• Title/Summary/Keyword: PQ제도

Search Result 24, Processing Time 0.025 seconds

A Analytical Study on Governmental Regulation for the Promotion of Construction Technology Development (건설기술개발 촉진과 연계된 제도분석 연구 - PQ 기술개발평가항목과 특허출원추이와의 비교분석을 중심으로 -)

  • Kim, Jae-Wook;Kim, Sang-Bum
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.140-153
    • /
    • 2008
  • The recent stagnation of construction market draw more attention to construction technology development which is believed to be playing a important role in increasing the competitiveness of the construction industry. Thus, increasing pressures has been on the government playing a catalytic role of strengthen technology competitiveness. Hereupon, this study analyzed technology skill evaluation items of the Pre-Qualification system to facilitate construction technology development at the national level and tried to show the correlation between the PQ system and patent application through multilateral analysis of patent applications. Analysis results are intended to provide basic reference in decision-making process related to governmental regulation improvement especially on the PQ system. This research also attempted to draw implications to increase the use of technology related regulations such as patent & utility model based on PQ system analysis results. To do so, a comprehensive trend Analysis on the PQ system has been conducted from the view points of construction technology. Similar analysis has been done with the patent system & Utility model system. Based on Analysis result, implications of regulation improvements was outlined to promote construction technology development, due to eventually increase the competitiveness of Korean construction industry.

A Study on the Improvement scheme of Construction Technical Development facilitation (건설기술개발촉진 및 활용성 향상방안에 관한 연구)

  • Kim, Jae-Wook;Kim, Sang-Bum;Park, Jong-Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.751-755
    • /
    • 2007
  • Importance of rights acquisition regarding intellectual property rights is coming in the world to the front along this international, effort between enterprises is keen. A security of source technology is serious for domestic overseas market excavation of constructive enterprises, and national technology development effort for this is necessary. Domestic constructive technology development is trend continuously increasing every year, and be especially looking after PQ system introduction this. Grasped domestic problem of system and technology development state through comparative analyses regarding analysis regarding technology development state constructive of currently domestic enterprises and national technology development encouragement systems and bid system duty to this, and accomplishment did study for technology development promotion and utilization anger elevation plan presentation by an early foundation.

  • PDF

A Study on the Actual Condition of Electrical Construction Supervision and Countermeasure of It (전력시설물공사 감리제도의 현황과 실태분석 및 개선방안에 관한 연구)

  • Seo, Hwang-Hyeon
    • Proceedings of the KIEE Conference
    • /
    • 2008.09a
    • /
    • pp.15-17
    • /
    • 2008
  • 본 논문은 현행 전력기술 관리법에 의하여 시행되고 있는 전력시설물공사 감리제도의 제도개선에 관한 연구로서 연구자의 현장 실무경험과 감리제도의 일반사항, 감리업자와 감리원에 대한 사항, 감리업자 선정 및 입찰에 관한 사항을 조사하여 전력시설물공사 감리제도의 현황과 실태분석 및 개선방안을 제시한 내용으로 연구결과는 다음과 같다. 첫째, 법적 및 제도적 측면에서 시급히 개선될 사항이다. 정부는 1995년 12월 법률 제5,132호로 전력기술관리법을 제정하여 전력시설물에 대한 공사감리 업무를 별도 분리 발주하여 전문성을 높이도록 전기 분야 전문기술자에 의해 수행토록 하는 것을 골자로 하는 책임 감리제도를 도입하여 오늘에 이르고 있다. 그러나 공사 준골단계에서 전기사업법 제98조 2항에 의해 위탁업무를 하고 있는 전기 안전공사가 사용전 검사를 함으로서 책임 감리제도의 도입 취지를 무색케 한 정도로 심각한 국면에 접어들었다. 전력기술관리법이 제정되어 13년이 지난 오늘까지도 책임 감리제도가 성공적으로 정착되지 못한 근본적인 문제는 사용전 검사를 전기 안전공사에서 대행하고 있다는 것이다. 물론 그동안의 많은 노력으로 어느 정도의 개선은 있었지만 근본적인 문제가 해결되지 않고서는 전력시설물공사의 감리기술의 전문화를 기대하기 어려운 실정이다. 따라서 책임 감리계도의 성공적인 정착을 위해서는 전기사업법 제98조 2항에 의한 위탁 업무인 사용전 감사 제도를 감리업자에게 돌려줌으로서 책임과 권한을 실질적으로 부여하고 감리회사 자체의 기술력 및 기술자 확보와 기술개발에 필요한 운영자금 및 투자 확대를 유도해 나가야 하며, 무엇보다도 확실한 법적 제도적 뒤받침이 선행되어야 한다. 둘째, 제도적 측면에서 일반건축물은 사업주가 전력시설물공사 감리업자를 임의선정 및 수의계약에 의해 감리업자를 지정하고 해당 공사기간동안 전기 감리원을 투입토록 되어 있어 인건비에 미치지 못하는 저가수주와 다음계약을 위해 어쩔 수 없이 사업주에게 종속되는 경우가 많으며, 이로 인해 감리수행에 혼란이 야기되고 책임소재의 불분명 책임 감리원의 조정 및 통제기능이 약화되는 부작용이 나타나고 있다. 전력시설물공사의 감리는 전력시설물의 안전사고, 비효율 및 부실소지 둥을 방지하기 위해서 필수적이고 발주자 감리업자 시공업체에게 모두 도움을 주는 업무이며, 일정규모이상의 건축물은 자발적인 참여로 유도할 수 있도록 적격심사제도(PQ심사)도입이 적극 필요한 실정이다. 셋째, 운용측면에서 공동주택의 주택법에 의한 전력시설물공사 감리는 사업승인권자가 사업수행능력 평가기준(PQ 심사)에 따라 감리업자를 지정하고 해당 공사기간 동안에 전기 감리원을 투입토록 되어 있으나 평가기준이 세대수에 따라 정해져 있어 효율적, 기술적 측면에 미치지 못하는 경우가 많다. 수준 높은 감리를 수행하려면 그에 맞는 적정한 감리원의 투입이 필수적이다. 넷째, 운용 및 제도적 측면에서 공공발주 건축물(공동주택 포함)의 전력시설물공사는 사업수행능력 평가기준(PQ 심사)에 따라 감리업자를 지정하고 해당 공사기간 동안에 전기 감리원을 투입토록 되어 있으나 발주자 소속직원의 감리수행 근거에 의해 자체 감리를 함으로서 시장경쟁 및 민간경제 활성화의 제약, 부정부패 및 비효율 등 사회에 전반적으로 악영향을 끼쳐 하루 빨리 민간 감리업자에게로의 개선이 시급한 실정이다.

  • PDF

A Comparative Analysis on Safety Evaluation System in the PQ Process of Public Construction Projects - Focus on PQ process in Korea and Los Angeles, California, USA - (공공공사의 PQ 심사 시 안전평가체계 비교분석 - 한국과 미국 캘리포니아 주 LA지역의 PQ 제도를 중심으로 -)

  • Park, Heetaek;Oh, ChiDon;Park, Chansik;Choi, Jinwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.3-13
    • /
    • 2013
  • The converted accident rates that included in Pre-Qualification (PQ) are to evaluate the results of accidents which have occurred. Therefore, it is demanded the development of proactive evaluation contents to evaluate the safety management activities and efforts on construction companies. The purpose of this study is to provide basic data for the establishment of proactive evaluation contents at public construction project in Korea through the collected and analyzed the PQ documentation applied by public agencies in Los Angeles, USA. The results indicated that diverse reactive safety evaluations are implemented to examine accidents which occurred in past projects such as occupational health insurance, regulation violation. And also, when the accidents occurred, it is evaluated the proactive safety management actions such as safety education, accident prevention programs, and safety management plans are reflected on the evaluation. Thus, if proactive safety related evaluation contents are established and reflected in PQ examinations together with diverse existing reactive safety evaluations considering converted accident rates, not only the existing function of converted accident rates can be reinforced but also businesses' active safety management activities can be induced and decreases in the construction industry's accident rate can be expected.

The Problem Analysis and Improvement Plans to the Bidding System of Construction Works (건설공사 입 ${\cdot}$ 낙찰제도의 문제점 및 개선방안;대한주택공사의 발주공사를 중심으로)

  • Jeong, Jin-Pal;Park, Moon-Sun;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.704-709
    • /
    • 2007
  • The purpose of this study is to present both problems and improvement plans on the bidding system of the Korea National Housing Corporation, which orders apartment houses professionally. For data gathering, this study used data from electronic procurement system from 2001 to 2005. The research method of this study is to analyze the data categorized into four types: changes of ordering and contract price ration, the lowest-pricing bidding system, and permanent projects by grades. As a result of the analysis, the amount of ordering is biased in favor of particular level. Finally, this study present following improvement plans: 1) screening system and the lowest-pricing bidding system need to be supplemented, 2) the contract price ratio and the amount of ordering should be controlled, and 3) the improvement of PQ and the introduction of the list of Qualified companies by types need to be presented.

  • PDF

정부시설공사입찰제도 - 50억미만 전문공사 적격심사제도를 중심으로

  • Kim, Il
    • 월간 기계설비
    • /
    • no.4 s.189
    • /
    • pp.39-42
    • /
    • 2006
  • 최근 정부계약제도는 하루가 다르게 변해가고 있습니다. 행정자치부에서는 지방정부출범 10년 맞이하여 지방자치단체의 특수성과 성격을 반영한 「지방자치단체를 위한 계약에 관한 법률」을 제정하여 올해부터 본격적인 시행에 들어갔으며, 국가계약제도 역시 정부가 추진하는 건설산업 경쟁력 강화 및 선진화 사업과 맞물려 최저가낙찰제도 확대, PQ 및 적격심사 제도의 개편, 각종 계약관련 하위 규정 통폐합 등 계약 및 입 · 낙찰제도 전반에 걸친 개편작업이 추진되고 있습니다. 본지는 이러한 정부계약제도의 급격한 변화의 흐름과 발맞추어 평소 회원사들로부터 자주 질의를 받았던 내용을 중심으로 정부시설공사입찰실무에(전문공사 50억 미만 적격심사 중심) 대한 내용을 3회에 걸쳐 게재 할 예정이오니 업무에 많은 활용 있으시기 바랍니다.

  • PDF

정부시설공사입찰제도 ② - 50억미만 전문공사 적격심사제도를 중심으로 -

  • Kim, Il
    • 월간 기계설비
    • /
    • no.3 s.188
    • /
    • pp.52-61
    • /
    • 2006
  • 최근 정부계약제도는 하루가 다르게 변해가고 있습니다. 행정자치부에서는 지방정부출범 10년을 맞이하여 지방자치단체의 특수성과 성격을 반영한『지방자치단체를 위한 계약에 관한 법률』을 제정하여 올해부터 본격적인 시행에 들어갔으며, 국가계약제도 역시 정부가 추진하는 건설산업 경쟁력 강화 및 선진화 사업과 맞물려 최저가낙찰제도 확대, PQ 및 적격심사 제도의 개편, 각종 계약관련 하위 규정 통폐합 등 계약 및 입∙낙찰제도 전반에 걸친 개편작업이 추진되고 있습니다. 본지는 이러한 정부계약제도의 급격한 변화의 흐름과 발맞추어 평소 회원사들로부터 자주 질의를 받았던 내용을 중심으로 정부시설공사입찰실무에(전문공사 50억 미만 적격심사 중심) 대한 내용을 3회에 걸쳐 게재 할 예정이오니 업무에 많은 활용 있으시기 바랍니다.

  • PDF

A Study on Improvement of Order System for Survey Service (측량용역 발주제도 개선에 관한 연구)

  • Park, Tai-Sik;Han, Soung-Man
    • Proceedings of the Korean Association of Geographic Inforamtion Studies Conference
    • /
    • 2008.10a
    • /
    • pp.236-242
    • /
    • 2008
  • 설계용역과 통합하여 발주되는 측량용역의 입찰 제도를 보면 계획기관에서 설계예산서를 작성하여 해당 부처 분임경리관을 경유하여 공개경쟁입찰 또는 입찰참가자격제도(PQ) 등으로 발주하게 된다. 이 과정에서 측량용역과 설계용역을 분리하지 않고 측량용역 비를 설계용역비에 통합예산으로 발주 처리하고 있어 측량회사는 설계용역사로부터 불법으로 하도급 받고 있다. 설계용역회사는 엔지니어링등록과 측량업(공공측량)을 동시에 등록하여 용역수주를 하므로 기술력이 부족한 측량용역을 당연히 저가하도급으로 처리하는 커다란 모순이 발생하고 있다. 따라서 저가하도급으로 인한 측량성과의 부실은 건설공사의 부실시공으로 이어져 커다란 공사비손실과 안전 및 유지관리에 큰 문제점을 야기하고 있다. 이와 같은 문제점을 해결하기 위하여 본 연구에서는 측량용역 등록업체의 현황 및 현행 발주제도 방법 등의 분석을 통하여 발주제도의 개선방안을 제안하고자 한다.

  • PDF