• Title/Summary/Keyword: Panel Retaining Wall

Search Result 18, Processing Time 0.035 seconds

Concrete-Panel Retaining Wall anti-crack sleeve inserted (균열방지 슬리브가 매설된 패널식 옹벽)

  • Jang, Sung-Ho;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.5 no.3
    • /
    • pp.345-349
    • /
    • 2019
  • In Korea, the mountainous area occupies more than 70% of the whole country, cutting of earth slope that cuts a part of the ground surface is widely used when building infrastructures such as road, railroad, and industrial complex construction. In recent years, regulations on environmental damage have become more strict, and various methods have been developed and applied. Among them, Concrete-Panel Retaining Wall technique is actively applied. Concrete-Panel Retaining Wall is a method to resist horizontal earth pressure by forming a wall by attaching a precast retaining wall to the front of the support material and increasing the shear strength of the disk through reinforcement of the support material. Soil nailing, earth bolt, and ground anchor are used as support material. Among them, ground anchor is a more aggressive reinforcement type that introduces tensile load in advance to the steel wire, and a large concentrated load acts on the front panel. This concentrated load is a factor that creates cracks in the concrete panel and reduces the durability of the retaining wall itself. In this study, steel pipe sleeves and reinforcements were purchased at the anchorage of the panel to prevent cracks, and by applying bumpy shear keys to the end of the panel, the weakness of the individual behavior of the existing grout anchors was improved. The problem of degraded landscape by exposure to front concrete of retaining wall and protrusion of anchorage was solved by the production of natural stone patterns and the construction of sections that do not protrude the anchorage. In order to verify the effectiveness of anti-crack sleeves and reinforcements used in the null, indoor testing and three-dimensional numerical analysis have been performed, and the use of steel pipe sleeves and reinforcements has demonstrated the overall strength increase and crack suppression effect of panels.

Evaluation of Field Application of Precast Concrete-panel Retaining Wall attached to In-Situ Ground Using Field Test and Numerical Analysis (현장시험 및 수치해석 분석을 통한 원지반 부착식 판넬옹벽의 현장 적용성 평가)

  • Kwon, Yong Kyu;Min, Kyoung-nam;Hwang, Young-cheol;Ban, Hoki;Lee, Minjae
    • Journal of the Korean Geotechnical Society
    • /
    • v.36 no.12
    • /
    • pp.99-106
    • /
    • 2020
  • Man-made slope is inevitable to make a new road, which may result in environmental problems as well as collapse of slope. To prevent these problems, various methods such as geogrid reinforced retaining wall, precast concrete-panel retaining wall, and so on, have been introduced and developed. Among these methods, this paper presents the evaluation of field application of precast concrete-panel retaining wall attached to in-situ ground (so called top-down) compared to the conventional construction method of precast concrete-panel retaining wall (so called bottom-up) through the field test and numerical analysis. As a result, the safety factor of both methods in final stage is similar, however, top-down method guarantees the slope stability during the construction compared to bottom-up method.

Evaluation of Drainage Capacity of Precast Concrete-panel Retaining Wall Attached to In-situ Ground Using Numerical Analysis (수치해석을 이용한 원지반 부착식 판넬옹벽의 투수성 평가)

  • Kwon, Youg Kyu;Lee, Jae Won;Hwang, Young-cheol;Ban, Hoki;Lee, Minjae
    • Journal of the Korean Geotechnical Society
    • /
    • v.37 no.3
    • /
    • pp.43-50
    • /
    • 2021
  • On the construction of new roads, the cut slope is inevitable and thus has been widely applied in the mountainous area. Particularly, the retaining wall with the precast concrete panel is often selected for its higher stability and mostly constructed in bottom-up method. However, the bottom-up method results in steeper slope as 1:0.05 before constructiong retaining wall and thus causes poor compaction at backfill which may induce instability during or after the construction. To overcome this problem, precast concrete panel retaining wall was attached in-situ ground (so called top-down). This paper presents the evaluation of drainage capacity of top-down method which has impermeable layer between panel and mortar being used to increase the ability of attachment of the precast concrete panel.

Application for Environment-friendly Retaining Wall Method Composed with Permanent Ground Anchor and Vertical Precast Panel in Cutting Slope Area (영구앵커와 연직 프리캐스트패널을 사용한 절토사면 친환경옹벽공법의 적용사례)

  • Nam, Hong-Ki;Jung, Hong-Seop
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.87-96
    • /
    • 2010
  • PAP method is a combined measures which consist a anchored retaining wall method with permanent ground anchors and vertical precast concrete panels, step by step on the slope surface. And soil is back filled between slope and vertical precast panels. Therefore, this method is more effective than any other ground anchor reinforcing methods of slope stability, for example cross type concrete block ground anchor or buttress concrete block ground anchor method. Because of increasing effective anchor force and green tree planting.

  • PDF

Stability and Earth Pressure Distribution of Excavated Earth Retaining Wall by Centrifugal Model Tests (원심모형실험에 의한 굴착 흙막이벽의 안정 및 토압분포)

  • Kim, Y.C.;Lee, C.K.;Kim, H.J.;Ahn, K.K.;Lee, M.W.;Heo, Y.
    • Journal of the Korean Society of Safety
    • /
    • v.12 no.3
    • /
    • pp.139-146
    • /
    • 1997
  • In this study, centrifugal model tests were performed to investigate the behavior of excavated earth retaining wall with the depth of excavation and different types of wall(aluminum, steel panel). Jumunjin standard sand was used for foundation soil. The raining method was adopted to form the required relative density of the model ground. The lateral earth pressure measured from tests were compared with estimated active earth pressure by Rankine's theory. The test results have shown that the earth pressure acting on the retaining wall and the rotation displacement of the wall are influenced by the depth of excavation and the type of wall. It was found from the test results that the deformation of the wall increases with the depth of excavation.

  • PDF

Field Application of a Precast Concrete-panel Retaining Wall Adhered to In-situ Ground (원지반 부착식 판넬옹벽의 현장 적용성 평가)

  • Min, Kyoung-Nam;Lee, Jae-Won;Lee, Jung-Gwan;Kang, In-Kyu;Ahn, Tae-Bong
    • The Journal of Engineering Geology
    • /
    • v.26 no.1
    • /
    • pp.51-61
    • /
    • 2016
  • New building methods are needed to aid increased inner-city redevelopment and industrial construction. A particular area of improvement is the efficient use of cut slopes, with the minimization of associated problems. A retaining wall of precast panels can resist the horizontal earth pressure by increasing the shear strength of the ground and reinforcing it through contact with the panels. Precast panels allow quick construction and avoid the problem of concrete deterioration. Other problems to be solved include the digging of borrow pits, the disposal of material cut from the slope, and degradation of the landscape caused by the exposed concrete retaining wall.This study suggest the methods of improvement of an existing precast panel wall system by changing the appearance of the panels to that of natural rock and improving the process of adhering the panel to a vertical slope. The panels were tested in the laboratory and in the field. The laboratory test verified their specific strength and behavior, and the field test assessed the panels' ground adherence at a vertical cutting. Reinforcement of the cutting slope was also measured and compared with the results of 3D numerical analysis. The results of laboratory test, identified that the shear bar increase the punching resistance of panel. And as a results of test construction, identified the construct ability and field applicability of the panel wall system adhered to in-situ ground. In addition to that, extended measurement and numerical analysis, identified the long-term stability of panel wall system adhered to in-situ ground.

A Study on the Stability of Slopes Reinforced with Panel-Type Retaining Walls (대절토부 사면의 패널식 옹벽보강에 따른 안정성 검토)

  • Dong-wook Choi;Jun-o Park;Daehyeon Kim
    • Journal of the Korean Geosynthetics Society
    • /
    • v.23 no.2
    • /
    • pp.1-7
    • /
    • 2024
  • Various innovative technologies and methods are being applied to ensure the stability of steep rock slopes. However, there are design limitations concerning site ground conditions, leading to discrepancies between the designed and actual ground conditions during construction. In the case of the retaining wall in Yeosu, where the study area is located, although the construction of a 5-stage retaining wall is planned, at the current completion of the second stage, cracks on the upper part of the wall, settlement in the front of the wall, and seepage have been observed. After the completion of stages one and two, issues regarding cracks and settlement on the upper part of the wall and seepage in the front of the wall were discovered. Thus, there was a need to reevaluate the results of the existing stability assessment. It was confirmed that the issue was due to groundwater leakage, attributed to the lack of clear assessment of the colluvial soil layer during the initial design stage. Therefore, to conservatively reflect groundwater level conditions, a groundwater level contour was positioned at the top of the wall to conduct a slope stability assessment. The assessment results indicated that the safety factor during the rainy season exceeded the required value of 1.3, with a calculated safety factor of 1.31. However, during seismic events, the safety factor was determined to be 1.12, falling short of the required safety factor of 1.3. Therefore, it is suggested that the existing retaining walls constructed during stages one and two undergo reinforcement using methods such as micro-piles with grouting, and additional work should be carried out to ensure a clear assessment of the colluvial soil layer.

A Case Study on the Discrete Segmental Retaining Wall in Highway Construction (분리형 보강토공법의 고속도로 적용사례)

  • 노한성;최영철
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.10a
    • /
    • pp.337-344
    • /
    • 2001
  • The application of mechanically stabilized earth wall(MSEW) with segmental front panel has been increasing in highway construction due to its cost-effectiveness. However, some failures during construction have been reported and many field engineers are reluctant to select this method for important structure. One of the main reasons may be that there is no moderate specification for design and construction of MSEW yet. This paper discussed the main results of analysis on a case of block-type segmental retaining wall in highway construction. Based on the results, some recommendations on design and construction method of MSEW are presented.

  • PDF

Behavior Characteristics of Precast Concrete-Panel Retaining Wall Adhered to In-situ Ground through Large Scaled Load Test (대형재하시험을 통한 원지반 부착식 패널옹벽의 거동특성)

  • Shin, Yuncheol;Min, Kyongnam;Kim, Jinhee;Ahn, Taebong
    • Journal of the Korean GEO-environmental Society
    • /
    • v.17 no.11
    • /
    • pp.45-53
    • /
    • 2016
  • A precast panel wall system resists against the horizontal earth pressure by increasing the shear strength of ground by reinforcement connected to the panel. The application of precast panel wall system is growing to lately minimize the earth work and environmental damage caused by large cut slope and to use the limited land effectively. The ground adhered panel wall system is the construction method that has the panel engraved with natural rock shape to improve the landscape. This system is developed to complete Top-Down method, and it is possible to have vertical cut, and to adhere to in-situ ground, improve construction ability by minimizing the ground relaxation and exclusion the trench and backfill process. In this study the field tests were performed to verify the construction ability about the vertical cut and complete Top-Down process and the construction behavior of ground adhered panel wall system was analyzed by large scale loading test and measurement results during loading test.

Numerical Approach to Evaluate the Behavior of Concrete Panel Considering Construction Method (수치해석을 이용한 시공방법에 따른 판넬식 옹벽의 거동 분석에 관한 연구)

  • Junhee, Kang;Hoki, Ban
    • Journal of the Korean GEO-environmental Society
    • /
    • v.23 no.12
    • /
    • pp.17-23
    • /
    • 2022
  • This paper analyze the precast panel retaining wall's safety factor changes based on the numerical analysis using PLAXIS 2D software. Numerical analysis conditions include construction method, nail and panel fixing method, backfill material compaction conditions, rainfall conditions. The classification according to the construction method of the precast panel retaining wall includes the top-down and bottom-up methods. The difference between the top-down and bottom-up methods is the presence or absence backfill material and the ground excavation method. The top-down method involves vertically excavating the ground and attaching the panel using mortar, but in the bottom-up method, the ground is vertically excavated and harden the backfill material. As a result of numerical analysis, the top-down method secured a higher safety factor in all cases except the rainfall conditions.