial fields. The adaptive frequency tracking based phase-shifting PWM(Pulse-Width Modulation) regulation scheme is presented in order to minimize switching losses. The trially-produced breadboards using IGBT are successfully demonstrated and discussed.

  • PDF

Multimode Hybrid Control Strategy of LLC Resonant Converter in Applications with Wide Input Voltage Range

  • Li, Yan;Zhang, Kun;Yang, Shuaifei
    • Journal of Power Electronics
    • /
    • v.19 no.1
    • /
    • pp.201-210
    • /
    • 2019
  • This paper proposes a multimode hybrid control strategy that can achieve zero-voltage switching of primary switches and zero-current switching of secondary rectifier diodes in a wide input voltage range for full-bridge LLC resonant converters. When the input voltage is lower than the rated voltage, the converter operates in Mode 1 through the variable-frequency control strategy. When the input voltage is higher than the rated voltage, the converter operates in Mode 2 through the VF and phase-shift control strategy until the switching frequency reaches the upper limit. Then, the converter operates in Mode 3 through the constant-frequency and phase-shift control strategy. The secondary-side diode current will operate in the discontinuous current mode in Modes 1 and 3, whereas it will operate in the boundary current mode in Mode 2. The current RMS value and conduction loss can be reduced in Mode 2. A detailed theoretical analysis of the operation principle, the voltage gain characteristics, and the realization method is presented in this paper. Finally, a 500 W prototype with 100-200 V input voltage and 40 V output voltage is built to verify the feasibility of the multimode hybrid control strategy.

Sensorless Control Method of the BLDC Motor Without Neutral Point (중성점을 사용하지 않는 BLDC 전동기 센서리스 제어 기법)

  • Sim, Kwang-Ryeol;An, Jeong-Ryeol
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.61 no.3
    • /
    • pp.111-115
    • /
    • 2012
  • Generally, brushless DC motor(BLDCM) driving system uses hall sensors or encoders as the mechanical position or speed sensor. It is necessary to achieve the informations of rotor position for driving trapezoidal type brushless DC motor without any position sensor. In this paper, the commutation signals are obtained without the motor neutral voltage, multistage analog filters, A/D converters, or the complex digital phase shift circuits which are indispensable in the conventional sensorless control algorithms. In the proposed method, in stead of detecting the zero crossing point of the nonexcited motor back electromagnetic force for the average motor terminal to neutral voltage, the commutation signal are extracted directly from the specific average line to line voltage with low-pass filter, adder and comparators circuit. In contrast to conventional methods, the neutral voltage is not need; therefore, the commutation signals are insensitive to the common mode noise. Moreover, the complex phase shift circuit can be eliminated. The effectiveness of the proposed method is verified through simulation results.

Current Reference Compensation for Fast Response in PCMC of PSFB Converter (PSFB 컨버터의 PCMC에서 빠른 응답특성을 가지기 위한 전류 명령 보상)

  • Lee, Jong-Uk;Kim, Hag-Wone;Baek, Seung-Woo;Cho, Kwan-Yuhl
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.23 no.2
    • /
    • pp.147-151
    • /
    • 2018
  • Phase-shift fullbridge (PSFB) converter detects the current in the primary side for operation of the peak current mode controller (PCMC). The PCMC must used the slope compensation to solve the problem when the effective duty is over 0.5. The voltage response of PSFB converters has slower than that of buck converter because of slew interval even if the voltage controllers of two converters have same bandwidth. To overcome these problems, this work proposes a compensating method of current reference considering slew interval and fast response in the PSFB converter. The effectiveness of the proposed method is proven using the PSIM simulation and experiment.