요인분석기법을 활용한 공공하수처리시설 성과평가 지표의 구성 타당성 연구 (A study on the composition validity of performance indicators for public sewage treatment plant by using factor analysis)

  • 윤여천;구자용
    • 상하수도학회지
    • /
    • 제29권5호
    • /
    • pp.583-590
    • /
    • 2015
  • Evaluation and comparison for the performance on the contracting-out became possible after the introduction of the performance indicators(PIs) in 2012 in Korea, And local governments and private companies are utilizing them as evaluation data to enhance the performance of the contracting-out. Several revisions on performance indicator were carried out by expert group on contents validity of PIs, But the review of the composition validity of PIs was not sufficient. In this study, the applicability, distinction ability and composition validity of PIs is evaluated by statistical method. From the results, Improvement of indicator is required in order to increase the interrelationship among indicators to enhance the compostion validity of indicators related with operation, sludge and water reuse.

INCENTIVE/DISINCENTIVE PROJECT SUCCESS FACTORS DURING MACARTHUR MAZE I-580 BRIDGE SPAN REPLACEMENT

  • Jae-Ho Pyeon;Marc Zomoradi
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.328-331
    • /
    • 2013
  • Incentive/Disincentive (I/D) contracting experiences in many states have been evaluated in terms of time and cost performance and substantial project time savings were found in many project cases. However, there is little understanding on individual project success factors for I/D projects during construction. This paper explores the significance of I/D clause in the success of the MacArthur Maze reconstruction project and summarizes a list of group causes that explains and elaborates on the detailed factors. The methods used for carrying out this study started with a search of online media and news reports and contract documents were also obtained from Caltrans. After review of the preliminary information, Interviews were performed with the Caltrans Resident Engineer and the contractor's project manager who were in charge of the MacArthur Maze reconstruction. In conclusion, the evaluation of their responses hinted at six significant cause groups responsible for the project's success. These groups can be listed as: 1) Motivation, 2) Policy, 3) Teamwork, 4) Communication, 5) Expectation, and 6) Resource Management.