• Title/Summary/Keyword: Payback Period

Search Result 134, Processing Time 0.026 seconds

Study for Investments Flow Patterns in New-Product Development (신제품개발시 소요투자비 흐름의 기업특성별 연구)

  • Oh, Nakkyo;Park, Wonkoo
    • Korean small business review
    • /
    • v.40 no.3
    • /
    • pp.1-24
    • /
    • 2018
  • The purpose of this study is verifying with corporate financial data that the required investment amount flow shows a similar pattern as times passed, in new product development by start-up company. In the previous paper, the same authors proposed the required investment amount flow as a 'New Product Investment Curve (NPIC)'. In this study, we have studied further in various types of companies. The samples used are accounting data of 462 companies selected from 5,873 Korean companies which were finished external audit in 2015. The results of this study are as follows; The average investment period was 3 years for the listed companies, while 6 years for the unlisted companies. The investment payback period was 6 years for listed companies, while 17 years for unlisted companies. The investment payback period of the company supported by big affiliate company (We call 'greenhouse company') was 14~15 years, while 17 years for real venture companies. When we divide all companies into 4 groups in terms of R&D cost and variable cost ratio, NPIC explanatory power of 'high R&D and high variable cost ratio group (Automobile Assembly Business) is best. Among the eight investment cost indexes proposed to estimate the investment amount, the 'cash 1' (operating cash flow+fixed asset excluding land & building+intangible asset, deferred asset change)/year-end total assets) turned out to be the most effective index to estimate the investment flow patterns. The conclusion is that NPIC explanatory power is somewhat reduced when we estimate all companies together. However, if we estimate the sample companies by characteristics such as listed, unlisted, greenhouse, and venture company, the proposed NPIC was verified to be effective by showing the required investment amount pattern.

Analysis for the Economic efficiency of District Heating and Gas Engine Co-generation System comparing with Central Heating System (중앙난방방식을 지역난방.소형열병합난방방식으로 전환시의 경제성 비교 분석)

  • Kim, Kyu-Saeng;Lee, Sang-Hyeok;Hong, Kyung-Pyo;Won, Young-Jae
    • Proceedings of the SAREK Conference
    • /
    • 2007.11a
    • /
    • pp.459-465
    • /
    • 2007
  • This study was conducted to calculate the LCC of a apartment complex with a type of heating system, district heating and cogeneration system. For the purpose of analyzing LCC according to size of apartment complex, 500, 1,500 and 4,000 houses of model apartment selected. This research performs design of heating system and the life cycle cost analysis including an initial cost, energy cost, maintenance and operation cost, replacement cost and renovation cost during the project period(15years). According to the calculated results, 1) Initial cost of cogeneration system with 500, 1500 and 4000 houses is higher than district heating system each of 20%, 13%, 12%. 2) In case of cogeneration system, the payback period by electric generation is 5.21, 4.92 and 4.47 years and saving cost was calculated 29 billion won, 94 billion won and 262 billion won after payback period. 3) Cogeneration system LCC was 1.12, 1.07 and 1.06 times larger than district system with the size of apartment complex. According to the case of this study district heating system is more efficient than cogeneration system in terms of the reduction of LCC. 4) Gas Engine Co-generation System is more efficient than other systems because it can collect progressive part from electric charge progressive stage system. However, the efficiency is decreasing because of raising of fuel bills(LNG) and lowering of power rate for house use. Especially the engine is foreign-made so the cost of maintenance and repair is high and the technical expert is short. 5) District heating is also affected by fuel bills so we should improve energy efficiency through recovering of waste heat(incineration heat, etc.). Also, we should supply district cooling on the pattern of heat using of let the temperature high in winter and low in summer.

  • PDF

Analysis of the Economic Efficiency of the District Heating and Gas Engine Co-Generation System Compared with the Central Heating System (중앙난방방식을 지역난방과 소형열병합난방 방식으로 전환 시 경제성 비교 분석)

  • Kim, Kyu Saeng
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.27 no.10
    • /
    • pp.544-551
    • /
    • 2015
  • This study was conducted to determine the LCC of apartment complexes with district heating and a cogeneration system. For the purpose of analyzing LCC according to the size of the apartment complex, 500, 1,500, and 4,000-unit model apartments were selected. Analysis was performed on the design of the heating system and the life cycle cost including total construction cost, maintenance and operation cost for the duration of the project period (15 years). According to the calculated results, 1) The initial cost of the cogeneration system for 500, 1,500, and 4,000-unit apartments is higher than that of the district heating system by 20%, 13%, and 12%, respectively. 2) In the case of the cogeneration system, the payback period by electric generation was found to be 5.21, 4.92 and 4.47 years, and saving cost was calculated to be 29 billion won, 94 billion won and 262 billion won after the payback period for 500, 1,500, and 4,000-unit apartments, respectively. 3) The LCC values of the cogeneration system were 1.12, 1.07 and 1.06 times larger than those of the district system according to the size of the apartment complex. In this study, the district heating system was found to be more efficient than the cogeneration system in terms of LCC reduction. 4) District heating is affected by fuel bills, so energy efficiency should be improved through recovering waste heat (incineration heat, etc.). Also, district cooling should be provided according to heat use to keep the temperature high in winter and low in summer.

Proposal of New Correction Factors for New and Renewable Energy Sources in Public Building (공공건축물에 적용되는 신·재생에너지원의 새로운 보정계수 제안)

  • Kim, Yun-Ho;Park, Yun-Ha;Won, An-Na;Hwang, Jung-Ha
    • Journal of the Korean Solar Energy Society
    • /
    • v.36 no.6
    • /
    • pp.13-24
    • /
    • 2016
  • The government introduced a mandatory installation system of new & renewable energy for public building to meet the target of greenhouse gas reduction and also suggest a correction factor for new renewable energy to expand the installation of various new & renewable energy systems. The introduction of correction factors, however, was followed by the reduction of installation size of new & renewable energy sources. Assuming that it was caused by a correction factor for each new renewable energy source calculated by the initial costs, this study proposed a new correction factor approach based on payback periods to reflect the technology element in the calculation process of correction factors additionally. The application results of new correction factors show that it was possible to do complex calculations including the economic and technological aspects to select a new & renewable energy system and that the installation size was also enlarged.

Management Strategies for Medical Expenses Depending on Type of Diseases for Patients of Seafarers Insurance - Focused on Busan - (선원보험 수진자의 상병유형에 따른 진료비 관리방안 - 부산지역을 중심으로 -)

  • Park, Eun-Ha;Hwang, Byung-Deog
    • The Korean Journal of Health Service Management
    • /
    • v.10 no.4
    • /
    • pp.1-11
    • /
    • 2016
  • Objectives : The aim of this study is to investigate the actual condition of the occurrence and recovery of medical expenses through seafarers insurance and to provide basic data that will be helpful in the establishment of efficient hospital management strategies for medical expenses of insurance companies depending on the type of seafarers insurance. Methods : Three general hospitals located in Busan, Korea, were selected, and seafarers insurance claim data was collected from January 1, 2012 to December 31, 2013(24 months) and analyzed. There were 5,490 cases in total. Results : There was a significant difference in the distribution of disease incidence, accrued medical expenses, reimbursement of medical expenses, and the actual condition of medical receivables depending on the insurance company. Conclusions : Therefore, differentiated payback strategies for medical expenses are needed that consider the various seafarers insurance companies and their treatment characteristics.

An Economic Analysis on Dual-fuel Engine Generation for Peak Load (피크부하용 혼소엔진발전의 경제성 분석)

  • Lee, Ok-Bae;Ahn, Jae-Kyoung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.9
    • /
    • pp.1260-1268
    • /
    • 2012
  • Recently, lack of power reserve margin was observed quite often. In this paper, we studied the method to secure power source for a short time, to cut the utility power peak load, and to reduce the users electricity bills. Emergency diesel generator of an office building is to be converted into a dual-fuel engine generator which is responsible for a portion of the peak load. Compared to the conventional diesel fuel generator, the proposed dual-fuel engine is able to reduce the generation power cost by dual-fuel combustion, and it also mitigates the building's utility power peak load by charging the building's peak load. If the dead resources (a group of emergency dual-fuel engine generators), as a Virtual Power Plant, are operating in peak time, we can significantly reduce future large power development costs. We investigated the current general purpose electricity bills as well as the records of the building electric power usage, and calculated diesel engine generator renovation costs, generation fuel costs, driving conditions, and savings in electricity bills. The proposed dual-fuel engine generation method reduces 18.1% of utility power peak load, and turned out to be highly attractive investment alternative which shows more than 27% of IRR, 76 million won of NPV, and 20~53 months of payback periods. The results of this study are expected to be useful to developing the policy & strategy of the energy department.

Analysis of Life Cycle Cost for Heat Source Equipments in Buildings for Adolescent Trainees (청소년 수련관의 열원설비 대안별 생애주기 비용에 관한 연구)

  • Ahn, Chang-hwan;Pang, Seung-ki;Baik, Yong-gyu
    • KIEAE Journal
    • /
    • v.5 no.3
    • /
    • pp.25-31
    • /
    • 2005
  • Computer simulations were performed for Heating Ventilating and Air-Conditioning (HVAC) systems to figure out more efficient maintenance methods for the building used for adolescent trainees. This study aims at suggesting design alternatives for optimum operation and performing life cycle cost (LCC) for each alternative. First, the capacity of the heat source equipment was determined using annual maximum heating and cooling loads. Annual loads were calculated and applied to the alternative for the purpose of calculating annual energy cost. Second, several types of data were collected to predict energy cost. Finally, the pay back period for each alternative was calculated using total cost estimation during standard duration period. This study indicates that the absorption chiller that does not occupy most part of a mechanical room, and does not need much operation cost was most economical.

A Study on Economic Analysis Algorithm for Energy Storage System Considering Peak Reduction and a Special Tariff (피크저감과 특례요금제를 고려한 ESS 경제성 분석 알고리즘에 관한 연구)

  • Son, Joon-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.10
    • /
    • pp.1278-1285
    • /
    • 2018
  • For saving electricity bill, energy storage system(ESS) is being installed in factories, public building and commercial building with a Time-of-Use(TOU) tariff which consists of demand charge(KRW/kW) and energy charge(KRW/kWh). However, both of peak reduction and ESS special tariff are not considered in an analysis of initial cost payback period(ICPP) on ESS. Since it is difficult to reflect base rate by an amount of uncertain peak demand reduction during mid-peak and on-peak periods in the future days. Therefore, the ICPP on ESS can be increased. Based on this background, this paper presents the advanced analysis method for the ICPP on ESS. In the proposed algorithm, the representative days of monthly electricity consumption pattern for the amount of peak reduction can be found by the k­means clustering algorithm. Moreover, the total expected energy costs of representative days are minimized by optimal daily ESS operation considering both peak reduction and the special tariff through a mixed-integer linear programming(MILP). And then, the amount of peak reduction becomes a value that the sum of the expected energy costs for 12 months is maximum. The annual benefit cost is decided by the amount of annual peak reduction. Two simulation cases are considered in this study, which one only considers the special tariff and another considers both of the special tariff and amount of peak reduction. The ICPP in the proposed method is shortened by 18 months compared to the conventional method.

A Technical and Economic Evaluation of Cobalt-rich Manganese Crusts (심해저 망간각 개발의 경제성 평가)

  • Park, Se-Hun;Yang, Hee-Cheol
    • Ocean and Polar Research
    • /
    • v.31 no.2
    • /
    • pp.167-176
    • /
    • 2009
  • Cobalt-rich manganese crusts on seamounts have received an increasing amount of attention as future resources for Co, Ni, Cu, and Mn. A dearth of detailed information regarding the relevant distribution characteristics, mining technologies, and ore processing technologies, however, has precluded potential evaluations of the technical and economic advantages of these crusts. In the past 4 years, Korea has undertaken a survey of the cobalt-rich manganese crusts in and around the Magellan Seamount and Mid-Pacific Mountains. This paper introduces the preliminary feasibility study of the distribution features and R&D results centered around the development of the cobalt-rich manganese crusts. The evaluation model was developed by modifying the model for the manganese nodules. In addition to considering the geological and geophysical differences between the manganese nodules and the cobalt-rich manganese crusts, an ore dressing subsystem was installed in the model. The mining subsystem is composed of a self-propelled collector--a pipeline with submersible hydraulic pumps for crust lifting. The smelting and chlorine leach method was selected for metallurgical processing. The production scales were established at 2,500t/y of cobalt metal. The production of three metals--cobalt, nickel, and copper--was considered in terms of metallurgical processing. The economic feasibility analyses demonstrated that the payback period was 11.4 years, the NPV was 36M$, and the IRR was 9.6% with the economic factors in the case of a cobalt price of US$ 25/lb. It was also demonstrated in this study that the payback period was 8.6 years, the NPV was 154M$, and the IRR was 14.0% in the case of a cobalt price of US$ 30/lb. This indicates that the approach under consideration appears to offer greater potential given the predicted metal prices.

Economic analysis of Frequency Regulation Battery Energy Storage System for Czech combined heat & power plant (체코 열병합발전소 주파수조정용 배터리에너지저장장치 경제성 분석)

  • KIM, YuTack;Cha, DongMin;Jung, SooAn;Son, SangHak
    • Journal of Energy Engineering
    • /
    • v.29 no.2
    • /
    • pp.68-78
    • /
    • 2020
  • According to the new climate change agreement, technology development to reduce greenhouse gases is actively conducted worldwide, and research on energy efficiency improvement in the field of power generation and transmission and distribution is underway [1,2]. Economic analysis of the operation method of storing and supplying surplus electricity using energy storage devices, and using energy storage devices as a frequency adjustment reserve power in regional cogeneration plants has been reported as the most profitable operation method [3-7]. Therefore, this study conducted an economic analysis for the installation of energy storage devices in the combined heat and power plant in the Czech Republic. The most important factor in evaluating the economics of battery energy storage devices is the lifespan, and the warranty life is generally 10 to 15 years, based on charging and discharging once a day. For the simulation, the ratio of battery and PCS was designed as 1: 1 and 1: 2. In general, the primary frequency control is designed as 1: 4, but considering the characteristics of the cogeneration plant, it is set at a ratio of up to 1: 2, and the capacity is simulated at 1MW to 10MW and 2MWh to 20MWh according to each ratio. Therefore, life was evaluated based on the number of cycles per year. In the case of installing a battery energy storage system in a combined heat and power plant in the Czech Republic, the payback period of 3MW / 3MWh is more favorable than 5MW / 5MWh, considering the local infrastructure and power market. It is estimated to be about 3 years or 5 years from the simple payback period considering the estimated purchase price without subsidies. If you lower the purchase price by 50%, the purchase cost is an important part of the cost for the entire lifetime, so the payback period is about half as short. It can be, but it is impossible to secure profitability through the economy at the scale of 3MWh and 5MWh. If the price of the electricity market falls by 50%, the payback period will be three years longer in P1 mode and two years longer in P2 and P3 modes.