• Title/Summary/Keyword: Period of peak

Search Result 1,581, Processing Time 0.03 seconds

Characteristics of long-period swells measured in the near shore regions of eastern Arabian Sea

  • Glejin, Johnson;Kumar, V. Sanil;Amrutha, M.M.;Singh, Jai
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.8 no.4
    • /
    • pp.312-319
    • /
    • 2016
  • Measured wave data covering two years simultaneously at 3 locations along the eastern Arabian Sea reveals the presence of long-period (peak wave period > 18 s) low-amplitude waves (significant wave height < 1 m) and the characteristics of these waves are described in this article. In a year, 1.4-3.6% of the time, the low-amplitude long-period swells were observed, and these waves were mainly during the nonmonsoon period. The wave spectra during these long-period swells were multi-peaked with peak wave period around 18.2 s, the secondary peak period around 13.3 s and the wind-sea peak period at 5 s. The ratio of the spectral energy of the wind-sea peak and the primary peak (swell) was slightly higher at the northern location (0.2) than that at the southern location (0.15) due to the higher wind speed present at the northern location.

Inelastic Displacement Ratios for Smooth Hysteretic System Considering Characteristic Period of Earthquakes (지진의 특성주기를 고려한 완만한 곡선형 이력거동시스템의 비탄성 변위비)

  • Song, Jong-Keol
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.17 no.1
    • /
    • pp.1-10
    • /
    • 2013
  • In order to predict inelastic displacement response without nonlinear dynamic analysis, the equal displacement rule can be used for the structures with longer natural periods than the characteristic period, $T_g$, of earthquake record. In the period range longer than $T_g$, peak displacement responses of elastic systems are equal or larger than those of inelastic systems. In the period range shorter than $T_g$, opposite trend occurs. In the equal displacement rule, it is assumed that peak displacement of inelastic system with longer natural period than $T_g$ equals to that of elastic system with same natural period. The equal displacement rule is very useful for seismic design purpose of structures with longer natural period than $T_g$. In the period range shorter than $T_g$, the peak displacement of inelastic system can be simply evaluated from the peak displacement of elastic system by using the inelastic displacement ratio, which is defined as the ratio of the peak inelastic displacement to the peak elastic displacement. Smooth hysteretic behavior is more similar to actual response of real structural system than a piece-wise linear hysteretic behavior such as bilinear or stiffness degrading behaviors. In this paper, the inelastic displacement ratios of the smooth hysteretic behavior system are evaluated for far-fault and near-fault earthquakes. The simple formula of inelastic displacement ratio considering the effect of $T_g$ is proposed.

Impact of uncertain natural vibration period on quantile of seismic demand

  • Hong, H.P.;Wang, S.S.;Kwan, A.K.H.
    • Structural Engineering and Mechanics
    • /
    • v.28 no.4
    • /
    • pp.357-372
    • /
    • 2008
  • This study investigates effect of uncertainty in natural vibration period on the seismic demand. It is shown that since this uncertainty affects the acceleration and displacement responses differently, two ratios, one relating peak acceleration responses and the other relating the peak displacement responses, are not equal and both must be employed in evaluating and defining the critical seismic demand. The evaluation of the ratios is carried out using more than 200 strong ground motion records. The results suggest that the uncertainty in the natural vibration period impacts significantly the statistics of the ratios relating the peak responses. By using the statistics of the ratios, a procedure and sets of empirical equations are developed for estimating the probability consistent seismic demand for both linear and nonlinear systems.

Seismic Fragility Analysis Utilizing PDF Interpolation Technique (확률밀도함수 보간에 의한 교량의 지진취약도 분석)

  • ;;;Shigeru Kushiyama
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2003.10a
    • /
    • pp.495-502
    • /
    • 2003
  • This study proposed the Probability Density Function (PDF) interpolation technique to evaluate the seismic fragility curves as a function of the return period. Seismic fragility curves have been developed as a function of seismic intensities such as peak ground acceleration, peak pound velocity, and pseudo-velocity spectrum. The return period of design earthquakes, however, can be more useful among those seismic intensity measurements, because the seismic hazard curves are generally represented with a return period of design earthquakes and the seismic design codes also require to consider the return period of design earthquake spectrum for a specific site. In this respect the PDF interpolation technique is proposed to evaluate the seismic fragility curves as a function of return period. Seismic fragility curves based on the return period are compared with ones based on the peak ground acceleration for the bridge model.

  • PDF

Construction of Delay Predictine Models on Freeway Ramp Junctions with 70mph Speed Limit (70mph 제한속도를 갖는 고속도로 진출입램프 접속부상의 지체예측모형 구축에 관한 연구)

  • 김정훈;김태곤
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 1999.10a
    • /
    • pp.131-140
    • /
    • 1999
  • Today freeway is experiencing a severe congestion with incoming or outgoing traffic through freeway ramps during the peak periods. Thus, the objectives of this study is to identify the traffic characteristics, analyze the relationships between the traffic characteristics and finally construct the delay predictive models on the ramp junctions of freeway with 70mph speed limit. From the traffic analyses, and model constructions and verifications for delay prediction on the ramp junctions of freeway, the following results were obtained: ⅰ) Traffic flow showed a big difference depending on the time periods. Especially, more traffic flows were concentrated on the freeway junctions in the morning peak period when compared with the afternoon peak period. ⅱ) The occupancy also showed a big difference depending on the time periods, and the downstream occupancy(Od) was especially shown to have a higher explanatory power for the delay predictive model construction on the ramp junction of freeway. ⅲ) The speed-occupancy curve showed a remarkable shift based on the occupancies observed ; Od < 9% and Od$\geq$9%. Especially, volume and occupancy were shown to be highly explanatory for delay prediction on the ramp junctions of freeway under Od$\geq$9%, but lowly for delay predicion on the ramp junctions of freeway under Od<9%. Rather, the driver characteristics or transportation conditions around the freeway were through to be a little higher explanatory for the delay perdiction under Od<9%. ⅳ) Integrated delay predictive models showed a higher explanatory power in the morning peak period, but a lower explanatory power in the non-peak periods.

Construction of Speed Predictive Models on Freeway Ramp Junctions with 70mph Speed Limit. (70mph 제한속도를 갖는 고속도로 연결로 접속부상에서의 속도추정모형에 관한 연구)

  • 김승길;김태곤
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 1999.10a
    • /
    • pp.111-121
    • /
    • 1999
  • From the traffic analyses, and model constructions and verifications for speed prediction on the freeway ramp junctions with 70mph speed limit, the following results obtained: ⅰ) The traffic flow distribution showed a big difference depending on the time periods. Especially, more traffic flows were concentrated on the freeway junctions in the morning peak period when compared with the afternoon peak period. ⅱ) The occupancy distribution was also shown to be varied by a big difference depending on the time periods. Especially, the occupancy in the morning peak period showed over 100% increase when compared with the 24hours average occupancy, and the occupancy in the afternoon peak period over 25% increase when compared with the same occupancy.ⅲ) The speed distribution was not shown to have a big difference depending on the time periods. Especially, the speed in the morning peak period shown 10mph decrease when compared with the 24hours' average speed, but the speed did not show a big difference in the afternoon peak period.ⅳ) The analyses of variance showed a high explanatory power between the speed predictive models(SPM) constructed and the variables used, especially the upstream speed. ⅴ) The analysis of correlation for verifying the speed predictive models(SPM) constructed on the ramp junctions were shown to have a high correlation between observed data and predicted data. Especially, the correlation coefficients showed over 0.95 excluding the unstable condition on the diverge sectionⅵ) Speed predictive models constructed were shown to have the better results than the HCM models, even if the speed limits on the freeway were different between the HCM models and speed predictive models constructed.

Construction of Speed Predictive Models on Freeway Ramp Junctions with 70mph Speed Limit (70mph 제한속도를 갖는 고속도로 연결로 접속부상에서의 속도추정모형에 관한 연구)

  • 김승길;김태곤
    • Journal of Korean Port Research
    • /
    • v.14 no.1
    • /
    • pp.66-75
    • /
    • 2000
  • From the traffic analysis, and model constructions and verifications for speed prediction on the freeway ramp junctions with 70mph speed limit, the following results were obtained : ⅰ) The traffic flow distribution showed a big difference depending on the time periods. Especially, more traffic flows were concentrated on the freeway junctions in the morning peak period when compared with the afternoon peak period. ⅱ) The occupancy distribution was also shown to be varied by a big difference depending on the time periods. Especially, the occupancy in the morning peak period showed over 100% increase when compared with the 24hours average occupancy, and the occupancy in the afternoon peak period over 25% increase when compared with the same occupancy. ⅲ) The speed distribution was not shown to have a big difference depending on the time periods. Especially, the speed in the morning peak period showed 10mph decrease when compared with the 24hours'average speed, but the speed did not show a big difference in the afternoon peak period. ⅳ) The analyses of variance showed a high explanatory power between the speed predictive models(SPM) constructed and the variables used, especially the upstream speed. ⅴ) The analysis of correlation for verifying the speed predictive models(SPM) constructed on the ramp junctions were shown to have a high correlation between observed data and predicted data. Especially, the correlation coefficients showed over 0.95 excluding the unstable condition on the diverge section. ⅵ) Speed predictive models constructed were shown to have the better results than the HCM models, even if the speed limits on the freeway were different between the HCM models and speed predictive models constructed.

  • PDF

A Study on Performance Enhancement of Period Detection in Pulse Wave (맥파의 주기 검출 성능 개선에 관한 연구)

  • Lee, Hyun-Min;Kim, Dong-Jun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.6
    • /
    • pp.1194-1199
    • /
    • 2009
  • Heart rate may be a very important parameter in human health. To extract heart rate, the electrocardiogram(ECG) is commonly used. But the ECG acquisition procedure is very complex. On the other hand, the acquisition of pulse wave or photoplethysmogram(PPG) is very easy. However, the peak of PPG is not so sharp as ECG. This study tries to enhance the performance of peak detection in PPG signal. The method uses the average slopes around the main peak. The crossing point of the increasing and the decreasing slopes is selected as the peak point of heart rate period. The proposed method showed smoothed heart rate graph and reduced irregularity in heart rate values.

Evaluation on Reducing Peak Cooling Load Based on Dynamic Load Model of Building Perimeter Zones (건물의 외주부 존에 대한 동적 부하모델 이용 피크냉방부하 저감효과 분석)

  • Lee, Kyoung-Ho;Brau, James E.
    • Journal of the Korean Solar Energy Society
    • /
    • v.31 no.4
    • /
    • pp.1-8
    • /
    • 2011
  • In this paper, inverse building modeling was applied to building perimeter zones which have different window orientation. Two test zones of east-facing and west-facing zones in ERS(Energy Resource Station) building, which is representative of small commercial building, was used to test performance of cooling load calculation and peak cooling load reduction. The dynamic thermal load model for the east and west zone was validated using measured data for the zones and then it was used to investigate the effect of peak cooling load reduction by adjustment of indoor cooling temperature set points during on-peak time period. For the east zone, the peak load can be reduced to about 60% of the peak load for conventional control even without any precooling. For the west zone, PLR is nearly independent of the start of the on-peak period until a start time of 1pm. Furthermore, PLR has a small dependence on the precooling duration. Without any precooling, the peak cooling load can be reduced to about 35% of the peak load associated with conventional control.

Web Prefetching Scheme for Efficient Internet Bandwidth Usage (효율적인 인터넷 대역폭 사용을 위한 웹 프리페칭 기법)

  • Kim, Suk-Hyang;Hong, Won-Gi
    • Journal of KIISE:Information Networking
    • /
    • v.27 no.3
    • /
    • pp.301-314
    • /
    • 2000
  • As the number of World Wide Web (Web) users grows, Web traffic continues to increase at an exponential rate. Currently, Web traffic is one of the major components of Internet traffic. Also, high bandwodth usage due to Web traffic is observed during peak periods while leaving bandwidth usage idle during off-peak periods. One of the solutions to reduce Web traffic and speed up Web access is through the use of Web caching. Unfortunately, Web caching has limitations for reducing network bandwidth usage during peak periods. In this paper, we focus our attention on the use of a prefetching algorithm for reducing bandwidth during peak periods by using off-peak period bandwidth. We propose a statistical, batch, proxy-side prefetching scheme that improves cache hit rate while only requiring a small amount of storage. Web objects that were accessed many times in previous 24 hours but would be expired in the next 24 hours, are selected and prefetched in our scheme. We present simulation results based on Web proxy and show that this prefetching algorithm can reduce peak time bandwidth using off-peak bandwidth.

  • PDF