• Title/Summary/Keyword: Phase Synchronize System

Search Result 26, Processing Time 0.027 seconds

Performance Analysis of Carrier Recovery for OFDM/QPSK-DMR System Using Band Limited-Pulse Shaping Filter (대역 제한 필터를 적용하는 OFDM/QPSK-DMR 시스템에 대한 Carrier Recovery의 성능 분석)

  • Ahn, Jun-Bae;Yang, Hee-Jin;Oh, Chang-Heon;Cho, Sung-Joon
    • Proceedings of the Korea Electromagnetic Engineering Society Conference
    • /
    • 2003.11a
    • /
    • pp.403-406
    • /
    • 2003
  • In this paper, we have proposed a carrier recovery algorithm of OFDM/QPSK-DMR(Orthogonal Frequency Division Multiplexing/Quadrature Phase Shift Keying Modulation-Digital Microwave Radio)system using BL-PSF(Band Limited-Pulse Shaping Filter) and have analyzed the carrier phase MSE(Mean Square Error) performance of OFDM/QPSK and single carrier DMR systems. The existing OFDM/QPSK-DMR system using windowing requires training sequence or CP(Cyclic prefix) to synchronize a receive. carrier frequency. Because in the OFDM/QPSK-DMR system using BL-PSF there is no training sequence or CP(Cyclic Prefix), we also propose a carrier recovery useful to the system. The simulation results confirm that the proposed carrier recovery algorithm has the same carrier phase MSE(Mean Square Error) performance for the single carrier DMR system under AWGN(Additive White Gaussian Noise) environment.

  • PDF

Performance Analysis of Clock Recovery for OFDM/QPSK-DMR System Using Band Limited-Pulse Shaping Filter (대역 제한 필터를 적용하는 OFDM/QPSK-DMR 시스템에 대한 Clock Recovery의 성능 분석)

  • Ahn, Jun-Bae;Yang, Hee-Jin;Oh, Chang-Heon;Cho, Sung-Joon
    • Proceedings of the Korea Electromagnetic Engineering Society Conference
    • /
    • 2003.11a
    • /
    • pp.394-397
    • /
    • 2003
  • In this paper, we have proposed a clock recovery algorithm of OFDM/QPSK-DMR(Orthogonal Frequency Division Multiplexing/Quadrature Phase Shift Keying Modulation-Digital Microwave Radio)system using BL-PSF(Band Limited-Pulse Shaping Filter) and have analyzed the clock phase error variance performance of OFDM/QPSK and single carrier DMR systems. The existing OFDM/QPSK-DMR system using the windowing requires training sequence or CP(Cyclic Prefix) to synchronize a receiver clock frequency Because there is no training sequence or CP(Cyclic prefix) in our proposed DMR system, the proposed clock recovery algorithm is useful to the OFDM/QPSK-DMR system using BL-PSF, The simulation results confirm that the proposed clock recovery algorithm has the same clock phase error variance performance in a single carrier DMR system under AWGN(Additive White Gaussian Noise) environment.

  • PDF

PLL Control Strategy for ZVRT(Zero Voltage Ride Through) of a Grid-connected Single-phase Inverter (계통연계형 단상 인버터의 ZVRT(Zero Voltage Ride Through)를 위한 PLL 제어 전략)

  • Lee, Tae-Il;Lee, Kyung-Soo
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.24 no.3
    • /
    • pp.169-180
    • /
    • 2019
  • Grid codes for grid-connected inverters are essential considerations for bulk grid systems. In particular, a low-voltage ride-through (LVRT) function, which can contribute to the grid system's stabilization with the occurrence of voltage sag, is required by such inverters. However, when the grid voltage is under zero-voltage condition due to a grid accident, a zero-voltage ride-through (ZVRT) function is required. Grid-connected inverters typically have phase-locked loop (PLL) control to synchronize the phase of the grid voltage with that of the inverter output. In this study, the LVRT regulations of Germany, the United States, and Japan are analyzed. Then, three major PLL methods of grid-connected single-phase inverters, namely, notch filter-PLL, dq-PLL using an active power filter, and second-order generalized integrator-PLL, are reviewed. The proposed PLL method, which controls inverter output under ZVRT condition, is suggested. The proposed PLL operates better than the three major PLL methods under ZVRT condition in the simulation and experimental tests.

Observer-based Voltage Sensorless Control Scheme for an LCL-filtered Grid-connected Inverter

  • Lai, Ngoc Bao;Kim, Kyeong-Hwa
    • Proceedings of the KIPE Conference
    • /
    • 2017.07a
    • /
    • pp.266-267
    • /
    • 2017
  • To synchronize the distributed generation (DG) unit with the grid, the voltage sensors are generally employed to obtain the grid phase angle. This paper presents an observer-based voltage sensorless control scheme for a three-phase inverter connected to the grid through an LCL filter. The proposed control scheme consists of an augmented state observer and a feedback controller. The augmented state observer is used to estimate the grid voltages and states of the inverter system, which are then employed to determine the grid voltage angle and to construct the feedback controller. As a result of using the observer, only the grid current sensors are required to accomplish the control scheme. The simulation results are given to prove the validity of the proposed control scheme.

  • PDF

Performance Analysis of Clock Recovery for OFDM/QPSK-DMR System Using Band Limited-Pulse Shaping Filter (대역 제한 필터를 이용하는 OFDM/QPSK-DMR 시스템을 위한 클럭 복조기의 성능 분석)

  • 안준배;양희진;강희곡;오창헌;조성준
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.8 no.2
    • /
    • pp.245-249
    • /
    • 2004
  • In this paper, we have proposed a clock recovery algorithm of Orthogonal Frequency Division Multiplexing/Quadrature Phase Shift Keying Modulation-Digital Microwave Radio(OFDM/QPSK-DMR) system using Band Limited-Pulse Shaping Filter(BL-PSF) and compared the clock phase error variance of OFDM/QPSK-DMR system with that of single carrier DMR system. The OFDM/QPSK-DMR system using windowing method requires training sequence or Cyclic Prefix (CP) to synchronize the clock phase of received signal. But transmit efficient is increased in our proposed DMR system because of no using redundant data such as training sequence or CP. The proposed clock recovery algorithm is simply realized in the OFDM/QPSK-DMR system using BL-PSF. The simulation results confirm that the proposed clock recovery algorithm has the same clock phase error variance performance in a single carrier DR system under Additive White Gaussian Noise(AWGN) environment.

Speed Sensorless Control of Switched Reluctance Motor (스위치드 리럭턴스 전동기의 센서리스 속도제어)

  • Shin, Kyoo-Jae;Kwon, Young-Ahn
    • Journal of IKEEE
    • /
    • v.2 no.2 s.3
    • /
    • pp.166-172
    • /
    • 1998
  • Switched reluctance motor(SRM) has the advantages of simple structure, low rotor inertia and high efficiency. However, position sensor is essential in SRM in order to synchronize the phase excitation to the rotor Position. The Position sensors increase the cost of drive system and tend to reduce system reliability. This paper investigates the speed control of sensorless SRM in which the Phase current and change rate are utilized in position decision, and the period of dwell angle is variable for speed control. The proposed system consists of Position decision circuit, speed controller, digital logic commutator, switching angle controller and inverter The performances in the proposed system are verified through the experiment.

  • PDF

Design and Implementation of the frequency Monitoring System for the Small AC Generator (소형 AC 발전기의 주파수 모니터링 시스템 설계 및 구현)

  • Park, Ji-sang;Jeon, Min-ho;Lee, Myung-eui
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2013.05a
    • /
    • pp.997-999
    • /
    • 2013
  • In this paper, the frequency monitoring system for the small AC generator having two or more generator is designed and implemented to synchronize a voltage, phase and frequency for stable power supply. CT sensor is used to measure the amount of current flowing in the power line, and PT sensor is used to measure the amount of voltage across the power line. The experimental results show that the power frequency can be measured using the power frequency monitoring system developed in this paper. The frequency monitoring system proposed in this paper will be able to control the power generation system using two or more small generator efficiently.

  • PDF

Large Step Optimization Approach to Flexible Job Shop Scheduling with Multi-level Product Structures (다단계 제품 구조를 고려한 유연 잡샵 일정계획의 Large Step Optimization 적용 연구)

  • Jang, Yang-Ja;Kim, Kidong;Park, Jinwoo
    • Proceedings of the Korea Inteligent Information System Society Conference
    • /
    • 2002.05a
    • /
    • pp.429-434
    • /
    • 2002
  • For companies assembling end products from sub assemblies or components, MRP (Material Requirement Planning) logic is frequently used to synchronize and pace the production activities for the required parts. However, in MRP, the planning of operational-level activities is left to short term scheduling. So, we need a good scheduling algorithm to generate feasible schedules taking into account shop floor characteristics and multi-level job structures used in MRP. In this paper, we present a GA (Genetic Algorithm) solution for this complex scheduling problem based on a new gene to reflect the machine assignment, operation sequences and the levels of the operations relative to final operation. The relative operation level is the control parameter that paces the completion timing of the components belonging to the same branch in the multi-level job hierarchy. In order to revise the fixed relative level which solutions are confined to, we apply large step transition in the first step and GA in the second step. We compare the genetic algorithm and 2-phase optimization with several dispatching rules in terms of tardiness for about forty modified standard job-shop problem instances.

  • PDF

Effective timing synchronization methods for femtocell (펨토 기지국의 효과적인 타이밍 동기방안)

  • Shin, Jun-Hyo;Kim, Jung-Hun;Jeong, Seok-Jong
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2008.08a
    • /
    • pp.237-241
    • /
    • 2008
  • Femtocells are cellular access points that connect to a mobile operator's network using residential DSL or cable broadband connections. They have been developed to work with a range of different cellular standards including CDMA, GSM and UMTS. Like legacy base station, the frequency accuracy and phase alignment is necessary for ensuring the quality of service (QoS) for applications such as voice, real-time video, wireless hand-off, and data over a converged access medium at the femtocell. But, the GPS has some problem to be used at the femtocell, because it is difficult to set-up, depends on the satellite condition, and very expensive. So, some techniques are discussed to alternate with the legacy GPS system. NTP, PTP, Synchronous Ethernet use the ethernet to synchronize distributed clocks in packet networks. AGPS support reliable position information than the legacy GPS in poor signal conditions. But, These method also have some problems. So, hybrid timing method like A-GPS+PTP and TV+GPS was developed to make up the weak point of GPS. This paper introduces the each method and compare each other and y propose much better solution for timing synchronization at the Femtocell

  • PDF

A Synchronized Job Assignment Model for Manual Assembly Lines Using Multi-Objective Simulation Integrated Hybrid Genetic Algorithm (MO-SHGA) (다목적 시뮬레이션 통합 하이브리드 유전자 알고리즘을 사용한 수동 조립라인의 동기 작업 모델)

  • Imran, Muhammad;Kang, Changwook
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.40 no.4
    • /
    • pp.211-220
    • /
    • 2017
  • The application of the theoretical model to real assembly lines has been one of the biggest challenges for researchers and industrial engineers. There should be some realistic approach to achieve the conflicting objectives on real systems. Therefore, in this paper, a model is developed to synchronize a real system (A discrete event simulation model) with a theoretical model (An optimization model). This synchronization will enable the realistic optimization of systems. A job assignment model of the assembly line is formulated for the evaluation of proposed realistic optimization to achieve multiple conflicting objectives. The objectives, fluctuation in cycle time, throughput, labor cost, energy cost, teamwork and deviation in the skill level of operators have been modeled mathematically. To solve the formulated mathematical model, a multi-objective simulation integrated hybrid genetic algorithm (MO-SHGA) is proposed. In MO-SHGA each individual in each population acts as an input scenario of simulation. Also, it is very difficult to assign weights to the objective function in the traditional multi-objective GA because of pareto fronts. Therefore, we have proposed a probabilistic based linearization and multi-objective to single objective conversion method at population evolution phase. The performance of MO-SHGA is evaluated with the standard multi-objective genetic algorithm (MO-GA) with both deterministic and stochastic data settings. A case study of the goalkeeping gloves assembly line is also presented as a numerical example which is solved using MO-SHGA and MO-GA. The proposed research is useful for the development of synchronized human based assembly lines for real time monitoring, optimization, and control.