A Study on the Direction for Developing the Korean PDRI(Project Definition Rating Index) (한국형 PDRI(Project Definition Rating Index)기법 개발 방향)

  • Hong, Sim-Hee;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.168-169
    • /
    • 2016
  • Risk management at an early stage of projects is known as an effective method expected various benefits. The PDRI(Project Definition Rating Index) by the CII(Construction Industry Institute) is defined project scope for reducing risks. In addition, the PDRI is one of the verified methods for achieving benefits by a risk management. The literature review in Korea about risk management is all about focusing on construction works and the construction phase. Thus, we need to extend the perspective of a project management such as the PDRI. To develop the Korean PDRI, However, we have to consider Korean situations. Therefore, in this study, we analyze some previous studies of PDRI' indexes and its using methods, and suggest the new direction for using PDRI in Korea. This method will enable to improve the scoring method of a project management with PDRI in Korea.

  • PDF

DEVELOPMENT OF A FRONT END PLANNING TOOL FOR SUSTAINABILITY

  • Sang-Hoon Lee;Spencer Howard;Lingguang Song;Kyungrai Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.506-513
    • /
    • 2009
  • The Construction Industry Institute (CII) developed the Project Definition Rating Index (PDRI), as a part of their Front End Planning best practices, which helps project managers assess and measure project scope definition risk elements. U.S. Green Building Council are seeing the benefits of sustainable building and Leadership in Energy and Environmental Design certification by positively impacting life cycle costs, building marketability, and organizational productivity. However, there have been no efforts to integrate these two planning tools in construction industry. By applying a supplemental tool which combines the PDRI with the LEED rating system, construction industry can develop and implement a tailored instrument that leads to total project success in sustainability. The objective of this research is to assemble a new front end planning mechanism for green buildings by incorporating the current PDRI and LEED systems.

  • PDF

PROGRAMMATIC AND PROJECT-LEVEL RISKS: ESTABLISHING A RISK MANAGEMENT PROCESS FOR MIDDLE EAST PLANT PROJECTS

  • G. Edward Gibson Jr.;John Walewski;SangBum Kim;Clayton Ingam;Hamid Hajian
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1000-1014
    • /
    • 2009
  • Research sponsored by the Korean Government investigated the establishment of a risk management process by Korean contractors involved with plant projects in the Middle East. This research effort builds upon the work completed by the Construction Industry Institute (CII), called the International Project Risk Assessment (IPRA) tool and method, and also explored how CII's Project Definition Rating Index (PDRI) could be incorporated to improve project planning by addressing risks and scope development issues. Specific findings and recommendations were developed including the creation of the Contractor Critical Areas of Concern (CCAC) risk screening tool for Korean contractors pursuing Middle East oil and gas projects.

  • PDF

Extraction and Analysis of Construction Phase Risk Factors in High-rise Construction Project (초고층 건설공사 시공단계 리스크 요인 도출 및 분석)

  • Kim, Sooyong;Kim, Sunghyun;Yang, Jinkook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.90-98
    • /
    • 2016
  • High-rise buildings construction project have various risk factors. Major risk factors are negative results such as time delay and increase of costs. Therefore, this study was analyzed risk factors in construction stages of high-rise buildings using by PROMETHEE technique. For this, this research were identified risk factors through experts Focus Group Interview(FGI). And, PROMETHEE was used to setup evaluation standard for analysis of high-rise building construction risks. Next, the standard of evaluation index calculation was composed by using the definition level in PDRI. Preference function and evaluation index were identified through questionnaires. Through these processes, this study has calculated the importance of high-rise building construction risks using by PROMETHEE technique. As a result, high degree risk factors were as following. These are 'Operation plan of material lifting', 'Outrigger & Belt Truss Construction', 'Foundation work plan of high-rise building' and 'Considering a Structure concept of high-rise building'.

Developing an Owner's Project Evaluation Framework for Construction Management (프로젝트 관리자로서의 발주자 사업수행평가 프레임워크 개발)

  • Kim, Jonghoon;Lee, Hyun-Soo;Park, Moonseo;Park, Sanghyuk;Lee, Inbeom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.130-137
    • /
    • 2016
  • Owner's participation on a construction project can alter the success of a construction project. In general, success of a construction project is measured by project schedule and cost decrease without considering the role an owner has in a project. As a result, this research developed a framework for the project evaluation form and after extracting a total of 9 project critical success factors (CSF) and 27 sub-CSF. AHP method was utilized to evaluate the importance factor of each CSFs. Setting a goal for each CSFs at the beginning of a project and comparing the values at the completion of the project utilizing the project evaluation form will allow a systematic evaluation and management of a project. Solution Map was introduced and Solution Tool was suggested in order to utlize the evaluation results effectively. In the future studies, various project cases needs to be supplemented for further verification and a solution based on the evaluation result needs to be developed that can be applied to construction projects.

A Fundamental Research on Scope Definition for Efficient Landscape Architecture Construction Project (효율적 조경공사 프로젝트 수행을 위한 과업범위설정관련 기초 연구)

  • Joo, Sang-Hyun;Lee, Jae-Keun
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.36 no.3
    • /
    • pp.96-110
    • /
    • 2008
  • Differing from civil engineering and construction, landscape architecture projects are far from efforts in operation and project management. Under the circumstances, it is worthwhile to adopt scope definition from project management for construction and civil engineering in some respects. First, scope definition is able to be conducted through a simple procedure without additional investment in capital and time. Second, the output produced by scope definition is very substantial. The research scrutinized scope definition procedures accompanied by landscape architecture project execution and derived various methods in order to help scope definition for efficient landscape architecture projects. Based on the literature review, a design case study, and an exert interview, the project success elements were developed consisting of 3 sections, 8 categories and 50 elements, grounded on the theoretical base of PDRI. The elements are expected to pave a way to an adequate level of scope definition among participants of landscape architecture projects and contribute in efficient project execution.