• Title/Summary/Keyword: Peak-shaving

Search Result 49, Processing Time 0.024 seconds

The Stack Design Considering The Reactive Power Supply of Grid-Connected Inverter (계통 연계형 인버터의 무효전력 공급을 고려한 Stack 설계)

  • Koh, Kwang-Soo;Oh, Pil-Kyoung;Kim, Hee-Jung;Kim, Young-Min
    • Proceedings of the KIPE Conference
    • /
    • 2016.07a
    • /
    • pp.453-454
    • /
    • 2016
  • The ESS(Energy Storage System) connected with distributed generation is drawing attention due to improving the quality load leveling, peak shaving for enhancing reliability of the power grid. The grid-connected inverter makes frequency adjustment to the active power's charge discharge according to the load variation. In addition, the inverter is possible to act as a reactive power compensation device to eliminate harmonic operates as power factor change inhibiting, anti-transient voltage fluctuation, active filter. In this paper, we propose a design method of igbt stack considering the reactive power supply capacity to improve the quality and reliability of the inverter. Moreover, the grid-connected inverter considering the four-quadrant rated operation designed stack and verified the feasibility of the design through a thermal analysis.

  • PDF

A Study on Simulation of Dynamic Characteristics in Prototype Microgrid (Prototype Microgrid의 동특성 모의에 관한 연구)

  • Choi, Eun-Sik;Choi, Heung-Kwan;Jeon, Jin-Hong;Ahn, Jong-Bo
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.12
    • /
    • pp.2157-2164
    • /
    • 2010
  • Microgrid is generally defined as cluster of small distributed generators, energy storages and loads. Through monitoring and coordinated control, microgrid can provide various benefits such as reduction of energy cost, peak shaving and power quality improvement. In design stage of microgrid, system dynamic simulation is necessary for optimizing of sizing and siting of DER(distributed energy resources). As number of the system components increases, simulation time will be longer. This problem can restrict optimal design. So we used simplified modeling on energy sources and average switching model on power converters to reduce simulation time. The effectiveness of this method is verified by applying to prototype microgrid system, which is consist of photovoltaic, wind power, diesel engine generators, battery energy storage system and loads installed in laboratory. Simulation by Matlab/Simulink and measurements on prototype microgrid show that the proposed method can reduce simulation time not sacrificing dynamic characteristics.

Estimation of Electrical Loads Patterns by Usage in the Urban Railway Station by RNN (RNN을 활용한 도시철도 역사 부하 패턴 추정)

  • Park, Jong-young
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.11
    • /
    • pp.1536-1541
    • /
    • 2018
  • For effective electricity consumption in urban railway station such as peak load shaving, it is important to know each electrical load pattern by various usage. The total electricity consumption in the urban railway substation is already measured in Korea, but the electricity consumption for each usage is not measured. The author proposed the deep learning method to estimate the electrical load pattern for each usage in the urban railway substation with public data such as weather data. GRU (gated recurrent unit), a variation on the LSTM (long short-term memory), was used, which aims to solve the vanishing gradient problem of standard a RNN (recursive neural networks). The optimal model was found and the estimation results with that were assessed.

Design and Characteristics Analysis of a 3 kW Grid-connected Photovoltaic Power Generation System (3 kW 계통연계형 태양광 발전시스템의 설계 및 실증운전특성 분석)

  • Hwang, I.H.;Jeong, S.J.;Ahn, K.S.;Lim, H.C.
    • Solar Energy
    • /
    • v.18 no.1
    • /
    • pp.19-25
    • /
    • 1998
  • This paper describes a design method and characteristics analysis of the 3 kW grid-connected photovoltaic power generation system to establish the basic application technology of photovoltaic systems. The design specification of a 3 kW photovoltaic power generation system including a DC/AC inverter is suggested to investigate the system performance for grid connection. The results of the demonstration test from February to October show that the system with utilization rate up to 17% has reliable operation characteristics and is useful for peak-shaving of utility power.

  • PDF

Short-term Electric Load Forecasting using temperature data in Summer Season (기온데이터를 이용한 하계 단기 전력수요예측)

  • Koo, Bon-gil;Lee, Heung-Seok;Lee, Sang-wook;Lee, Hwa-Seok;Park, Juneho
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.300-301
    • /
    • 2015
  • Accurate and robust load forecasting model plays very important role in power system operation. In case of short-term electric load forecasting, its results offer standard to decide a price of electricity and also can be used shaving peak. For this reason, various models have been developed to improve accuracy of load forecasting. This paper proposes a newly forecasting model for weather sensitive season including temperature and Cooling Degree Hour(C.D.H) data as an input. This Forecasting model consists of previous electric load and preprocessed temperature, constant, parameter. It optimizes load forecasting model to fit actual load by PSO and results are compared to Holt-Winters and Artificial Neural Network. Proposing method shows better performance than comparison groups.

  • PDF

ESS Optimal Charge-Discharge Schedule Generation Method Using Model Predictive Control Framework (모델예측제어 프레임워크를 이용한 ESS 최적 충방전스케줄 생성기법)

  • Sim, Jin-Yong;Lim, Jong-Mok;Jung, Sug-In;Kim, Jae-Hyun;Hong, Seung-Pyo;Shin, Jae-Ho
    • Proceedings of the KIPE Conference
    • /
    • 2019.11a
    • /
    • pp.232-233
    • /
    • 2019
  • ESS(Energy Storage System)의 도입을 통해 첨두부하의 경감(Peak Shaving)과 일종의 차익거래(Arbitrage) 효과를 실현할 수 있다. 본 논문에서는 경제적 이득의 극대화를 지향하는 ESS 최적 충방전스케줄 생성기법을 제안한다. 제안 기법은 모델예측제어(MPC: Model Predictive Control) 프레임워크를 기반으로 하였고 매트랩 시뮬레이션을 통하여 그 타당성을 검증하였다.

  • PDF

The Study on the generating systems in paralleled with utility (계통 병렬운전용 발전 SYSTEM 고찰)

  • Kim, Bang-Kwang;Kim, Kwang-Suk;Kim, Dong-Chool
    • Proceedings of the KIEE Conference
    • /
    • 1993.07b
    • /
    • pp.1084-1087
    • /
    • 1993
  • The importance of reliable electric power has increased rapidly with the proliferation of sophisticated communication systems, computers and critical surgical operations and it considered as one of the most important issues which must be reflected on initial engineering for construction. In this connection, this paper describes the basic conception of peak shaving and cogeneration which are widely used to control the electric power supply recently.

  • PDF

Economic Evaluation Algorithm of Energy Storage System using the Secondary Battery (이차전지를 이용한 전기저장장치(BESS)의 경제성 평가 알고리즘)

  • Song, Seok-Hwan;Kim, Byung-Ki;Oh, Seung-Teak;Lee, Kye-Ho;Rho, Daeseok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.6
    • /
    • pp.3813-3820
    • /
    • 2014
  • Recently, with the increase in electrical consumption and the unbalanced power demand and supply, the power reserve rate is becoming smaller and the reliability of the power supply is deteriorating. Under this circumstance, a Battery Energy Storage System (BESS) is considered to be an essential countermeasure for demand side management. On the other hand, an economic evaluation is a critical issue for the introduction of a power system because the cost of BESS is quite high. Therefore, this paper presents economic evaluation method for utility use by considering the best mix method and successive approximation method, and an economic evaluation method for customer use by considering the peak shaving function based on the real time price. From a case study on a model power system and educational customer, it was confirmed that the proposed method is a practical tool for the economic analysis of BESS.

A Framework for Investment Justification and Economic Operation- (한국의 다목적댐 수력발전 체계-투자의 정당화와 경제적 운영-)

  • 이승규;박용삼
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.12 no.1
    • /
    • pp.157-157
    • /
    • 1987
  • Hydro-electric power generation from multi-purpose dams has been playing important roles in the electric power supply network in Korea. Although the total share of hydro power in national electricity supply now becomes very small, the peak-shaving and frequency control capability of hydro power helps the power company enormously in maintaining the quality of power. But since the company that builds and operates the multi-purpose dams in Korea has to sell all the electricity produced to the monopolistic utility, there have been various problems in justifying the investment, designing pricing mechanism, and controlling operations of the power plants. In addition, economic evaluation of the hydro power has been distorted by a variety of reasons and hence it has been very difficult to encourage effective development and utilization of national water resources. To make the problem worse, both parties are public companies with X-inefficiency problems. Thus, changing environment requires to reengineer the system that governs hydro power generation. We address the problems of Korean hydro-electric power generation system in four areas: the investment justification process, the operations decison right of the hydro power plants, the pricing of the purchased-power, and the negotiation of contract revision. Then we propose improvement directions of new hydro-electric power system in view of static and dynamic efficiency, X-inefficiency and equity.

Hydro-electric Power Generation System of Multi-purpose Dams in Koresa - A Framework for Investment Justification and Economic Operation - (한국의 다목적댐 수력발전 체계 - 투자의 정당화와 경제적 운영 -)

  • 이승규;박용삼
    • Korean Management Science Review
    • /
    • v.12 no.1
    • /
    • pp.157-173
    • /
    • 1995
  • Hydro-electric power generation from multi-purpose dams has been playing important roles in the electric power supply network in Korea. Although the total share of hydro power in national electricity supply now becomes very small, the peak-shaving and frequency control capability of hydro power helps the power company enormously in maintaining the quality of power. But since the company that builds and operates the multi-purpose dams in Korea has to sell all the electricity produced to the monopolistic utility, there have been various problems in justifying the investment, designing pricing mechanism, and controlling operations of the power plants. In addition, economic evaluation of the hydro power has been distorted by a variety of reasons and hence it has been very difficult to encourage effective development and utilization of national water resources. To make the problem worse, both parties are public companies with X-inefficiency problems. Thus, changing environment requires to reengineer the system that governs hydro power generation. We address the problems of Korean hydro-electric power generation system in four areas: the investment justification process, the operations decison right of the hydro power plants, the pricing of the purchased-power, and the negotiation of contract revision. Then we propose improvement directions of new hydro-electric power system in view of static and dynamic efficiency, X-inefficiency and equity.

  • PDF