• Title/Summary/Keyword: PPV 공법

Search Result 7, Processing Time 0.017 seconds

An Empirical Study on the Improvement of In Situ Soil Remediation Using Plasma Blasting, Pneumatic Fracturing and Vacuum Suction (플라즈마 블라스팅, 공압파쇄, 진공추출이 활용된 지중 토양정화공법의 정화 개선 효과에 대한 실증연구)

  • Jae-Yong Song;Geun-Chun Lee;Cha-Won Kang;Eun-Sup Kim;Hyun-Shic Jang;Bo-An Jang;Yu-Chul Park
    • The Journal of Engineering Geology
    • /
    • v.33 no.1
    • /
    • pp.85-103
    • /
    • 2023
  • The in-situ remediation of a solidified stratum containing a large amount of fine-texture material like clay or organic matter in contaminated soil faces limitations such as increased remediation cost resulting from decreased purification efficiency. Even if the soil conditions are good, remediation generally requires a long time to complete because of non-uniform soil properties and low permeability. This study assessed the remediation effect and evaluated the field applicability of a methodology that combines pneumatic fracturing, vacuum extraction, and plasma blasting (the PPV method) to improve the limitations facing existing underground remediation methods. For comparison, underground remediation was performed over 80 days using the experimental PPV method and chemical oxidation (the control method). The control group showed no decrease in the degree of contamination due to the poor delivery of the soil remediation agent, whereas the PPV method clearly reduced the degree of contamination during the remediation period. Remediation effect, as assessed by the reduction of the highest TPH (Total Petroleum Hydrocarbons) concentration by distance from the injection well, was uncleared in the control group, whereas the PPV method showed a remediation effect of 62.6% within a 1 m radius of the injection well radius, 90.1% within 1.1~2.0 m, and 92.1% within 2.1~3.0 m. When evaluating the remediation efficiency by considering the average rate of TPH concentration reduction by distance from the injection well, the control group was not clear; in contrast, the PPV method showed 53.6% remediation effect within 1 m of the injection well, 82.4% within 1.1~2.0 m, and 68.7% within 2.1~3.0 m. Both ways of considering purification efficiency (based on changes in TPH maximum and average contamination concentration) found the PPV method to increase the remediation effect by 149.0~184.8% compared with the control group; its average increase in remediation effect was ~167%. The time taken to reduce contamination by 80% of the initial concentration was evaluated by deriving a correlation equation through analysis of the TPH concentration: the PPV method could reduce the purification time by 184.4% compared with chemical oxidation. However, the present evaluation of a single site cannot be equally applied to all strata, so additional research is necessary to explore more clearly the proposed method's effect.

A Study on the Effect of Improving Permeability by Injecting a Soil Remediation Agent in the In-situ Remediation Method Using Plasma Blasting, Pneumatic Fracturing, and Vacuum Suction Method (플라즈마 블라스팅, 공압파쇄, 진공추출이 활용된 지중 토양정화공법의 정화제 주입에 따른 투수성 개선 연구)

  • Geun-Chun Lee;Jae-Yong Song;Cha-Won Kang;Hyun-Shic Jang;Bo-An Jang;Yu-Chul Park
    • The Journal of Engineering Geology
    • /
    • v.33 no.3
    • /
    • pp.371-388
    • /
    • 2023
  • A stratum with a complex composition and a distributed low-permeability soil layer is difficult to remediate quickly because the soil remediation does not proceed easily. For efficient purification, the permeability should be improved and the soil remediation agent (H2O2) should be injected into the contaminated section to make sufficient contact with the TPH (Total petroleum hydrocarbons). This study analyzed a method for crack formation and effective delivery of the soil remediation agent based on pneumatic fracturing, plasma blasting, and vacuum suction (the PPV method) and compared its improvement effect relative to chemical oxidation. A demonstration test confirmed the effective delivery of the soil remediation agent to a site contaminated with TPH. The injection amount and injection time were monitored to calculate the delivery characteristics and the range of influence, and electrical resistivity surveying qualitatively confirmed changes in the underground environment. Permeability tests also evaluated and compared the permeability changes for each method. The amount of soil remediation agent injected was increased by about 4.74 to 7.48 times in the experimental group (PPV method) compared with the control group (chemical oxidation); the PPV method allowed injection rates per unit time (L/min) about 5.00 to 7.54 times quicker than the control method. Electrical resistivity measurements assessed that in the PPV method, the diffusion of H2O22 and other fluids to the surface soil layer reduced the low resistivity change ratio: the horizontal change ratio between the injection well and the extraction well decreased the resistivity by about 1.12 to 2.38 times. Quantitative evaluation of hydraulic conductivity at the end of the test found that the control group had 21.1% of the original hydraulic conductivity and the experimental group retained 81.3% of the initial value, close to the initial permeability coefficient. Calculated radii of influence based on the survey results showed that the results of the PPV method were improved by 220% on average compared with those of the control group.

A Case Study on Explosives Demolition of Central Library (중앙 도서관 발파해체 시공사례)

  • Park, Keun-Soon;Kim, Sang-Hoon
    • Explosives and Blasting
    • /
    • v.26 no.2
    • /
    • pp.77-91
    • /
    • 2008
  • According as demand for superannuated building increases recently, much researches about demolition method of construction are going on. This case study executed to center library building located in Dankook University. Explosives demolition method applied Progressive Collapse. Explosives demolition main blasting floors are 2, 4floor, assistance blasting floor is 1 floor. In the nearest distance (150 m), Vibration measurement result were 0.0302 cm/sec (PPV). Change was not in measurement value is crack gauge which install beforehand.

Influence of Delay Time on the Ground Vibration (발파공간 지연시차가 지반진동에 미치는 영향)

  • Kim, Ji-Soo;Choi, Tae-Hong;Lee, Chang-Won
    • Explosives and Blasting
    • /
    • v.32 no.2
    • /
    • pp.1-8
    • /
    • 2014
  • In this study, 16 test blastings had been carried out with different spacings, burdens, drilling lengths, and charges per delay for investigating the characteristics of ground vibration propagation, which depends on the delay time. From the tests, it was possible to derive a ground vibration equation. Using the equation, the characteristics of ground vibration could be investigated by analyzing the nomogram and predicting the Peak Particle Velocity (PPV), which are influenced by the delay time and the priming location. The trend of ground vibration change depending on the delay time was analyzed for the standards charges of 0.5, 1.6, 5, and 15 kg, which were suggested in "Blasting design and construction guidelines to road construction" by the Ministry of Land, Infrastructure and Transport. From the study, it would be possible to suggest a favorable vibration control method, which depends on the charge.

Influence of Inner-hole Priming Location on Ground Vibration (발파공내 기폭위치가 지반진동에 미치는 영향)

  • Kim, Jae-Woong;Kang, Choo-Won;Ko, Chin-Surk
    • Explosives and Blasting
    • /
    • v.30 no.1
    • /
    • pp.29-36
    • /
    • 2012
  • In this study, the influence of priming location inside a blast hole on the ground vibration has been studied. In most of the previous studies dealing with the ground vibration, the effect of priming location in a blast hole was usually considered in a limited way. Thus, it seems that the results of the studies can be applicable only to the relevant sites. Considering the fact that the mechanism of ground vibration caused by blasting is quite complex, the priming location can have a considerable effect on the ground vibration in certain situations and be an important parameter in a blasting design. To identify the characteristics of the wave propagation according to priming locations, total 72 test blasts were carried out with different spacing, burden, drilling length, and charge, and prediction equations were derived. The characteristics of ground vibration, which was changed according to the priming location, was analyzed by using the nomogram of peak particle velocity (PPV) record. Attenuation relations, which were also dependent on the priming location, were analyzed. In this case, four different amounts of charge, that is, 0.5, 1.6, 5, and 15 kg, were used for the test. This criterion of charge amount is specified in the "Blasting design and construction guidelines to road construction" by the Ministry of Land, Transport and Maritime Affairs of Korea.

Influence of Delay Time and Priming Location on the Blast-Induced Ground Vibration (발파공 사이의 지연시차와 기폭위치가 지반진동에 미치는 영향)

  • Kang, Choo Won;Ryu, Bok Hyun;Choi, Tae Hong
    • Tunnel and Underground Space
    • /
    • v.24 no.1
    • /
    • pp.97-109
    • /
    • 2014
  • In order to identify the characteristics of the propagation depending on delay time (20, 25 ms) and priming location (top priming, middle priming, bottom priming), test blasts were carried out a total of 4 times using different spacing, burden, drilling length, charge per delay and was derived the formula to predict blast vibration. This study investigated the characteristics of vibration by analysis of the nomogram and prediction of Peak Particle Velocity (PPV) from delay time and priming location by the formula to predict ground vibration. And it analyzed the trends of vibration increase by standards charge 0.5, 1.6, 5, 15 kg. Standards charge is "Blasting design and construction guidelines to road construction" by the Ministry of Land, Infrastructure and Transport. Depending on the charge in favor of vibration control method is proposed. Thus, when the design was to be used as a variable.

Establishment of a Safe Blasting Guideline for Pit Slopes in Pasir Coal Mine (파시르탄광의 사면안전을 위한 발파지침 수립 연구)

  • Choi, Byung-Hee;Ryu, Chang-Ha;SunWoo, Coon;Jung, Yong-Bok
    • Tunnel and Underground Space
    • /
    • v.18 no.6
    • /
    • pp.418-426
    • /
    • 2008
  • A surface blasting method with a single tree face is currently used in Pasir Coal Mine in Indonesia. The single free face is usually the ground surface. This kind of blasting method is easy to use but inevitably causes enormous ground vibrations, which, in turn, can affect the stability of the slopes comprising the various boundaries of the open pit mine. In this regard, we decided to make a specific blasting guideline for the control of found vibrations to ensure the safety of the pit slopes and waste dumps of the mine. Firstly, we derived a prediction equation for the ground vibration levels that could be occurred during blasting in the pits. Then, we set the allowable levels of ground vibrations for the pit slopes and waste dumps as peak particle velocities of 120mm/s and 60mm/s, respectively. From the prediction equation and allowable levels, safe scaled distances were established for field use. The blast design equations for the pit slopes and waste dumps were $D_s{\geq}5\;and\;D_S{\geq}10$ respectively. We also provide several standard blasting patterns for the hole depths of $3.3{sim}8.8m$.