• Title/Summary/Keyword: Parallel Stream

Search Result 138, Processing Time 0.018 seconds

A Study on the Atomizing Mechanism for the Swirl Nozzle (와권(渦卷) 노즐의 무화기구(霧化機構)에 관(關)한 연구(硏究))

  • Lee, Sang Woo;Sakai, Jun;Ishihara, Akira
    • Korean Journal of Agricultural Science
    • /
    • v.14 no.1
    • /
    • pp.81-97
    • /
    • 1987
  • Two nozzles with different size (Figure 2) were particularly designed to supply air through the swirl core into the central part of the liquid stream in the same parallel direction to produce a well-mixed air and water in the whirl chamber as spray liquid in bubble formation. Atomization was attempted to improve by using both the preliminary break-up process with less viscosity and less surface tension in the whirl chamber and the effects of increased frequency of the band of drops with the raised ambient air density in front of the nozzle orifice. The volumetric ratio between spray liquid and air on four levels was used to investigate the effects of air as a component of the mixture on atomization. The results of the experiment were summarized as follows; Droplet size became progressively finer as the operating pressure was increased in the range of $0.70kg/cm^2$ to $6.33kg/cm^2$, which was similar to the previous works. The new atomizing mechanism so-called 'air-center nozzle' gave a narrower range in droplet size distribution with smaller volumetric median diameter (VMD) than that of the existing spray system at a given pressure, which showed the possibility of improvement of atomization in a certain limit. The volumetric median diameter produced by the new atomizing mechanism was decreased from the central region toward the exterior edges across the spray pattern.

  • PDF

Application of Electrical and Small-Loop EM survey to the Identification of the Leachate at a Waste Landfill in Jeiu Island (제주도 쓰레기매립장 침출수 조사를 위한 전기 및 소형루프 전자탐사의 적용)

  • Song Sung-Ho;Yong Hwan-Ho;An Jung-Gi;Kim Gee-Pyo
    • Geophysics and Geophysical Exploration
    • /
    • v.6 no.3
    • /
    • pp.143-152
    • /
    • 2003
  • Among the various geophysical approaches to identify the leakage of leachate with conductivity variation, conventional electrical resistivity survey has been mainly used at waste landfill. We adopted small-loop electromagnetic (EM) survey using multi-frequencies in parallel with electrical resistivity survey to delineate the leakage of leachate through the shallow soil layer at a waste landfill in Jeju Island, and also with self-potential monitoring to detect the streaming potential produced by the movement of leachate. There were no evidences of leakage from waste landfill according to the results of the electrical resistivity survey and SP monitoring, and it was also true from the results of water quality analysis at stream around waste landfill periodically. On the other hand, the results of one-dimensional inversion of spatially-filtered small-loop EM survey data showed the anomalous zone of low resistivity with depth both around and inner waste landfill.

A Study on Motion Estimation Encoder Supporting Variable Block Size for H.264/AVC (H.264/AVC용 가변 블록 크기를 지원하는 움직임 추정 부호기의 연구)

  • Kim, Won-Sam;Sohn, Seung-Il
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.12 no.10
    • /
    • pp.1845-1852
    • /
    • 2008
  • The key elements of inter prediction are motion estimation(ME) and motion compensation(MC). Motion estimation is to find the optimum motion vectors, not only by using a distance criteria like the SAD, but also by taking into account the resulting number of 비트s in the 비트 stream. Motion compensation is compensate for movement of blocks of current frame. Inter-prediction Encoding is always the main bottleneck in high-quality streaming applications. Therefore, in real-time streaming applications, dedicated hardware for executing Inter-prediction is required. In this paper, we studied a motion estimator(ME) for H.264/AVC. The designed motion estimator is based on 2-D systolic array and it connects processing elements for fast SAD(Sum of Absolute Difference) calculation in parallel. By providing different path for the upper and lower lesion of each reference data and adjusting the input sequence, consecutive calculation for motion estimation is executed without pipeline stall. With data reuse technique, it reduces memory access, and there is no extra delay for finding optimal partitions and motion vectors. The motion estimator supports variable-block size and takes 328 cycles for macro-block calculation. The proposed architecture is local memory-free different from paper [6] using local memory. This motion estimation encoder can be applicable to real-time video processing.

On a High-Speed Implementation of LILI-128 Stream Cipher Using FPGA/VHDL (FPGA/VHDL을 이용한 LILI-128 암호의 고속화 구현에 관한 연구)

  • 이훈재;문상재
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.11 no.3
    • /
    • pp.23-32
    • /
    • 2001
  • Since the LILI-128 cipher is a clock-controlled keystream generator, the speed of the keystream data is degraded in a clock-synchronized hardware logic design. Basically, the clock-controlled $LFSR_d$ in the LILI-128 cipher requires a system clock that is 1 ~4 times higher. Therefore, if the same clock is selected, the system throughput of the data rate will be lowered. Accordingly, this paper proposes a 4-bit parallel $LFSR_d$, where each register bit includes four variable data routines for feed feedback of shifting within the $LFSR_d$ . Furthermore, the timing of the propose design is simulated using a $Max^+$plus II from the ALTERA Co., the logic circuit is implemented for an FPGA device (EPF10K20RC240-3), and the throughput stability is analyzed up to a late of 50 Mbps with a 50MHz system clock. (That is higher than the 73 late at 45 Mbps, plus the maximum delay routine in the proposed design was below 20ns.) Finally, we translate/simulate our FPGA/VHDL design to the Lucent ASIC device( LV160C, 0.13 $\mu\textrm{m}$ CMOS & 1.5v technology), and it could achieve a throughput of about 500 Mbps with a 0.13$\mu\textrm{m}$ semiconductor for the maximum path delay below 1.8ns.

Water Quality and Epilithic Diatom Community in the Lower Stream near the South Harbor System of Korean Peninsula (한반도 서남부 하천 하구역의 수질 및 부착돌말 군집 특성)

  • Kim, Ha-Kyung;Lee, Min-Hyuk;Kim, Yong-Jae;Won, Du-Hee;Hwang, Soon-Jin;Hwang, Su-Ok;Kim, Sang-Hoon;Kim, Baik-Ho
    • Korean Journal of Ecology and Environment
    • /
    • v.46 no.4
    • /
    • pp.551-560
    • /
    • 2013
  • Environmental factors and epilithic diatom communities in the lower streams near the harbor region of South Korean peninsula were examined during no monsoon period in May 2013. The sampling of water and epilithic diatoms was conducted at both streams, 19 regulated streams (RS) that there are one or several dams constructed in the river system, and 19 un-regulated streams (US) that there are no dams within the river. A cluster analysis based on the number of species and abundance of epilithic diatoms through the stations, divided into three groups such as groups I (mainly US), II (mixed with US and RS) and III (mainly RS), respectively. Group I showed that water quality is good and high diversity of diatom, while Group II and III was water quality is relatively poor, but not differed in biomass of diatom from Group I. In addition, Group II that had high conductivity, nitrogen and phosphorus, was the lowest in diatom diversity among them. Dominant species were Nitzschia palea (17%) and Navicula seminuloides (11%) in Group I, Nitzschia inconspicua (19%) and Navicula perminuta (9%) in Group II, and Nitzschia inconspicua (15%) and Nitzschia palea (14%) in Group III, respectively. These taxa were widely distributed in brackish water, and not closely related with specific water quality, like eutrophic water. However, the groups II and III belonged to RS, had not only little biomass, but bad water quality such as high concentrations of nutrient and chlorophyll-a. Therefore, to determine the effect of dam construction on the lower water ecosystem, the planktonic algae, which can occur algal bloom in the estuary, also was considered to be a parallel investigation.

Development of Strategies to Improve Water Quality of the Yeongsan River in Connection with Adaptation to Climate Change (기후변화의 적응과 연계한 영산강 수질개선대책 개발)

  • Yong Woon Lee;Won Mo Yang;Gwang Duck Song;Yong Uk Ryu;Hak Young Lee
    • Korean Journal of Ecology and Environment
    • /
    • v.56 no.3
    • /
    • pp.187-195
    • /
    • 2023
  • Almost all of the water from agricultural dams located to the upper of the Yeongsan river is supplied as irrigation water for farmland and thus is not discharged to the main stream of the river. Also, most of the irrigation water does not return to the river after use, adding to the lack of flow in the main stream. As a result, the water quality and aquatic health of the river have become the poorest among the four major rivers in Korea. Therefore, in this study, several strategies for water quality improvement of the river were developed considering pollution reduction and flow rate increase, and their effect analysis was performed using a water quality model. The results of this study showed that the target water quality of the Yeongsan river could be achieved if flow increase strategies (FISs) are intensively pursued in parallel with pollution reduction. The reason is because the water quality of the river has been steadily improved through pollution reduction but this method is now nearing the limit. In addition, rainfall-related FISs such as dam construction and water distribution adjustment may be less effective or lost if a megadrought continues due to climate change and then rainfall does not occur for a long time. Therefore, in the future, if the application conditions for the FISs are similar, the seawater desalination facility, which is independent of rainfall, should be considered as the priority installation target among the FISs. The reason is that seawater desalination facilities can replace the water supply function of dams, which are difficult to newly build in Korea, and can be useful as a climate change adaptation facility by preventing water-related disasters in the event of a long-term megadrought.

Environmental Geochemistry and Contamination Assessment of the Tohyun Mine Creek, Korea (토현광산 수계의 환경지구화학적 특성과 오염도 평가)

  • 이찬희;이현구;이종창;전서령
    • Economic and Environmental Geology
    • /
    • v.34 no.5
    • /
    • pp.471-483
    • /
    • 2001
  • The pH values of the mine and surface water from the Tohyun mine creek were higher compared with those of groundwater, and 2nd round samples in same sites were even alkaline. The stream and mine waters belong to the characteristics of (Ca+Mg)-(SO$_4$) and (Ca+Mg)-(HCO$_3$) types, and groundwaters have to the (Ca+Mg+Na+K)-(HCO$_3$+SO$_4$) type. As the 2nd samples. concentrations of mostly anions are increasing compared with the forder samples. However, the mostly cation concentrations are decreasing. The hydrogeochemistry indicate that water quality is different chemical characteristics and evolution trends. The range of $\delta$D and $\delta$$^{18}$ valutes (relative to SMOW) in the waters are shown in -62.2 to -70.1$\textperthousand$, and -8.1 to -9.4$\textperthousand$. The values are plowed parallel to $\delta$D=8$\delta$$^{18}$ O+ (6$\pm$4). The d values of groundwater show 2.4, which is lower than the surface (5.2) and mine (7.6) waters. Strontium concentra titans range from 0.025 to 11.844 mg/$\ell$ in all kinds of water samples, but the groundwater has the highest contents The $^{87}$ Sr/$^{86}$ Sr ratios (0.7115 to 0.7129) show more lightened to the groundwater. The $\delta$$^{18}$ O value, Ca and Sr contents are decreased with $^{87}$ Sr/$^{86}$ Sr increasing, because it is support to the altitude effects of the sampling sites rather than a water-rock interaction of environmental isotope. Using computer code of WATEQ4F, saturation indices of albite, Quartz, gibssite and gypsum are calculated to be soluble. The calcite and dolomite show super saturation state, however, clay mineral species are plotted boundary between undersaturation and supersaturation. In the Tohyun mine creek, reaction materials with ore wastes arid precipitation have influence upon increasing EC and TDS of the waters independent of pH. The SO$_4$ concentrations in the mine water is 181.845 mg/$\ell$. This is abruptly increase in surface water and then detected 249.727 mg/$\ell$ in the groundwater. As a results of the calculated sulfate mineral solubilities, the sulfate ions became saturation states an above 150 mg/$\ell$ concentrations.

  • PDF

ATM Cell Encipherment Method using Rijndael Algorithm in Physical Layer (Rijndael 알고리즘을 이용한 물리 계층 ATM 셀 보안 기법)

  • Im Sung-Yeal;Chung Ki-Dong
    • The KIPS Transactions:PartC
    • /
    • v.13C no.1 s.104
    • /
    • pp.83-94
    • /
    • 2006
  • This paper describes ATM cell encipherment method using Rijndael Algorithm adopted as an AES(Advanced Encryption Standard) by NIST in 2001. ISO 9160 describes the requirement of physical layer data processing in encryption/decryption. For the description of ATM cell encipherment method, we implemented ATM data encipherment equipment which satisfies the requirements of ISO 9160, and verified the encipherment/decipherment processing at ATM STM-1 rate(155.52Mbps). The DES algorithm can process data in the block size of 64 bits and its key length is 64 bits, but the Rijndael algorithm can process data in the block size of 128 bits and the key length of 128, 192, or 256 bits selectively. So it is more flexible in high bit rate data processing and stronger in encription strength than DES. For tile real time encryption of high bit rate data stream. Rijndael algorithm was implemented in FPGA in this experiment. The boundary of serial UNI cell was detected by the CRC method, and in the case of user data cell the payload of 48 octets (384 bits) is converted in parallel and transferred to 3 Rijndael encipherment module in the block size of 128 bits individually. After completion of encryption, the header stored in buffer is attached to the enciphered payload and retransmitted in the format of cell. At the receiving end, the boundary of ceil is detected by the CRC method and the payload type is decided. n the payload type is the user data cell, the payload of the cell is transferred to the 3-Rijndael decryption module in the block sire of 128 bits for decryption of data. And in the case of maintenance cell, the payload is extracted without decryption processing.