• Title/Summary/Keyword: Peak-time

Search Result 4,675, Processing Time 0.044 seconds

Real-Time Peak Shaving Algorithm Using Fuzzy Wind Power Generation Curves for Large-Scale Battery Energy Storage Systems

  • Son, Subin;Song, Hwachang
    • International Journal of Fuzzy Logic and Intelligent Systems
    • /
    • v.14 no.4
    • /
    • pp.305-312
    • /
    • 2014
  • This paper discusses real-time peak shaving algorithms for a large-scale battery energy storage system (BESS). Although several transmission and distribution functions could be implemented for diverse purposes in BESS applications, this paper focuses on a real-time peak shaving algorithm for an energy time shift, considering wind power generation. In a high wind penetration environment, the effective load levels obtained by subtracting the wind generation from the load time series at each long-term cycle time unit are needed for efficient peak shaving. However, errors can exist in the forecast load and wind generation levels, and the real-time peak shaving operation might require a method for wind generation that includes comparatively large forecasting errors. To effectively deal with the errors of wind generation forecasting, this paper proposes a real-time peak shaving algorithm for threshold value-based peak shaving that considers fuzzy wind power generation.

A study of calculate a time to peak enhancement of contrast level by using blood flow (혈류에 의한 조영제 peak time의 산출에 관한 연구)

  • Choi, Kwan-Woo;Son, Soon-Yong;Lee, Ho-Beom
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.5
    • /
    • pp.2315-2321
    • /
    • 2013
  • This study attempt to develope and suggest a new, minimize side effects process for calculate a time to peak enhancement of contrast level by using blood flow instead of current mathematical process. We conducted a studies 127 patients who performed the CE MRA by using test-contrast inject way. We used measurements of a contrast inflow time and time to peak enhancement of contrast level of each cerebrovascular branch for similarity of witch cerebrovascular branch calculate a time to peak enhancement of contrast level by using blood flow in image compared with calculation a time to peak enhancement of contrast level by using current mathematical process after contrast enhancement. In this study, confidence interval were used if the variable is continuous variable; there is differences between 4 groups exist but in group 1, there is no difference with time in peak enhancement of contrast level by using mathematical method to inflow time in sinus sigmoideus. it was significant statistically, in addition there was significant low heterogeneity in Bland Altman plot. Thus, apply a new calculate a time to peak enhancement of contrast level by using blood flow method will minimize damage caused by side effect, maintain quality of image, easy and fast access. It should provide a space for the exchange of current calculate a time to peak enhancement of contrast level by using mathematical process.

A Study on Estimate Model for Peak Time Congestion

  • Kim, Deug-Bong;Yoo, Sang-Lok
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.20 no.3
    • /
    • pp.285-291
    • /
    • 2014
  • This study applied regression analysis to evaluate the impact of hourly average congestion calculated by bumper model in the congested area of each passage of each port on the peak time congestion, to suggest the model formula that can predict the peak time congestion. This study conducted regression analysis of hourly average congestion and peak time congestion based on the AIS survey study of 20 ports in Korea. As a result of analysis, it was found that the hourly average congestion has a significant impact on the peak time congestion and the prediction model formula was derived. This formula($C_p=4.457C_a+29.202$) can be used to calculate the peak time congestion based on the predicted hourly average congestion.

A study of contrast agent peak time using biomechanics factors experimental contrast medium infusion test using at contrast enhanced magnetic resonance angiography (조영증강검사 시 생체 요인을 이용한 조영제 peak time에 관한 연구)

  • Son, Soon-Yong;Kim, Yoon-Shin;Choi, Kwan-Woo;Seo, Sung-Mi;Min, Jung-Whan;Yoo, Beong-Gyu;Lee, Jong-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.2
    • /
    • pp.786-792
    • /
    • 2013
  • In this study was explored minimize side effects due to the additional injection of contrast medium and maintaining a high resolution imaging applied to the inspection and analysis of the contrast medium that affect the peak time biomechanics factors. Included 48 patients using the test bolus method, after measuring a patient's biomechanics factors of inspection before and during the test, correlation between contrast medium peak time and learn, matches the regression equation calculated and measured contrast medium peak time was assessed by the Bland Altman plot. Research result, inspections of SBP, HR contrast medium peak time and a significant negative correlation was, step 1, every increase, the contrast medium peak time significantly to -0.018 and -0.159 decreased, a fairly high concordance no difference between the two method. In conclusion, the regression equation using the existing methods, while maintaining excellent image quality that contrast medium is reduced to a patient, it can conclude that the alternative to the existing methods.

A1gorithm Embodiment for Automatic Pump Operation Pattern (원격지 수도시설 펌프운영 패턴의 자동화 알고리즘 구현)

  • Byun, Doo-Gyoon;Yoon, Young-Hwan
    • Proceedings of the KIEE Conference
    • /
    • 2003.07d
    • /
    • pp.2474-2476
    • /
    • 2003
  • An algorithm was embodied to automatic pump operation Pattern for remote control located in 60 km far. This automation pattern included least cost operation, peak load time response, pump operation time balancing etc. It was programmed four kind of operation mode as following; normal operation nude, before peak load time nude, peak load time operation, after peak load time operation.

  • PDF

Development of Runoff Hydrograph Model for the Derivation of Optimal Design Flood of Agricultural Hydraulic Structures(II) (농업수리구조물의 적정설계홍수량 유도를 위한 유출수문곡선 모형의 개발(II))

  • 이순혁;박명근;맹승진
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.38 no.3
    • /
    • pp.112-126
    • /
    • 1996
  • This study was conducted to develop an optimal runoff bydrograph model by comparison of the peak discharge and time to peak between observed and simulated flows derived by four different models, that is, linear time-invariant, linear time-variant, nonlinear time-invariant and nonlinear time-variant models under the conditions of heavy rainfalls with regionally uniform rainfall intensity in short durations at nine small watersheds. The results obtained through this study can be summarized as follows. 1. Parameters for four models including linear time-invariant, linear time-variant, nonlinear time-invariant and nonlinear time-variant models were calibrated using a trial and error method with rainfall and runoff data for the applied watersheds. Regression analysis among parameters, rainfall and watershed characteristics were established for both linear time-invariant and nonlinear time-invariant models. 2. Correlation coefficients of the simulated peak discharge of calibrated runoff hydrographs by using four models were shown to be a high significant to the peak of observed runoff graphs. Especially, it can be concluded that the simulated peak discharge of a linear time-variant model is approaching more closely to the observed runoff hydrograph in comparison with those of three models in the applied watersheds. 3. Correlation coefficients of the simulated time to peak of calibrated runoff hydrographs by using a linear time-variant model were shown to be a high significant to the time to peak of observed runoff hydrographs than those of the other models. 4. The peak discharge and time to peak of simulated runoff hydrogaphs by using linear time-variant model are verified to be approached more closely to those of observed runoff hydrographs than those of three models in the applied watersheds. 5. It can be generally concluded that the shape of simulated hydrograph based on a linear time-variant model is getting closer to the observed runoff hydrograph than those of three models in the applied watersheds. 6. Simulated hydrographs using the nonlinear time-variant model which is based on more closely to the theoritical background of the natural runoff process are not closer to the observed runoff hydrographs in comparison with those of three models in the applied watersheds. Consequently, it is to be desired that futher study for the nonlinear time-variant model should be continued with verification using rainfall-runoff data of the other watersheds in addition to the review of analyical techniques.

  • PDF

Analysis of Hydrograph by Dam Breach Shapes (댐 파괴형상에 따른 수문곡선 해석)

  • Park, Ki-Bum
    • Journal of Environmental Science International
    • /
    • v.16 no.4
    • /
    • pp.487-493
    • /
    • 2007
  • In this study is analysis which dams breach shapes are effect on peak discharge of dam-failure. The dam breach shapes and failure time are important peak discharge when dam failure. When dam failure times are 1hr, 2hr and 3hr condition for the ECRD and 0.1hr and 0.2hr for the CG and CFRD that breach shapes changed base length $B_b=1Hd,\;B_b=2Hd\;and\;B_b=3Hd$. As the results from DAMBRK(Dam Break model) peak discharge are increase base widths lengthen. As failure time is longer then peak discharge is decrease. So peak discharge is increase more short of dam failure time. Also peak discharge is increase become larger dam breach shapes.

Relationship between Impact and Shear Forces, and Shock during Running (달리기 시 충격력과 충격 쇼크 변인들과의 관계)

  • Park, Sang-Kyoon;Ryu, Ji-Seon
    • Korean Journal of Applied Biomechanics
    • /
    • v.30 no.2
    • /
    • pp.145-154
    • /
    • 2020
  • Objective: The purpose of this study was to determine the relationship between impact and shear peak force, and tibia-accelerometer variables during running. Method: Twenty-five male heel strike runners (mean age: 23.5±3.6 yrs, mean height: 176.3±3.3 m/s, mean mass: 71.8±9.7 kg) were recruited in this study. The peak impact and anteroposterior shear forces during treadmill running (Bertec, USA) were collected, and impact shock variables were computed by using a triaxial accelerometer (Noraxon, USA). One-way ANOVA was used to test the influence of the running speed on the parameters. Pearson's partial correlation was used to investigate the relationship between the peak impact and shear force, and accelerometer variables. Results: The running speed affected the peak impact and posterior shear force, time, slope, and peak vertical and resultant tibial acceleration, slope at heel contact. Significant correlations were noticed between the peak impact force and peak vertical and resultant tibia acceleration, and between peak impact average slope and peak vertical and resultant tibia acceleration average slope, and between posterior peak (FyP) and peak vertical tibia acceleration, and between posterior peak instantaneous slop and peak vertical tibial acceleration during running at 3 m/s. However, it was observed that correlations between peak impact average slope and peak vertical tibia acceleration average slope, between posterior peak time and peak vertical and resultant tibia acceleration time, between posterior peak instantaneous slope and peak vertical tibial acceleration instantaneous slope during running at 4 m/s. Conclusion: Careful analysis is required when investigating the linear relationship between the impact and shear force, and tibia accelerometer components during relatively fast running speed.

Time-Delay Effects on DC Characteristics of Peak Current Controlled Power LED Drivers

  • Jung, Young-Seok;Kim, Marn-Go
    • Journal of Power Electronics
    • /
    • v.12 no.5
    • /
    • pp.715-722
    • /
    • 2012
  • New discrete time domain models for the peak current controlled (PCC) power LED drivers in continuous conduction mode include for the first time the effects of the time delay in the pulse-width-modulator. Realistic amounts of time delay are found to have significant effects on the average output LED current and on the critical inductor value at the boundary between the two conduction modes. Especially, the time delay can provide an accurate LED current for the PCC buck converter with a wide input voltage. The models can also predict the critical inductor value at the mode boundary as functions of the input voltage and the time delay. The overshoot of the peak inductor current due to the time delay results in the increase of the average output current and the reduction of the critical inductor value at the mode boundary in all converters. Experimental results are presented for the PCC buck LED driver with constant-frequency controller.

A Dynamic assignment model for Dynamic Traffic Management in AM Peak (오전 첨두시의 동적 교통관리를 위한 동적 통행배정모형에 관한 연구)

  • 박준식;박창호;전경수
    • Journal of Korean Society of Transportation
    • /
    • v.19 no.4
    • /
    • pp.97-108
    • /
    • 2001
  • A dynamic transportation management should be applied specially in AM peak because AM peak is more critical than PM peak in traffic volume and demand. AM peak trip can be characterized by commuting and schooling. which have the high level of usage on public transportation, and constraint on arrival time. So transportation management applied in AM peak could deal with a mode choice and an arrival time constrain. Researchers were involved in the dynamic transportation assignment models for management of congested traffic network. But, there were no models which considered a mode choice and an arrival time constrain should be included in management of AM peak. So there are limits to use exist models to control and analyze AM peak traffic. In this study, it is proposed the combined dynamic transportation model, considering a mode choice and the start time selection with arrival time constrains, based on Ran and Boyce's model. The proposed model is verified the compatibility by applying to the newly designed time space expanded network. The result shows that proposed model consistent with dynamic user optimal travel pattern. From this we certificate the applicability of the proposed model to control and analyze AM peak traffic.

  • PDF