• Title/Summary/Keyword: Peak load

Search Result 1,231, Processing Time 0.027 seconds

Through load prediction and solar power generation prediction ESS operation plan(Guide-line) study (부하예측 및 태양광 발전예측을 통한 ESS 운영방안(Guide-line) 연구)

  • Lee, Gi-Hyun;Kwak, Gyung-il;Chae, U-ri;KO, Jin-Deuk;Lee, Joo-Yeoun
    • Journal of Digital Convergence
    • /
    • v.18 no.12
    • /
    • pp.267-278
    • /
    • 2020
  • ESS is an essential requirement for resolving power shortages and power demand management and promoting renewable energy at a time when the energy paradigm changes. In this paper, we propose a cost-effective ESS Peak-Shaving operation plan through load and solar power generation forecast. For the ESS operation plan, electric load and solar power generation were predicted through RMS, which is a statistical measure, and a target load reduction guideline for one hour was set through the predicted electric load and solar power generation amount. The load and solar power generation amount from May 6th to 10th, 2019 was predicted by simulation of load and photovoltaic power generation using real data of the target customer for one year, and an hourly guideline was set. The average error rate for predicting load was 7.12%, and the average error rate for predicting solar power generation amount was 10.57%. Through the ESS operation plan, it was confirmed that the hourly guide-line suggested in this paper contributed to the peak-shaving maximization of customers.Through the results of this paper, it is expected that future energy problems can be reduced by minimizing environmental problems caused by fossil energy in connection with solar power and utilizing new and renewable energy to the maximum.

Microgrid operating method in realtime pricing (실시간 전기요금제에서 마이크로그리드의 운용 방법)

  • Jyung, Tae-Young;Baek, Young-Sik
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.12
    • /
    • pp.2165-2172
    • /
    • 2010
  • This paper presents the operation algorithm of microgrid on the Real Time Pricing(RTP) for building the smart grid. RTP is higher power price variability than flat rate and time of use. However it has an effect on peak clipping and peak load shifting due to the increased price on peak time power demand. When the RTP are applied to the microgrid system, the proposed algorithm is able to be effective and economic operation. The implemented system is operated for the economic operation in microgrid connected with the power system. On the other hand, when the microgrid is operated on isolation mode, it focus on the improvement of stability and the power supply reliability of the sensitive loads. The test system are implemented and calculated on various operation modes based on non-dispachable generator output and RTP data for validating the proposed operation algorithm. The calculated results are compared to the implemented results using real-time simulator. It can be confirmed that the proposed operation system are identical results to the calculated one. When the proposed operation algorithm is applied to the system, it can be show the effectiveness of the peak clipping and peak load shifting and the improvement of economic feasibility.

Fuzzy LP Based Power Network Peak Shaving Algorithm (퍼지 LP 기반 전력망 Peak Shaving 알고리즘)

  • Ohn, Sungmin;Kim, Jung-Su;Song, Hwachang;Chang, Byunghoon
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.22 no.6
    • /
    • pp.754-760
    • /
    • 2012
  • This paper describes peak shaving algorithms as long-term cycle scheduling in the power management system (PMS) for MW-scale battery energy storage systems (BESS). The purpose of PMS is basically to manage the input and output power from battery modules placed in the systems. Assuming that an one-day ahead load curve is provided, off-line peak shaving algorithms can be employed, but applying the results of the off-line algorithm may result in the difference in the real-time performance because there is uncertainty in the provided load curve. This paper adopts fuzzy based LP (linear programming) algorithms for describing the peak shaving algorithm in PMS and discusses a solution technique and real-time operation strategies using the solution.

Experimental research on the behavior of circular SFRC columns reinforced longitudinally by GFRP rebars

  • Iman Saffarian;Gholam Reza Atefatdoost;Seyed Abbas Hosseini;Leila Shahryari
    • Computers and Concrete
    • /
    • v.31 no.6
    • /
    • pp.513-525
    • /
    • 2023
  • This research presents the experimental and theoretical evaluations on circular steel-fiber-reinforced-concrete (SFRC) columns reinforced by glass-fiber-reinforced-polymer (GFRP) rebar under the axial compressive loading. Test programs were designed to investigate and compare the effect of different parameters on the structural behavior of columns by performing tests. Theses variables included conventional concrete (CC), fiber concrete (FC), steel/GFRP longitudinal rebars, and transversal rebars configurations. A total of 16 specimens were constructed and categorized into four groups in terms of different rebar-concrete configurations, including GFRP-rebar-reinforced-CC columns (GRCC), GFRP-rebar-reinforced-FC columns (GRFC), steel-rebar-reinforced-CC columns (SRCC) and steel-rebar- reinforced-FC columns (SRFC). Experimental observations displayed that failure modes and cracking patterns of four groups of columns were similar, especially in pre-peak branches of load-deflection curves. Although the average ultimate axial load of columns with longitudinal GFRP rebars was obtained by 17.9% less than the average ultimate axial load of columns with longitudinal steel rebars, the average axial ductility index (DI) of them was gained by 10.2% higher than their counterpart columns. Adding steel fibers (SFs) into concrete led to the increases of 7.7% and 6.7% of the axial peak load and the DI of columns than their counterpart columns with CC. The volumetric ratio had greater efficiency on peak loads and DIs of columns than the type of transversal reinforcement. A simple analytical equation was proposed to predict the axial compressive capacity of columns by considering the axial involvement of longitudinal GFRP rebars, volumetric ratio, and steel spiral/hoop rebar. There was a good correlation between test results and predictions of the proposed equation.

Comparison of Lower Extremity Muscle Activity and Knee Joint Load according to Movement Speed Conditions during the Barbell Back Squat (바벨 백 스쿼트 시 운동 속도 조건에 따른 하지근 활성도 및 무릎 관절의 부하량 비교)

  • Moon-Seok Kwon;Jae-Woo Lee
    • Korean Journal of Applied Biomechanics
    • /
    • v.34 no.1
    • /
    • pp.25-33
    • /
    • 2024
  • Objective: The purpose of this study was to compare the lower extremity muscle activity and knee joint load according to movement speed conditions during the barbell back squat. Method: Nine males with resistance training experience participated in this study. Participants performed the barbell back squat in three conditions (Standard, Fast, and Slow) differing movement speed. During the barbell back squat, muscle activity of the rectus femoris (RF), vastus lateralis (VL), vastus medialis (VM), biceps femoris long head (BFL), semitendinosus (ST), gluteus maximus (GM), gastrocnemius (GCN), and tibialis anterior (TA) was collected using an 8 channel wireless EMG system. The peak flexion angle of the lower extremity joints and the peak resultant joint force in each direction of the knee joint were calculated using eight motion capture cameras and ground reaction force plates. This study was to used the Friedman test and the Wilcoxon signed rank test, to compare lower extremity muscle activity and peak resultant joint force at knee joint according to movement speed conditions during the barbell back squat, and the statistical significance level was set at .01. Results: In the downward phase of the barbell back squat, the RF and TA showed the higher muscle activity in the fast condition, and in the upward phase, RF, VL, VM, BFL, ST, GM, and TA showed the higher muscle activity in the fast condition. As a results, analyzing of the load on the knee joint, in the downward phase, and in the upward phase, the higher peak compressive force of the knee joint was showed in the fast condition. Conclusion: The barbell back squat with fast movement speed was more effective due to increased muscle activity of lower extremity, but one must be careful of knee joint injuries because the load on the knee joint may increase during the barbell back squat with fast movement speed.

A Comparative Study on Ice Load Characteristics between General and Ice-breaking Operations in Ice-covered Waters (빙해지역 일반 운항 및 쇄빙 운항 시의 빙하중 특성 비교 연구)

  • Lee, Min-Woo;Kwon, Yong-Hyeon;Rim, Chae-Whan;Lee, Tak-Kee
    • Journal of Ocean Engineering and Technology
    • /
    • v.29 no.1
    • /
    • pp.28-33
    • /
    • 2015
  • The icebreaking research vessel ARAON had her second ice trial in the Arctic Ocean from July 16 to August 12, 2010. In this study, the ice loads measured during the “general” operation and “ice breaking” operation in ice-covered waters were analyzed and compared. Whereas the “general” operation stands for the voyage in the water partially covered by ice, the “ice breaking” operation involved substantial ice floes for the ice breaking performance test. Based on the measured data, comparisons of the relationship between the ship speed and ice load, and between the locations of strain gauges and ice loads were investigated. Peak stresses higher than 20 MPa were found. The longitudinal and vertical correlations between the measurement location and ice load were analyzed, and the probability of peak stress was calculated. As a result, the probability function for higher ice loads during both operation modes was expressed in an exponential and power forms.

A Dynamic Rating System for Power Cables (I) - Real Time CTM(Conductor Temperature Monitoring) (전력 케이블 실시간 허용전류산정 시스템에 관한 연구 (I) - 실시간 도체 온도 추정 시스템)

  • 남석현;이수길;홍진영;김정년;정성환
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.52 no.7
    • /
    • pp.414-420
    • /
    • 2003
  • The domestic needs for larger capability of power sources are increasing to cope with the expanding power load which results from the industrial developments & the progressed life style. In summer, the peak load is mainly due to the non-industrial reasons such as air-conditioners and other cooling equipments. To cover the concentrated peak load in stable, the power transmission lines should be more constructed and efficiently operated. The ampacity design of the underground cable system is generally following international standards such as IEC287, IEC60853 and JCS168 which regards the shape of 100% daily full power loads. It is not so efficient to neglect the real shapes of load curves generally below 60~70% of full load. The dynamic (real time) rating system tends to be used with the measured thermal parameters which make it possible to calculate the maximum ampacity within required periods. In this paper, the CTM(Conductor Temperature Monitoring) which is the base of dynamic rating systems for tunnel environment is proposed by a design of lumped thermal network ($\pi$-type thermal model) and distribution temperature sensor attached configuration, including the estimation results of its performances by load cycle test on 345kV single phase XLPE cable.

Development of Measurement System of Cutter Conditions for Combine Diagnosis (I) - Analysis of Vibration and Load Signals - (콤바인 예취부 고장진단을 위한 예취 칼날부의 진단 시스템 개발(I) - 진동 및 부하 신호 분석 -)

  • Choi, Chang-Hyun;Kim, Yong-Joo;Kim, Jong-Hyuck;Mun, Joung-Hwan
    • Journal of Biosystems Engineering
    • /
    • v.32 no.3
    • /
    • pp.190-196
    • /
    • 2007
  • The purpose of this study is to develop a measurement system of cutter conditions for combine header diagnosis during rice harvesting. A load cell was installed at the locker-arm to measure load fluctuation and an acceleration senor was used to monitor vibration signal of cutter bar. The data were collected from a paddy field during harvesting. The tests were conducted with a normal cutter, a loosened cutter, a broken cutter, and a worn-out connecter pin at the field. The vibration signals converted by FFT (Fast Fourier Transformation), filtered, and normalized. The load data and peak values of vibration signals in four different frequency ranges were used to determine the cutting operation and the cutter conditions of combine. The multiple comparison tests showed that the load data and peak values of vibration signals were important to monitor the cutting operation and cutter conditions of combine header.

Basic research on the Building Energy Load Depending on The Climate Change in Korea (대한민국 표준기상데이터의 변화추이와 건물부하량에 관한 기초연구)

  • Yoo, Ho-Chun;Lee, Kwan-Ho;Kang, Hyun-Gu
    • Journal of the Korean Solar Energy Society
    • /
    • v.29 no.3
    • /
    • pp.66-72
    • /
    • 2009
  • As 'Low Carbon Green Building' is highly required, programs to evaluate building performance are actively and commonly used. For most of these programs, dynamic responses of buildings against external weather changes are very important. In order to simulate the programs, weather data of each region must be properly entered to estimate accurate amount of building energy consumption. To this end, the existing weather data and weather data of KSES were compared and analyzed to find out how weather changes. Energy load of Korea's standard houses was also analyzed based on this data. As a result, data corresponding to June ${\sim}$ September when cooling is supplied shows 23% of average increase with 30% of peak increase(June). On the other hand, data corresponding to November ${\sim}$ February when heating is supplied shows 29% of average decrease with 34% of peak decrease(November). Increase in cooling load and decrease in heating load in the above data comparison/analysis show that KSES 2009 data reflects increase in average temperature caused by global warming unlike the existing data. Increase in dry-bulb temperature depending on weather change of standard houses increases cooling load by 17% and decreases heating load by 36%

A Study on the Estimation of Temperature, Humidity and Cooling Load (온도, 습도 및 냉방부하 예측에 관한 연구)

  • Yoo, Seong-Yeon;Han, Seung-Ho;Lee, Je-Myo;Han, Kyou-Hyun;Noh, Kwan-Jong
    • Proceedings of the SAREK Conference
    • /
    • 2006.06a
    • /
    • pp.80-85
    • /
    • 2006
  • The peak demand of electricity in summer season mainly comes from the day time cooling loads. Ice thermal Storage System (ITSS) uses off-peak electricity at night time to make ice for the day time cooling. In order to maximize the use of cold storage in ITSS, the estimation of day time cooling load for the building is necessary. In this study, we present a method of cooling load estimation using 5 years of normalized outdoor temperature, relative humidity, and the building construction data. We applied the hourly-based estimation to a general hospital building with relatively less sudden heat exchange and the results are compared with the measured cooling load of the building. The results show that the cooling loads estimation depends on the indoor cooling design temperature of the building.

  • PDF