• Title/Summary/Keyword: Performance indicator

Search Result 949, Processing Time 0.026 seconds

A study on the composition validity of performance indicators for public sewage treatment plant by using factor analysis (요인분석기법을 활용한 공공하수처리시설 성과평가 지표의 구성 타당성 연구)

  • Yoon, Cheon-Yeo;Koo, Ja-Yong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.29 no.5
    • /
    • pp.583-590
    • /
    • 2015
  • Evaluation and comparison for the performance on the contracting-out became possible after the introduction of the performance indicators(PIs) in 2012 in Korea, And local governments and private companies are utilizing them as evaluation data to enhance the performance of the contracting-out. Several revisions on performance indicator were carried out by expert group on contents validity of PIs, But the review of the composition validity of PIs was not sufficient. In this study, the applicability, distinction ability and composition validity of PIs is evaluated by statistical method. From the results, Improvement of indicator is required in order to increase the interrelationship among indicators to enhance the compostion validity of indicators related with operation, sludge and water reuse.

Basic Research to Establish a Key Performance Indicator(KPI) System of Earthworks during Construction Project (건설공사 중 토공사의 핵심 지표 체계(KPI) 구축을 위한 기초연구)

  • Jung, Yong-Il;Lee, Chanwoo;Kang, Kyung-In;Cho, Hunhee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.85-86
    • /
    • 2021
  • KPI, an indicator that measures the performance of factors that contribute to achieving strategies of individuals or organizations, is used a lot to analyze the performance of construction work. Construction work consists of individual construction types with different characteristics such as progress method, scale, and input resources, but currently, KPIs for performance analysis of individual construction types are lacking. Therefore, this study aims to obtain and analyze data for establishing construction performance analysis KPIs during construction work to prepare the basis for the creation of future construction KPIs. Preliminary KPIs for earthwork performance analysis selected through this study are expected to be the basis for deriving preliminary KPIs for other individual construction types.

  • PDF

Deriving Performance Evaluation Indicator of Program for Developing the Next Generation of Top Security Leaders (차세대 보안리더 양성프로그램의 성과평가 지표 개발)

  • Park, Sung-Kyu;Kim, Tae-Sung;Kim, Jin-Seog;Yu, Seong-Jae
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.28 no.2
    • /
    • pp.501-511
    • /
    • 2018
  • The purpose of this study is to develop the performance evaluation indicator of information security training program for developing the next generation of top security leaders. Through literature review and focus group interview, we derived the performance areas and indicators based on the logic model. We conducted AHP(Analytic Hierarchy Process) questionnaire to calculate the weight of the derived indicators, and developed the performance indicator based on the survey results. Performance indicators were composed of 18 indicators in four main categories.

Critical financial variation of ratios between healthy and workout construction firms

  • Im, Haekyung;Choi, Jaehyun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.354-356
    • /
    • 2015
  • As domestic recession has had an adverse impact on many Korean companies in Korea, financial soundness has become a critical issues. It is essential to identify financial risk factors to prevent workout as well as to improve the financial condition of domestic construction companies. Therefore, this study derived important management indicators and the financial ratios that belong to each indicator through a comparative analysis between healthy companies and workout companies with financial statement. As a consequence, key financial ratios are derived into 3 of 25 ratios; Equity Ratio in stability indicator, Total Asset Turnover Ratio in activity indicator, and Labor Equipment Ratio in productivity indicator. So, Korean construction firms are required close monitoring these critical financial ratios indicating variation between construction companies which have opposing statuses in finance in order to keep sound financial condition and increase productivity.

  • PDF

Exploring Determinants of Performance Indicator and Customer Satisfaction of Accommodation Sharing

  • CHO, Yooncheong
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.3
    • /
    • pp.201-210
    • /
    • 2020
  • The study aims to investigate determinants of performance indicator and perceptions of existing and potential customers in accommodation sharing. This study uses data of Airbnb in Busan and Jeju from January 1 to December 31 in 2018, provided by AirDNA. The total number of listed accommodation sharing were 5,109 accommodations in Busan and 11,502 accommodations in Jeju. More than 90 property types of registered accommodation are subcategorized and re-classified in this study. Study 1 examined current usage and effects of factors on performance indicator in tourism destinations by applying Airbnb data. Study 2 investigated effects of perceived factors on satisfaction, intention to use, loyalty, and tourism competitiveness by applying online survey data. This study applies statistical analyses such as factor and regression analyses, ANOVA, t-test, and MANOVA. Results of Study 1 showed that usage and effects of accommodation sharing differ from regulation that is related to sharing types. Effects also differ based on travel destinations. Results of Study 2 showed how customers perceive accommodation sharing differ from pure meaning of sharing. The results of Study 1 and 2 found significant effects of price and service factors on performance indicator and customer satisfaction. The findings of Study 2 showed significant effects on loyalty and tourism competitiveness.

Investigation of the required performance to develop a performance-based indicator for balcony window systems in apartment houses (공동주택 발코니 창호의 성능기반지표 개발을 위한 요구성능 조사)

  • Moon, Hyeun-Jun;Ryu, Seung-Ho;Yang, Gi-Young
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.102-107
    • /
    • 2009
  • Window system is an essential component for lighting, ventilation and thermal environment in buildings. Moreover, as balcony extension in apartment houses become legalized, the performance requirements of window systems in balcony space are getting complicated. However, at this moment, five properties of the windows are used to represent the performance aspects of the system, including wind resistance, air tightness, water tightness, sound insulation, thermal resistance. And such single properties are not capable to express the performance of a space with the window systems in terms of performance concept. A performance analysis with wholistic approach is required to see the effect of the window system in built environment. Thus, performance-based approach should be established, which will be able to evaluate the goal/function and comfort of occupants/owners. As the first step to develop the performance indicator for the window systme for balcony space, this study conducts a survey to find the required performance aspects. A complete set of performance-based indicators will be developed with verification methods in the later stage of research.

  • PDF

A new damage detection indicator for beams based on mode shape data

  • Yazdanpanah, O.;Seyedpoor, S.M.;Bengar, H. Akbarzadeh
    • Structural Engineering and Mechanics
    • /
    • v.53 no.4
    • /
    • pp.725-744
    • /
    • 2015
  • In this paper, a new damage indicator based on mode shape data is introduced to identify damage in beam structures. In order to construct the indicator proposed, the mode shape, mode shape slope and mode shape curvature of a beam before and after damage are utilized. Mode shape data of the beam are first obtained here using a finite element modeling and then the slope and curvature of mode shape are evaluated via the central finite difference method. In order to assess the robustness of the proposed indicator, two test examples including a simply supported beam and a two-span beam are considered. Numerical results demonstrate that using the proposed indicator, the location of single and multiple damage cases having different characteristics can be accurately determined. Moreover, the indicator shows a better performance when compared with a well-known indicator found in the literature.

A Study on the Evaluation Model of Government-funded Research Institutes Using AHP (AHP를 이용한 정부출연연구소 평가 모형 연구)

  • Son, Eun Il;Baek, Chang Hwa
    • Journal of Korean Society for Quality Management
    • /
    • v.50 no.4
    • /
    • pp.665-677
    • /
    • 2022
  • Purpose: The purpose of this study is to analyze the current status and investigate relevant indicators so that R&D performance evaluation suitable for government-funded research institutes can proceed. A suitable performance evaluation model was presented based on the surveyed indicators. Based on the presented performance evaluation model, the importance was analyzed to calculate the weight for each indicator of the performance evaluation model. Methods: The method applied in this study presented a performance evaluation model based on the organizational performance evaluation cases of advanced overseas countries. By using the AHP(Analytic Hierarchy Process) technique, the weight of each indicator of the performance evaluation model was studied. Results: As a result of examining the indicators necessary for the evaluation model, focusing on overseas cases, 13 evaluation items were derived. A weight was calculated for the importance of the study results. And the scientific/technical research results showed the highest excellence. Conclusion: Key indicators of performance evaluation suitable for government-funded research institutes were derived and presented through detailed modeling in three stages. A realistic model that can objectively evaluate the performance of government-funded research institutes was proposed using the AHP technique.

A Study on the Development of Design Indicator and User Participation Design for Green Remodeling of School Facilitiess (학교시설의 그린리모델링을 위한 디자인지표 개발 및 사용자참여설계 활용에 관한 연구)

  • Kim, Eun-Hee;Ryu, Soo-Hoon
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.24 no.3
    • /
    • pp.3-13
    • /
    • 2017
  • This study has developed a design indicator required to promote green remodeling in school facilities. And, implemented the green remodeling pilot test on the school facilities that are planning actual remodeling. This pilot test suggested user participation design methodology such as verification of the developed design indicator, design goal setting, evaluation and adjustment of design proposal. The Green Remodeling Design Indicators were classified into 3 large categories of architectural performance, usability, and design through analysis of cases related to 'green buildings' and 'remodeling'. We have developed nine middle categories such as architectural and structural performance, facility performance, environmentally-friendly, circulation, space, amenity, harmony with surroundings, form and symbolization. In addition, 42 detailed indicators were developed for each category, including general, functional, and special indicators. For the verification of this study, two green remodeling design workshops were conducted for Gwangju J elementary school. The first design workshop presented the importance of the design indicator and set the goal of the design plan of green remodeling for project. And, the second Workshop presented the evaluation of the satisfaction with the design and the direction of future adjustment for project. The design indicator developed in this study can be utilized as a design indicator of design quality management and decision system for the school green remodeling in the future. In addition, by accumulating information on the Green Remodeling Project, it is necessary to spread green remodeling and construct a sustainable building environment.

Indicator of Facility Performance Evaluation (FPE) for Educational Facilities of BTL Projects

  • Lee, Kwan-Jong;Lee, Chun-Kyong;Park, Tae-Keun
    • Architectural research
    • /
    • v.14 no.1
    • /
    • pp.35-44
    • /
    • 2012
  • Build-Transfer-Lease (BTL) was introduced to the domestic construction market in 2005. Now, seven years later, the BTL model is most active for educational facilities. In 2011, 93 educational facility projects entered the maintenance stage. Considering the characteristics of today's BTL projects for educational facilities, the main issues are the initial performance and maintenance of educational facilities and the service-providing status for the 20-year operational management period, in relation to providing safety and convenience to students, the facility users. Seeking a solution, local education offices and departments in charge of BTL under the Ministry of Education, Science, and Technology have been exploring various methods of evaluating operational maintenance performance from various perspectives. For educational facility BTL projects, however, the appropriateness of initial operation performance evaluation, rather than considering the 20-year operational management period, is controversial in regards to sustainability. On this account, performance evaluation items in four areas-operational maintenance evaluation, facility performance status evaluation, maintenance subject evaluation, and sustainable change response evaluation-should be extracted. An indicator of facility performance evaluation is presented in this study through an AHP survey targeting experts, as part of establishing an operation performance evaluation system for educational facility BTL projects.