• Title/Summary/Keyword: PMIS

Search Result 97, Processing Time 0.028 seconds

The Project Management Information System for the Work Efficiency Improvement (업무 효율 향상을 위한 사업관리정보시스템)

  • Ryu, Jee-Woong;Song, Jong-Cheol;Moon, Byung-Joo;Jung, Hoe-Kyung
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.18 no.1
    • /
    • pp.18-24
    • /
    • 2014
  • For successful projects, Project Management Information System(PMIS) using the formal systematic processes is necessary. Because the existing PMIS focuses on low-level project management, the life-cycle administration of the projects is required. In this dissertation, I describe not only the processes for managing a project with the top-down approach(a hierarchical goal setting of the project outcome), but also PMIS which can control whole processes of R&D projects. The PMIS described in this dissertation can reduce the workload of project management by providing user-adaptive environments and linking with related systems, so can be helpful to enhance the efficiency of the project management. And, it is expected that these processes can be the standard project management processes which are adaptive to various types of projects.

A Study on the PIMS and 3D Simulation Application of the Construction Field (건설공사 현장에서의 PMIS와 3D Simulation 적용에 관한 연구)

  • Tak, Seung-Won;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.967-970
    • /
    • 2007
  • If is become complicated and jumbo a construction project. therefore, is increased complication the management by enormous information. In addition, According IT technology develops, it is the course taking in IT technology for Construction project and information of construction technology in an object positively, It introduces a IT technique in construction project get out of personal experiences and knowledge that the expert and information joint ownership and collection and accumulation gets possible to advantage managed to advantage of Construction project. Also The information joint ownership and project progress situation grasp of construction project participation wild for being smooth, it is become accomplished, This research introduces the necessity and meaning of the PMIS or similar solution which is information-oriented structure and a information system of Construction industry of present. It applies the PMIS and 3D Simulation System from site and analyzes to expectative effect of information system construction

  • PDF

A Successful Example of the PMIS to Dongnam Distribution Complex Project using TPMS(Total Project Management System) of the GS E&C (GS건설 TPMS를 통한 동남권유통단지 이주전문상가 현장 PMIS 성공사례)

  • Lee, Heung-Won;Park, Chan-Jeong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.129-134
    • /
    • 2007
  • In 1996, GS E&C became the first in the industry to adopt a Project Management System using EVM(Earned Value Management) to link schedule with profit/loss. In 2006, the TPMS(Total Project Management System) was completed by adding the concept of Lean Construction and JIT(Just In Time) to the Project Management System. This was done with the purpose of reducing waste and creating optimal work processes. This has been implemented on all sites and has enabled drastic increase of productivity. The portal provides customized information to the client, inspector and subcontractor personnel. Since various parties are receiving information that suits their requirements and is easy to use, usage has increased and since they are on the same platform, quick decisions and information sharing is possible. The purpose of the PMIS's success model in construction projects, this paper tests and proves the TPMS's efficiency and productivity to Dongnam Distribution Complex project.

  • PDF

Assessing the Construct Validity of PMIS Effectiveness Measurement - Focusing the Administration DB Construction Projects - (공공정보시스템 효과성 측정지표의 타당성 검증에 관한 연구 - 행정정보DB구축사업을 중심으로 -)

  • Kang, Dong-Seok;Yoo, Si-Hyeong
    • The KIPS Transactions:PartD
    • /
    • v.16D no.3
    • /
    • pp.417-422
    • /
    • 2009
  • It is important to verify the validity of indicators assessing PMIS(Public Management Information System) effectiveness in academic research as well as practical affairs. As people invest in the field of Information Technology(IT) or IT system, private corporations are interested in investment in IT and it's business value. Moreover, the need of evaluating effectiveness on the investment in IT with the limited national budget are on the increase in public sector. Therefore, it is necessary to define the construct of PMIS(Public Management Information System) effectiveness so that we systematically compare and measure performance of public informatization project processed by each public organizations. It needs to develop indicators and verify the construct validity of them. we verified the construct validity of indicators assessing PMIS(Public Management Information System) effectiveness on the Administration DB Construction Projects.

Assessment of Requirements for Successful Mobile Project Management Information Systems

  • Lee, Ung-Kyun;Jeong, Hyung Seok David;Woldesenbet, Asregedew
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.1
    • /
    • pp.45-53
    • /
    • 2014
  • The objective of this study is to assess the requirements of tablet PC-based PMIS applications designed for use on construction sites to determine whether these new programs can play a significant role in increasing the efficiency of a project. In this research, the current market conditions of PMIS running on a tablet PC were analyzed. In addition, two industry surveys were conducted. A research team interviewed some industry experts and identified fourteen useful and desirable functions that can be incorporated into tablet PC-based applications and project management tools. Through a questionnaire survey, the most effective functions for the tablet PC-based PMIS were identified. The three top-rated functions among those suggested were Contact Information for Job-Related Personnel; Receive and Respond to Submittals, RFIs, and Notices; and Problem Solving for Design and Engineering Issues. The results of this research are expected to provide helpful information for mobile application developers and members of other interested groups in the construction industry.

The Design and Implementation of Project Management Information System based on 4CM (4CM기반의 건설사업관리 시스템 개발 및 구현)

  • Choi, Sung Youn;Kim, Jae Soo
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.7 no.2
    • /
    • pp.101-113
    • /
    • 2011
  • As information and communication technology advances driving the rapid evolution of e-commerce and e-business becomes on effective marketing means for both business and institutions, the industry deals with these changes and has a profound, positive impact on production and operations management. But the construction industry falls behind compared with other industries in productivity, informationalization, automatization and globalization. Especially even though the informationalization is inevitable in any developing society, a number of construction industries can hardly cope with it properly. As the construction industry gets informationalized and advanced, the introduction of PMIS (Project Management Information System) is making progress actively for the effective construction project control and productivity improvement in construction. With the government officials' political promotion and the rising desire for construction informationalization of enterprises, many are attempting to develop integrated systems or to replace a previous system with a more advanced alternative. Construction Industry, however, has the peculiar properties that the period for the completion of construction is limited and on top of that, most of its data processing systems are seen as being an early stage in the design of management information systems. As a result, there are extremely few applications in the construction industry. In this paper, we propose the PMIS system based on new model 4CM that improves on previous models.

A Scheme for discriminating Construction IETM from existing systems (건설분야 전자매뉴얼(IETM) 특성화 방안)

  • Jeong, Jin-Wook;Park, Moon-Seo;Lee, Hyun-Su;Ji, Se-Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.698-701
    • /
    • 2008
  • IETM(Interactive Electronic Technical Manual) has been introduced to construction industry recently, It is regarded as a useful tool for handling the data, procedures of the construction, but it can be similar to existing If-based systems, the PMIS (Project Management Information System) and the KMS(Knowledge Management System), without characterizing. This research is intended to investigate ITEM's basic concept, and to present the scheme discriminating Construction IETM from existing systems.

  • PDF

BIM Based Automated Planning and Operation System for Earthwork Equipment (BIM 기반 토공 장비 계획 및 운영 자동화 시스템)

  • Kim, Jeong-Hwan;Jang, Jun-Hyun;Min, Ji-Hong;Seo, Jong-Won
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.375-378
    • /
    • 2011
  • 건설공사에서 토공사가 차지하는 비중은 타공종에 비하여 높다. 즉 건설공사의 생산성을 향상시키기 위하여 토공사를 중점적으로 관리하는 일은 매우 중요하다고 할 수 있다. 그러나 현재의 토공 시스템은 굴삭 조종자와 현장 계획 관리자의 경험적 지식에만 의지하여 토공 계획을 수립하고 있는 실정이며, 또한 노동 집약적 토공작업의 한계를 벗어나지 못하는 현실로 인하여 토공사를 관리함에 어려움이 있다. 이러한 당면 과제를 극복하고자 BIM 기반의 토공 시스템에 대하여 소개하고자 한다. 본 논문에서는 굴삭 장비와 연계하는 토공 계획과 운영 자동화 시스템에 대하여 주로 다루게 된다. 굴삭 작업 계획 생성 시스템, 장비 조종 인터페이스, 웹 기반 Project Management Information System(PMIS)이 개발되는 과정에서 적용된 BIM 요소기술에 대하여 살펴본다.

  • PDF

Construction management integrated system based on BIM (BIM 기반의 통합 공사관리 시스템)

  • Kim, Sung-Hoon;Sun, Oh-Young;Park, Young-Ho;Lee, Sang-Ho
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.243-246
    • /
    • 2011
  • 본 논문에서는 최근에 개발되어 지하철 919공구에 적용된 BIM 기반 통합 공사관리 시스템의 구축방법과 적용성에 대해 검토하였다. 최근 대형 국책사업이 발주, 시공되면서 효율적인 공사관리를 위한 PMIS 도입이 보다 활발해지고 있는 가운데, 기존의 텍스트와 그래프 위주에서 BIM(Building Information Modeling) 기법의 하나인 4D, 5D 시스템을 이용한 다양한 시도가 되고 있다. 한편, BIM은 건설 전 생애주기에 걸쳐 활용되어야 그 도입목적을 극대화할수 있으나, 현 단계에서는 계획 및 설계단계에만 초점이 맞춰져 있어 실제 공사중에는 그 활용도가 상당히 낮은 수준이었다. BIM 기반의 통합 공사관리 시스템은 공사중, 현장과 본사를 비롯해 발주처와 감리단 등 다수의 공사 주체들이 계획, 설계시 구축된 BIM을 보다 효과적으로 사용하도록 함으로써, BIM의 공사중 활용성을 높일 뿐 아니라 유지관리 단계까지 확장하여 이용될 수 있다. 본 논문에서는 BIM 기반 통합 공사관리 시스템을 구축하기 위한 절차를 살펴보고, 최종 구축된 통합시스템의 적용성 분석후 활용방안을 제시하였다.

  • PDF