Concrete-Panel Retaining Wall anti-crack sleeve inserted (균열방지 슬리브가 매설된 패널식 옹벽)

  • Jang, Sung-Ho;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.5 no.3
    • /
    • pp.345-349
    • /
    • 2019
  • In Korea, the mountainous area occupies more than 70% of the whole country, cutting of earth slope that cuts a part of the ground surface is widely used when building infrastructures such as road, railroad, and industrial complex construction. In recent years, regulations on environmental damage have become more strict, and various methods have been developed and applied. Among them, Concrete-Panel Retaining Wall technique is actively applied. Concrete-Panel Retaining Wall is a method to resist horizontal earth pressure by forming a wall by attaching a precast retaining wall to the front of the support material and increasing the shear strength of the disk through reinforcement of the support material. Soil nailing, earth bolt, and ground anchor are used as support material. Among them, ground anchor is a more aggressive reinforcement type that introduces tensile load in advance to the steel wire, and a large concentrated load acts on the front panel. This concentrated load is a factor that creates cracks in the concrete panel and reduces the durability of the retaining wall itself. In this study, steel pipe sleeves and reinforcements were purchased at the anchorage of the panel to prevent cracks, and by applying bumpy shear keys to the end of the panel, the weakness of the individual behavior of the existing grout anchors was improved. The problem of degraded landscape by exposure to front concrete of retaining wall and protrusion of anchorage was solved by the production of natural stone patterns and the construction of sections that do not protrude the anchorage. In order to verify the effectiveness of anti-crack sleeves and reinforcements used in the null, indoor testing and three-dimensional numerical analysis have been performed, and the use of steel pipe sleeves and reinforcements has demonstrated the overall strength increase and crack suppression effect of panels.

Application for Environment-friendly Retaining Wall Method Composed with Permanent Ground Anchor and Vertical Precast Panel in Cutting Slope Area (영구앵커와 연직 프리캐스트패널을 사용한 절토사면 친환경옹벽공법의 적용사례)

  • Nam, Hong-Ki;Jung, Hong-Seop
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.87-96
    • /
    • 2010
  • PAP method is a combined measures which consist a anchored retaining wall method with permanent ground anchors and vertical precast concrete panels, step by step on the slope surface. And soil is back filled between slope and vertical precast panels. Therefore, this method is more effective than any other ground anchor reinforcing methods of slope stability, for example cross type concrete block ground anchor or buttress concrete block ground anchor method. Because of increasing effective anchor force and green tree planting.

  • PDF

Stability and Earth Pressure Distribution of Excavated Earth Retaining Wall by Centrifugal Model Tests (원심모형실험에 의한 굴착 흙막이벽의 안정 및 토압분포)

  • Kim, Y.C.;Lee, C.K.;Kim, H.J.;Ahn, K.K.;Lee, M.W.;Heo, Y.
    • Journal of the Korean Society of Safety
    • /
    • v.12 no.3
    • /
    • pp.139-146
    • /
    • 1997
  • In this study, centrifugal model tests were performed to investigate the behavior of excavated earth retaining wall with the depth of excavation and different types of wall(aluminum, steel panel). Jumunjin standard sand was used for foundation soil. The raining method was adopted to form the required relative density of the model ground. The lateral earth pressure measured from tests were compared with estimated active earth pressure by Rankine's theory. The test results have shown that the earth pressure acting on the retaining wall and the rotation displacement of the wall are influenced by the depth of excavation and the type of wall. It was found from the test results that the deformation of the wall increases with the depth of excavation.

  • PDF

A Case Study on the Discrete Segmental Retaining Wall in Highway Construction (분리형 보강토공법의 고속도로 적용사례)

  • 노한성;최영철
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.10a
    • /
    • pp.337-344
    • /
    • 2001
  • The application of mechanically stabilized earth wall(MSEW) with segmental front panel has been increasing in highway construction due to its cost-effectiveness. However, some failures during construction have been reported and many field engineers are reluctant to select this method for important structure. One of the main reasons may be that there is no moderate specification for design and construction of MSEW yet. This paper discussed the main results of analysis on a case of block-type segmental retaining wall in highway construction. Based on the results, some recommendations on design and construction method of MSEW are presented.

  • PDF

A Study on the Stability of Slopes Reinforced with Panel-Type Retaining Walls (대절토부 사면의 패널식 옹벽보강에 따른 안정성 검토)

  • Dong-wook Choi;Jun-o Park;Daehyeon Kim
    • Journal of the Korean Geosynthetics Society
    • /
    • v.23 no.2
    • /
    • pp.1-7
    • /
    • 2024
  • Various innovative technologies and methods are being applied to ensure the stability of steep rock slopes. However, there are design limitations concerning site ground conditions, leading to discrepancies between the designed and actual ground conditions during construction. In the case of the retaining wall in Yeosu, where the study area is located, although the construction of a 5-stage retaining wall is planned, at the current completion of the second stage, cracks on the upper part of the wall, settlement in the front of the wall, and seepage have been observed. After the completion of stages one and two, issues regarding cracks and settlement on the upper part of the wall and seepage in the front of the wall were discovered. Thus, there was a need to reevaluate the results of the existing stability assessment. It was confirmed that the issue was due to groundwater leakage, attributed to the lack of clear assessment of the colluvial soil layer during the initial design stage. Therefore, to conservatively reflect groundwater level conditions, a groundwater level contour was positioned at the top of the wall to conduct a slope stability assessment. The assessment results indicated that the safety factor during the rainy season exceeded the required value of 1.3, with a calculated safety factor of 1.31. However, during seismic events, the safety factor was determined to be 1.12, falling short of the required safety factor of 1.3. Therefore, it is suggested that the existing retaining walls constructed during stages one and two undergo reinforcement using methods such as micro-piles with grouting, and additional work should be carried out to ensure a clear assessment of the colluvial soil layer.

A Study on Stability and Economic feasibility according to Height on the MSE Wall with Pacing Panel (고속도로 도로부에 시공된 패널식 보강토 옹벽의 높이별 안전율과 경제성 검토)

  • Park, Min-Cheol
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.5
    • /
    • pp.54-63
    • /
    • 2018
  • In this study, the stability and economic feasibility of a MSE (Mechanically stability earth) wall with a pre-cast concrete pacing panel was investigated for a standard section of highway. Based on the design criteria, the MSE walls of the panel type were designed considering the load conditions of the highway, such as the dead load of the concrete pavement, traffic load, and impact load of the barrier. The length of the ribbed metal strip was arranged at 0.9H according to the height of the MSE walls. Because the length of the reinforcement was set to 0.9H according to the height of the MSE wall, the external stability governed by the shape of the reinforced soil was not affected by the height increase. The factor of safety (FOS) for the bearing capacity was decreased drastically due to the increase in self-weight according to the height of the MSE wall. As a result of examining the internal stability according to the cohesive gravity method, the FOS of pullout was increased and the FOS of fracture was decreased. As the height of the MSEW wall increases, the horizontal earth pressure acting as an active force and the vertical earth pressure acting as a resistance force are increased together, so that the FOS of the pullout is increased. Because the long-term allowable tensile force of the ribbed metal strip is constant, the FOS of the fracture is decreased by only an increase in the horizontal earth pressure according to the height. The panel type MSE wall was more economical than the block type at all heights. Compared to the concrete retaining wall, it has excellent economic efficiency at a height of 5.0 m or more.

Assessments of Creep Properties of Strip Type fiber Reinforcement (띠형 섬유보강재의 크리프 특성 평가)

  • 전한용;유중조;김홍택;김경모;김영윤
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.2
    • /
    • pp.279-289
    • /
    • 2003
  • Geosynthetic reinforced earth wall was introduced about 20 years ago and many structures have been constructed. Especially, segmental concrete panel facing and friction tie system are the most popular system in Korea, and this friction tie was composed of high tenacity PET filament and LDPE(Low Density Polyethylene) sheath. Due to the lack of direct-test results, design coefficients of friction tie (creep reduction factor) had been determined by quoting the previous and the foreign reference data. This is an unreasonable fact for the use of friction ties. In this study, the creep tests were performed to evaluate the creep behavior of friction tie, and the reduction factor of creep was calculated for the correct design of geosynthetic reinforced earth retaining walls. From the test results, finally it was found that the allowable creep strength of friction tie is 60% of Tult during service life, and creep reduction factor is 1.67 for each grade of friction ties.

A Study on Back Analysis Settlement Prediction of Soft Ground Using Numerical Analysis and Measurement Data (수치해석과 계측데이터를 이용한 연약지반의 역해석 침하 예측에 관한 연구)

  • Sangju Jeon;Hyeok Seo;Daehyeon Kim
    • Journal of the Korean Geosynthetics Society
    • /
    • v.23 no.2
    • /
    • pp.9-17
    • /
    • 2024
  • When constructing on soft ground, managing ground settlement and safety is crucial. However, there often exists a significant disparity between the actual behavior of the ground and the design plans. In this study, we aimed to compare and analyze the difference between the predicted settlement based on theoretical formulas and the measured settlement during construction, in order to predict settlement. For this purpose, we analyzed settlement data from 18 construction sites. The results indicated that the back analysis settlement values were similar to the measured settlement values, whereas the design settlement values were significantly higher compared to the measured settlement values. Specifically, the design settlement values were 1.2 to 1.4 times higher than those derived from back analysis using measured values. The RMSE analysis revealed a value of 0.6212m for the design settlement and 0.1697m for the back analysis settlement. The difference between the back analysis settlement and the measured settlement was more than 70% lower than the difference between the design settlement and the measured settlement. This indicates that the back analysis settlement values exhibit lower error rates compared to the design settlement values.