• Title/Summary/Keyword: Park System Planning

Search Result 1,393, Processing Time 0.025 seconds

Design of a Multi-Agent System Architecture for Implementing CPFR (CPFR 구현을 위한 다중 에이전트 시스템 구조설계)

  • Kim, Chang-Ouk;Kim, Sun-II;Yoon, Jung-Wook;Park, Yun-Sun
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.30 no.1
    • /
    • pp.1-10
    • /
    • 2004
  • Advance in Internet technology has changed traditional production planning and control methods. In particular, collaborations between participants in supply chains are being increasingly addressed in industry for enhancing chain-wide productivity. A representative paradigm that emphasizes collaboration in production planning and control is CPFR(Collaborative Planning, Forecasting and Replenishment). In this paper, we present a multi-agent system architecture that supports the collaborations specified in CPFR. The multi-agent system architecture consists of event manager, data view agent, business rule agent, and collaboration agent. The collaboration agent systematically controls negotiation between supplier and buyer with the aid of collaboration protocol and blackboard. The multi-agent system has been implemented with EJB(Enterprise Java Beans).

Optimal Generation Planning Including Pumped-Storage Plant Based on Analytic Cost Function and Maximum Principle (해석적 비용함수와 최대원리리에 의한 양수운전을 포함하는 최적전원계획)

  • 박영문;이봉용
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.34 no.8
    • /
    • pp.308-316
    • /
    • 1985
  • This paper proposes an analytic tool for long-term generation expansion planning based on the maximum principle. Many research works have been performed in the field of generation expansion planning. But few works can be found with the maxinmum principle. A recently published one worked by professor Young Moon Park et al. shows remarkable improvements in modeling and computation. But this modeling allows only thermal units. This paper has extended Professor Park's model so that the optimal pumped-storage operation is taken into account. So the ability for practical application is enhanced. In addition, the analytic supply-shortage cost function is included. The maximum principle is solved by gradient search due to its simplicity. Every iteration is treated as if mathematical programming such that all controls from the initial to the terminal time are manipulated within the same plane. Proposed methodology is tested in a real scale power system and the simulation results are compared with other available package. Capability of proposed method is fully demonstrated. It is expected that the proposed method can be served as a powerful analytic tool for long-term generation expansion planning.

  • PDF

A Study of Automated Process Planning and Die Design for Multi Former-Bolt Products (다단포머-볼트류 공정 및 금형설계 자동화 시스템 개발)

  • Park, Chul-Woo;Kang, Jung-Hoon;Lee, Jun-Ho;Kim, Chul;Kim, Moon-Saeng;Choi, Jae-Chan
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.20 no.4
    • /
    • pp.29-38
    • /
    • 2003
  • This paper deals with an automated computer-aided process planning and die design system with which designer can determine operation sequences even after only a little experience in process planning and die design of multi former-bolt products by multi-stage former working. The approach is based on knowledge-based rules, and a process knowledge base consisting of design rules is built. Knowledge fur the system is formulated from plasticity theories, empirical results and the empirical knowledge of field experts. Programs for the system have been written in AutoLISP for AutoCAD with a personal computer. An attempt is made to link programs incorporating a number of expert design rules with the process variables obtained by commercial FEM softwares, DEFORM and ANSYS, to form a useful package. The system is composed of four main modules. The process planning and die design module considers several factors, such as the complexities of preform geometry, punch and die profiles, specifications of available multi former, and the availability of standard parts. It can provide a flexible process based on either the reduction in the number of forming sequences by combining the possible two processes in sequence, or the reduction of deviation of the distribution and the level of the required forming loads by controlling the forming ratios. The system uses 2D geometry recognition and is integrated with the technology of process planning, die design, and CAE analysis. The standardization of die parts for multi former-bolt products requiring a cold forging process is described. The system developed makes it possible to design and manufacture multi former-bolt products more efficiently.

A Study on Waste Management Method of Construction Project in Planning Stage (건설프로젝트 계획단계에서 폐기물 관리방안 연구)

  • Cho, sung;Cho, Yong;Park, Won-Ho;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.155-158
    • /
    • 2008
  • This paper shows construction management focused on waste management in construction project in planning stage Construction waste is given a great deal of weight on total waste. And it is issued in government policy. But it show the limit of problem.As a result of having referenced idea as describe above, this paper will be studied by this process. First, present condition of development waste, cases is researched in construction projects. Second, problems of development pattern and management system are investigated and checked in project cases. Third, maintenance and management method project are proposed by application of planning Stage.

  • PDF

An Investigation of Project Completion Time Estimation Method in PERT Network for Planning and Management in Large-Scale Systems (대규모 시스템의 모사와 관리를 위한 PERT네트워크 완료일자 추정기법에 관한 고찰)

  • Lee, Jae-Myung;Yi, Ho-Jae;Park, Mee-Jeong;Lee, Jeong-Jae
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2005.10a
    • /
    • pp.695-699
    • /
    • 2005
  • Propriety of PERT network for planning and management in large-scale systems was investigated. We also review the example of small and middle size system to compare the appropriateness of PERT analysis method. For comparing the appropriateness of PERT analysis method the calculation time, and the variances were estimated. Eventualy, we proposed the criteria of PERT analysis method for planning and management large-scale systems.

  • PDF

Development of the Spatial Scheduling System and Its Applications in Shipbuilding Industry (조선공업에서의 공간일정계획 시스템 개발 및 응용)

  • Chung, Kuy-Hoon;Baek, Tae-Hyun;Min, Sang-Gyu;Kim, Hyung-Shik;Park, Ju-Chull;Cho, Kyu-Kab;Park, Chang-Kyu
    • IE interfaces
    • /
    • v.14 no.4
    • /
    • pp.394-402
    • /
    • 2001
  • In this study, we deal a spatial scheduling system for the block painting process in the shipbuilding industry. In general, the spatial scheduling for the block painting process is a very complicated task. Because spatial allocation of each block in blasting and painting cells is considered simultaneously. Thus the spatial scheduling for the block painting process is the problem of planning and control of operation, which arises in shipyard. This system is developed for blocks to meet the delivery date given by the shipyard production planning system, to maximize space utilization of blasting and painting cells and to balance workload among working teams. And it has been tested using actual scheduling data from a shipyard and successfully applied in a paint shop in a shipbuilding company.

  • PDF

Development of Automatic Selection of Assembly Direction and Assembly Sequence Correction System (조립 방향 자동 판별 및 조립 순서 자동 수정 시스템 개발)

  • Park, Hong-Seok;Park, Jin-Woo
    • Korean Journal of Computational Design and Engineering
    • /
    • v.18 no.6
    • /
    • pp.417-427
    • /
    • 2013
  • Assembly direction is used in order to confirm the generated assembly sequences in an automatic assembly sequence planning system. Moreover, assembly sequence planners can ascertain the feasibility of a sequence during simulation with assembly direction based in a CAD environment. In other words, assembly direction is essential for sequence optimizing and automatic generation. Based on the importance of assembly direction, this paper proposes a method to select the best direction for the generated assembly sequence using disassembly simulation and geometrical common area between assembled parts. Simultaneously, this idea can be applied to verify the generated assembly sequence. In this paper, the automatic selection of assembly direction and sequence correction system is designed and implemented. The developed algorithms and the implemented system are verified based on case study in the CAD environment.

Kwangiu City Long Term Distribution Planning Process using the Land use Forecasting Method (토지용도에 따른 부하접촉을 이용한 광주시 장단기 최적화 배전계획)

  • Kang, Cheul-Won;Kim, Hyo-Sang;Park, Chang-Ho;Kim, Joon-Oh
    • Proceedings of the KIEE Conference
    • /
    • 2000.07a
    • /
    • pp.495-497
    • /
    • 2000
  • The KEPCO is developing the load forecasting sysetm using land use simulation method and distribution planning system. Distribution planning needs the data of presents loads, forecasted loads sub-statin, and distribution lines. Using the data, determine the sub-station and feeder lines according to the load forecasting data. This paper presents the method of formulation processfor the long term load forecasting and optimal distribution planning and optimal distribution planning. And describes the case study of long term distribution planning of Kwangju city accord to the newly applied method.

  • PDF

A Production Planning System for an Automobile Components Manufacturer with a Flow Process (흐름생산방식의 자동차 부품업체를 위한 생산계획시스템 개발)

  • Kim, Kap-Hwan;Park, Soon-O;Kim, Ki-Young;Ok, Choong-Suk
    • IE interfaces
    • /
    • v.11 no.2
    • /
    • pp.1-11
    • /
    • 1998
  • In this paper, a case study is introduced on the development on a production planning system for the efficient control of work-in-process material flows. A special attention has been given to the prevention of the shortage of the automobile-components at the auto-assembly lines and the dynamic adaptation of the production plan to the continuously changing environment. The expertise of the production planner is analyzed and transformed into the logic of the software developed.

  • PDF