• Title/Summary/Keyword: Peak Load Boiler

Search Result 11, Processing Time 0.024 seconds

The development of microprocessor_based controller for the electrical boiler of heat storage type (축열식 전기보일러용 마이크로프로세서 제어장치개발)

  • Kim, J.S.;Park, J.W.;Joe, K.Y.;Kim, Y.H.
    • Proceedings of the KIEE Conference
    • /
    • 1989.11a
    • /
    • pp.250-253
    • /
    • 1989
  • As the necessity of increasing the midnight base load is extensively increased, electric power companies have to increase the demand of midnight electrical power by lowering the electrical charge rate at midnight. One of the most widely used midnight equipments is the heat Storage type's electrical boiler. A Single chip microprocessor controller for the heat-storage type's electrical boiler is developed. This controller call reduce the undesirable peak load at the begining of midnight (i.e.11 P.M.) time band by using backward load control method. Futhermore, this controller enables reservation of heat storge and the effective heating control the field test has been done by use the boiler for 66$m^2$ with the heater of 21KW quality.

  • PDF

Development of Load Distribution Controller on the Midnight-Power Boiler (심야전력용 보일러의 부하분산 제어기 개발)

  • Park, Hyun-Chul;Kim, Yeong-Min;Hwang, Jong-Sun;Lim, Byung-Hyun;Kim, Jong-Man
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2003.05b
    • /
    • pp.132-135
    • /
    • 2003
  • The use of the midnight power faces the crisis of the load peak-cut problem. Which appears at the simultaneous start of the midnight power system. We suggest a control method which uses the characteristics of boiler system. The system used that method consists of 6 heaters and are designed for the load distribution on each heater. Proposed method can take the balance of load during full time of midnight power supplied. The system is composed of measurement part and heater controller. Taking the data of the experience as a reason, the algorithm make the midnight power distribute. Experimental results show the validity of the method and the system proposed.

  • PDF

Development of Optimal Operation Algorithm about CES Power Plant (CES 발전소의 최적운용 알고리즘 개발)

  • Kim, Yong-Ha;Park, Hwa-Yong;Kim, Eui-Gyeong;Woo, Sung-Min;Lee, Won-Ku
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.26 no.2
    • /
    • pp.61-70
    • /
    • 2012
  • Recently due to the increasing of the importance on the green energy is getting higher by implementing EERS(Energy Efficiency Resource Standards) and NA(Negotiated Agreement) such as lacks of natural resources and The United Nations Framework Convention on Climate Change. And the most practical solution is CHP(Combined Heat and Power) which performs the best energy efficiency. This paper developed optimal operation mechanism of CES(Community Energy System) for enhancement of energy efficiency using CHP(Combined Heat and Power), PLB(Peak Load Boiler) and ACC(ACCumulator) capacities. This method optimally operated these capacities calculated the maximum profits by Dynamic Programing. Through the case studies, it is verified that the proposed algorithm of can evaluate availability.

Corrosion Failure Analysis of the Convection Part of District Heating Peak Load Boiler (지역난방 첨두부하보일러 대류부 부식 파손 분석)

  • Kim, Youngsu;Chae, Hobyung;Hong, Minki;Song, Min Ji;Cho, Jeongmin;Kim, Woo Cheol;Ha, Tae Baek;Lee, Soo Yeol
    • Corrosion Science and Technology
    • /
    • v.18 no.2
    • /
    • pp.55-60
    • /
    • 2019
  • Corrosion failure in the convection part of peak load boiler (PLB) of the district heating system led to water leakage. Herein, Internal Rotary Inspection System (IRIS) inspection was employed to examine wall thinning and the cause of leakage in the flue tube. The corrosive products of the turbulator and tube were investigated using scanning electron microscope combined with energy dispersive spectroscopy, X-ray diffraction, and inductively coupled plasma (ICP). Majority of the serious corrosion damage was observed near the turbulator located in the upper flue tube. ICP analysis of the boiler water revealed oxide formation of sodium chloride in the lower end part of the flue tube. A cross-sectional view of the turbulator revealed the presence of double-layers of the oxide film, indicating environmental change during operation associated with water leakage. The outer surface of the turbulator consisted of the acid oxides such as $NO_x$ and $SO_x$ along with sodium and chloride ions. Dew-point corrosion is hypothesized as the main cause for the formation of acid oxides in the region of contact of the flue tube and the turbulator.

A Survey on the Co-Generation Load for Large Commercial Buildings (대형상업건물의 열병합발전 부하조사)

  • 한승호;권순우;정상원;정재혁
    • Journal of Energy Engineering
    • /
    • v.7 no.2
    • /
    • pp.223-230
    • /
    • 1998
  • Energy consumption statistics have been surveyed for 50 large commercial buildings with high energy consumption records in Seoul City. The buildings were classified into three different groups for data analysis: hospitals, hotels, and department stores/office buildings. The analysis was focused on identifying installed boiler and refrigerator data, energy consumption rates, and energy load distribution throughout the year. Refrigerating electricity was confirmed again to affect most on the formation of the summer electricity load peak as expected. Replacing the refrigerator electricity peak in the summer with co-generation in large commercial buildings. However, overall heat load distribution in a single building is still considered not large enough for economically feasible co-generation and thus joint co-generation for multiple neighboring buildings are preferred and the Electric Power Law and LNG pricing policy should be revised favorably for co-generation in advance.

  • PDF

Performance Analysis of Sensible and Latent Energy Recovery System for Thermally Controlled Facilities (향온시설물에 대한 현열 및 잠열 에너지 회수시스템의 성능해석)

  • 박병규;김무근;김근오
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.12 no.12
    • /
    • pp.1057-1065
    • /
    • 2000
  • A sizing of sensible and latent energy recovery system with condensing heat exchanger is important to the design of a thermally controlled facilities. The transient system simulation program TRNSYS 14.2/IISiBat has been used to evaluate the energy consumptions of a thermally controlled facilities which consist of boiler, chiller and condensing heat exchanger, The boiler and chiller are selected based on the annual peak loads and controlled to maintain the setting temperature of $14~17^{\circ}C$. Simulation shows that the amount of sensible and latent energy recovered by heat exchanger is almost 20% of total heating load.

  • PDF

A Study on the Development of the Optimal Capacity Estimation Algorithm of Intergrated Energy Facilities Based on Operating Conditions (운용상태를 고려한 집단에너지설비의 최적용량 산정 알고리즘의 개발에 관한 연구)

  • Kim, Chang Sik;Song, Myung Ho;Yeom, Jee hoon;Shin, Jungyull
    • Journal of Energy Engineering
    • /
    • v.28 no.4
    • /
    • pp.94-102
    • /
    • 2019
  • The purpose of this study is to propose a method for optimizing heat generation facilities to maximize revenue by investigating their operational status during times of maximum heat demand for district heating. Based on the derived result, this study also proposes a method for determining a given power plant's optimal equipment, such as combined heat and power plant(CHP), peak load boilers (PLB), heat accumulators, and so on, depending on heat demand and facility capacities. It also offers a guide for how to operate facilities more economically by considering the operational status of district heating companies.

Performance Analysis of Sensible and Latent Energy Recovery System for Thermally Controlled Facility

  • Park, Byung-Kyu;Kim, Moo-Geun;Kim, Geun-Oh
    • International Journal of Air-Conditioning and Refrigeration
    • /
    • v.9 no.4
    • /
    • pp.17-26
    • /
    • 2001
  • Simulation was conducted using TRNSYS to evaluate the thermal performance of a facility. This facility has a condensing-type heat exchanger which is able to recover the latent energy for the purpose of reducing the heating energy in winter. The boiler and chiller are selected based on the annual peak loads and controlled to maintain the facility at the set temperature of 14~$17^\circ{C}$. Supplied energy by the boiler and recovered energy by the heat exchanger were calculated as a function of number of pass through heat exchanger, kind of fuel and hot water velocity. Simulation results show that about 20% of the total heating load can be recovered by the heat exchanger and the amount of latent heat is increasing with the number of pass. This means that the efficiency of the waste energy recovery system can be increased by using a condensing-type heat exchanger rather than a traditional sensible heat exchanger.

  • PDF

Comparison of Energy Performance between Ground-Source Heat Pump System and Variable Refrigerant Flow(VRF) Systems using Simulation (시뮬레이션을 통한 지열 히트펌프 시스템과 VRF 시스템의 에너지 성능비교)

  • Sohn, Byonghu;Lim, Hyojae;Kang, Seongjae
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.17 no.3
    • /
    • pp.30-40
    • /
    • 2021
  • This paper compares the annual energy performance of four different types of air-conditioning systems in a medium-sized office building. Chiller and boiler, air-cooled VRF, ground-source VRF, and ground-source heat pump systems were selected as the systems to be compared. Specifically, the energy performance of the GSHP system and the ground-source VRF system were compared with each other and also with conventional HVAC systems including the chiller and boiler system and air-cooled VRF system. In order to evaluate and compare the energy performances of four systems for the office building, EnergyPlus, a whole-building energy simulation program, was used. The EnergyPlus simulation results show that both the GSHP and the ground-source VRF systems not only save more energy than the other two systems but also significantly reduce the electric peak demand. These make the GSHP and the VRF systems more desirable energy-efficient HVAC technologies for the utility companies and their clients. It is necessary to analyze the impact of partial load performance of ground-source heat pump and ground-source VRF on the long-term (more than 20 years) performance of ground heat exchangers and entire systems.

Virtual Analysis of District Heating System Using ENetPLAN (EnetPLAN을 이용한 지역난방시스템 가상 운전 분석)

  • Ahn, Jeongjin;Lee, Minkyung;Kim, Laehyun
    • Journal of Energy Engineering
    • /
    • v.28 no.3
    • /
    • pp.18-25
    • /
    • 2019
  • In this study, in order to solve the problem of the program of calculating code input by experienced users in the power generation, the wide area energy network research group developed the local heating operation analysis program EntPLAN, which can be easily used by anyone, including scalability, with domestic technology. Therefore, the Commission intended to compare the heat sources, heat demand, and the results of operation of the combined heat plant (CHP) on the energy network through simulation with the EnetPLAN and the program A on the market. The results showed that the heat and power output on the energy network of the EnetPLAN and A programs were mostly similar in pattern in the simulation results of the heat supply and the operation method of the accumulator. This enabled the application of the simulation for the various operation modes of the cogeneration facilities existing on the energy network. It is expected that EntPLAN, which was developed with domestic technology, will be easily applied in the field in the future and will present efficient operation simulation results.