• Title/Summary/Keyword: Pavement condition

Search Result 252, Processing Time 0.021 seconds

The Study of the Roughness of the Pavement on the Bridge Deck and Approach Slab using a 5year(2003 to 2007) Pavement Condition Survey Data (HPMS 데이터를 이용한 고속도로 교량 및 뒷채움구간 평탄성 특성 연구)

  • Park, Sang-Wook;Suh, Young-Chan
    • International Journal of Highway Engineering
    • /
    • v.10 no.3
    • /
    • pp.189-197
    • /
    • 2008
  • Using a 5 year(2003 to 2007) pavement condition survey data from the highway pavement management system(HPMS), the roughness of the bridge deck pavement was analyzed. Based on the result of this analysis, this study tried to identify the factors affecting the deterioration of the bridge deck pavement condition. The data from HPMS indicates that the roughness of the bridge deck pavement is worse than that of the general pavement on the roadbed. The worse roughness of the bridge deck pavement is caused by the settlement of approach slab as well as the surface distress on the bridge deck pavement. In order to improve effectively the roughness of the bridge deck pavement, a management system was established in which not only the regular automated pavement condition survey to check the distress of surface of the bridge deck pavement was adopted but an automated surface profiler to check the degree of settlement of approach slab was applied.

  • PDF

A Study on Development of the Concrete Pavement Condition Index (콘크리트 포장상태 평가지수의 개발에 관한 연구)

  • Kwon, Soo-Ahn;Kim, Nam-Ho;Seo, Young-Chan
    • International Journal of Highway Engineering
    • /
    • v.2 no.3
    • /
    • pp.145-153
    • /
    • 2000
  • Pavement evaluation is a fundamental component for rational pavement management. Optimal rehabilitation method and the priority of rehabilitation should be based on the evaluation data. Some types of pavement condition index are needed for objective evaluation of Pavement condition and management of road network. In this study a expressway concrete pavement condition index model is developed through regression analysis that correlates panel rating with distress measurement from the test sections. The derived condition index can be used for network level PMS for the expressway concrete pavement. Correlation coefficient of the model was 0.68. The selected independent variables were International Roughness Index, crack and area of patching.

  • PDF

Estimation of Performance and Pavement Life using National Highway Pavement Condition Index (NHPCI 지표를 활용한 공용성 추정과 수명 산정)

  • Do, Myung-Sik;Lee, Yong-Jun;Lim, Kwang-Su;Kwon, Soo-Ahn
    • International Journal of Highway Engineering
    • /
    • v.14 no.5
    • /
    • pp.11-19
    • /
    • 2012
  • PURPOSES: The new methodology is proposed for estimation of long-term performance and pavement life based on the national highway database in Daejeon area. Furthermore, this study tried to verify the applicability of performance estimation using NHPCI (National Highway Pavement Condition Index) on tendency of pavement deterioration as time goes by under Korean road environments. METHODS: Reliability theories are applied to estimate the mean life and to determine the appropriate distribution using 3 levels of traffic loads (high, medium, low) based on maintenance and rehabilitation history data for 15 years. RESULTS: As a result, Lognormal distribution is suitable for explanation of pavement lifetime in Daejeon area regardless of traffic loads. In addition, we found that the results of mean life and maintenance timing based on NHPCI for the pavement sections of 3 levels of traffic loads are available. CONCLUSIONS: Based on this study, it was found that mean life of high, medium and low levels of traffic loads are about 8.1 years, 12.2 years and 12.7 years, respectively. Higher level of traffic loads shorten the pavement mean life.

A Study for Determining the Rehabilitation Method Group using NHPCI on Asphalt Concrete Pavement of National Highway (국도 아스팔트 포장의 NHPCI(National Highway Pavement Condition Index)를 활용한 보수공법그룹 결정에 관한 연구)

  • Son, Hyeon Jang;Kwon, Soo-Ahn;Lee, Jae Jun;Baek, Cheolmin;Lim, Jae Kuy;Sin, Hyun Jin
    • International Journal of Highway Engineering
    • /
    • v.15 no.2
    • /
    • pp.1-9
    • /
    • 2013
  • PURPOSES : The PMS(Pavement Management System) has been utilized in order to efficiently allocate the limited budget for the maintenance of national highway system. In the PMS of national highway, surface pavement condition is evaluated by using the VI (Visual Index). However, the VI is determined only by considering the cracking rate (%) and rut depth (mm), which is not reflecting the IRI (International Roughness Index) that is known as an important factor of pavement performance. In this study, the NHPCI (National Highway Pavement Condition Index) which includes the cracking rate (%), rut depth (mm), and IRI (m/km) is suggested for determining the rehabilitation methods group. METHODS : First, the rehabilitation methods performed between 2008 and 2010 on the national highway is classified and then, NHPCI is determined for each rehabilitation method. Next, the NHPCI for each rehabilitation method is grouped through the interval estimation of the population mean and T-test analysis. RESULTS : According to NHPCI range, the rehabilitation methods are divided into four categories: Not Required, Preventive Maintenance, Overlay Treatment (with or without cutting), and Full-scale Treatment (i.e., reconstruction). CONCLUSIONS : Based on this study, it is recommended that the appropriate NHPCI range should be determined through the combination of the rehabilitation categories and Decision Procedure of Pavement Distress Condition Visual Index.

Case Study on Deciding a Time for Repairing Asphalt Pavement of Incheon International Airport (인천국제공항 아스팔트 포장 보수시기 결정 사례 연구)

  • Lee, Jae-Ho;Kim, Jang-Rack;Mun, Hyung-Chul;Cho, Nam-Hyun
    • International Journal of Highway Engineering
    • /
    • v.15 no.6
    • /
    • pp.49-60
    • /
    • 2013
  • PURPOSES : The evaluation of the pavement condition of the asphalt concrete pavement of No. 2 runway of Inchon International Airport through PMS, a supporting system for making a decision of pavement, maintenance and repair, was made, and the proper time for repair according to the PCI reduction rate was suggested. METHODS : By comparing and analyzing the evaluation results of pavements built in 2009, 2010, 2011, PCI change in each facility (No. 2 runway, C parallel taxiway, connection taxiway) was calculated. By applying the calculated change to PCI deduction rate model, the pavement condition of the target sections was estimated, and then the necessary section and time for repair were chosen. RESULTS : After careful consideration of the time for pavement and maintenance, based on the result of PCI prediction, it was estimated that the southern takeoff and landing section of No. 2 runway was required to be repaired in 2012; connection taxiway in 2013; and C parallel taxiway in 2014; however, the section which is the main moving route of connection taxiway and C parallel taxiway was needed to be repaired in 2012. CONCLUSIONS : For maintenance and repair of airport pavements, the optimal alternative should be chosen by considering economics and operability, via examining the time for repair and the aspect of management all together on the basis of this study.

Performance Evaluation of Interlocking Block Pavement for Low Speed Highway (인터로킹 블록포장의 저속도로 적용성 평가)

  • Lin, Wuguang;Ryu, SungWoo;Lee, ByeongTae;Cho, Yoon-Ho
    • International Journal of Highway Engineering
    • /
    • v.16 no.2
    • /
    • pp.1-9
    • /
    • 2014
  • PURPOSES : This study aims to evaluate the performance of interlocking block pavement system for low speed highway. METHODS : Through on-site monitoring, environmental impact assessment of interlocking block pavement such as heat island reduction, traffic safety, noise pollution were evaluated as compared with asphalt pavement. Also the pavement condition and roughness were evaluated according to performance period. RESULTS : Surface temperature of interlocking block pavement was about 7 degree lower than asphalt pavement in midsummer. Compared to asphalt pavement, vehicle speed reduction effect of interlocking block pavement was about 2kph. For low speed driving, the noise pollution was measured at a similar level for both asphalt and interlocking block pavement. After 42month service period, the breakage of block was only 0.24% for the whole surveyed area. IRI of interlock block pavement was estimated within the range of 5~8m/km. CONCLUSIONS : Depending on the performance monitoring results such as heat island reduction, providing traffic safety and keeping a good pavement condition for a long service period, it assures that interlocking block pavement was applicable for low speed road.

The Effects of Slab Size on Pavement Life Cycle Cost

  • Parsons, Timothy A.;Hall, Jim W.Jr
    • International Journal of Highway Engineering
    • /
    • v.8 no.2 s.28
    • /
    • pp.49-54
    • /
    • 2006
  • The purpose of this study was to determine the effect of expansion joint spacing (slab size) on the life cycle costs of owning Portland Cement Concrete (PCC) airfield pavements. Previous research has shown that slab size has a statistically significant impact on pavement performance. A probabilistic life cycle cost analysis was performed to determine if the effect of slab size on pavement performance would affect the total cost of ownership of PCC pavements. Data from 48 Pavement Condition Index (PCI) inspections of military and civilian airfields were used to develop probability-of-distress-by-condition curves, which were then used to develop probabilistic cost-of-repair-by-condition curves. A present worth life cycle cost analysis was then performed for various slab sizes, using construction costs, rehabilitation costs, and maintenance costs. Maintenance costs were determined by assuming a condition deterioration rate appropriate for each slab size and applying the cost-by-condition curves. The probabilistic cost-of-repair-by-condition curves indicated that smaller slabs are more expensive to repair on a unit cost basis. Life cycle cost analysis showed that larger slabs have a higher total cost of ownership than smaller slabs due to a faster rate of deterioration.

  • PDF

Evaluation of Behavior of Jointed Concrete Pavement Considering Temperature Condition in a Tunnel by Finite Element Method (구조해석을 통한 터널내 줄눈 콘크리트 포장의 거동분석)

  • Ryu, Sung Woo;Park, JunYoung;Kim, HyungBae;Lee, Jaehoon;Cho, Yoon-Ho
    • International Journal of Highway Engineering
    • /
    • v.18 no.2
    • /
    • pp.19-27
    • /
    • 2016
  • PURPOSES: The behavior of a concrete pavement in a tunnel was investigated, based on temperature data obtained from the field and FEM analysis. METHODS: The concrete pavement in a tunnel was evaluated via two methods. First, temperature data was collected in air and inside the concrete pavement both outside and inside the tunnel. Second, FEM analysis was used to evaluate the stress condition associated with the slab thickness, joint spacing, dowel, and rock foundation, based on temperature data from the field. RESULTS : Temperature monitoring revealed that the temperature change in the tunnel was lower and more stable than that outside the tunnel. Furthermore, the temperature difference between the top and bottom of the slab was lower inside the tunnel than outside. FEM analysis showed that, in many cases, the stress in the concrete pavement in the tunnel was lower than that outside the tunnel. CONCLUSIONS : Temperature monitoring and the behavior of the concrete pavement in the tunnel revealed that, from an environmental point of view, the condition in the tunnel is advantageous to that outside the tunnel. The behavior in the tunnel was significantly less extreme, and therefore the concrete pavement in the tunnel could be designed more economically, than that outside the tunnel.

Development of Seocho Borough Pavement Condition Evaluation Model based on Seoul Metropolitan SPI (서울시도 SPI를 활용한 서초구 도로포장상태 평가모형 개발)

  • Lee, Sang-Yum;Park, Mi-Youn;Kim, Kyoon-Tai
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.11
    • /
    • pp.314-321
    • /
    • 2016
  • Adapting the maintenance criteria of Seoul City pavement is not applicable for borough pavement due to differences between the pavement of Seoul city and the borough, such as priority of maintenance, traffic volume, thickness of pavement, and pavement deterioration rate by distresses. To develop an efficient and reasonable evaluation method of the Seocho borough pavement condition within a limited budget, this study suggested the borough pavement condition evaluation model based on the PMS (Pavement Management System) of Seoul Metropolitan SPI (Seoul Pavement Index). The SPI was modified to predict the remaining life and determine the proper maintenance method for the pavement in Seocho borough. This was suggested to reflect the rate of the designed performance life and field performance life of pavement as well as the pavement condition at the stage of the completion of construction. Primary variables, such as crack, rutting and IRI in the final model affect the overall performance life due to their even composition. Therefore, the suggested model considering the lowered criteria, design performance factor, and construction factor can be used for the more efficient maintenance of Seocho borough pavement.

The Effect of the Exposed Aggregate Concrete Pavement on the Reducing Traffic Noise Emission

  • Moon, Han-Young;Ha, Sang-Wook
    • Journal of the Korea Concrete Institute
    • /
    • v.15 no.2
    • /
    • pp.352-359
    • /
    • 2003
  • Portland cement concrete (PCC) pavements are more durable and have superior surface friction compared to most dense-graded asphalt. However, data collected to date generally show PCC pavements to create more noise than asphaltic surfaces. Recent research has shown that some of the new concrete pavement textures are worthy of further examination. One of these, exposed aggregate surfaces, appear to provide better noise quality characteristics as well as good frictional characteristics and durability. In this paper, we considered the relationship between noise level and various textures of exposed aggregate concrete (EAC) pavement by tire impact noise measurement. As the results of that, it was suggested that optimum surface texture and manufacturing condition of EAC in order to reduce tire and pavement interaction noise. Conclusively, we would like to recommend optimum condition of EAC pavement at the respects of materials and treatment. Furthermore, Frequency spectrum as well as A-weighted noise level was also evaluated to analyze properties of noise between PCC and EAC.