• Title/Summary/Keyword: PDCA analysis

Search Result 24, Processing Time 0.036 seconds

A Study on Analysis and Design Method for Resource Management Information System in Container Terminal (컨테이너 터미널의 자원관리를 위한 정보시스템의 분석 및 설계에 관한 연구)

  • 김헌종;송재성;서만승
    • Proceedings of the Korea Association of Information Systems Conference
    • /
    • 2000.11a
    • /
    • pp.12-15
    • /
    • 2000
  • An SADT-based methodology is presented for systematically analyzing the container working process in container terminal, as well as an object-oriented design method for an integrated information system for container terminal resource planning and management. Our design architecture is composed of four levels, activity interface, activity PDCA control, human resource management, and facility resource management. Especially, the consideration of the human resource management level makes it possible to support cooperative tasks, to make the authority and responsibility on a task clear, and to extremely promote the balance between human and facility resources. Finally, The system architecture is suggested for Virtual Container Terminal, in which a planned container working process is simulated for previous feasibility check, work orders are transferred to control real devices, and to manage the entire process and related data.

  • PDF

Development of the Social Responsibility Program (Aspect of Energy & Environmenrs) under CO2 Emission Trading Systems (탄소배출권 거래제도에 따른 기업의 에너지·환경 사회공헌 프로그램 도출 방법론)

  • AHN, JOONGWOO
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.26 no.5
    • /
    • pp.453-462
    • /
    • 2015
  • In this study, a methodology is investigated for the development of social responsibility program employed by major domestic companies under social pressure. It is true, however, that its infancy in history and lack of experience makes it difficult to run novel programs for the companies on their own and it naturally leads to copying and/or slight modification of what others do. Utilizing widely accepted SWOT analysis, stakeholders analysis and PDCA Cycle, a methodology for the successful programs with sustainability is proposed by reflecting business nature and strategic direction. Three real cases are analyzed. In addition, relationship and position with social welfare organizations is elucidated.

INCORPORATION OF TOTAL TIME MANAGEMENT INTO HIGHWAY PROJECT TIME MANAGEMENT SYSTEM

  • Yuan Jianbo;Liu Weijun;Zhang Jianren
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.796-801
    • /
    • 2005
  • Time management is one of the critical tasks in project management. Based on the theories of total quality management, this authors presented a project time management method, total time management (TTM), so as to facilitate highway project time management. This paper discussed the four fundamental characteristics of TTM: total factors management, staff management, project life cycle management, and Plan-Do-Check-Action (PDCA) cycle management. Now, most managers use computer software to manage the project. In order to make the theory of TTM more executable, the authors develop a project time management system suitable for TTM. This paper presents this time management system's analysis processes including system requirement, key functions etc..

  • PDF

A Study on the Development of Topic Map for Analysis of Customer Satisfaction in Tourism Industry (관광산업의 고객만족도 분석을 위한 토픽맵 개발에 관한 연구)

  • Kang, Min Shik
    • Journal of the Korea Convergence Society
    • /
    • v.8 no.10
    • /
    • pp.249-255
    • /
    • 2017
  • The domestic tourism industry mostly relies on quantitative surveys for customer satisfaction. However, customer participation of the questionnaires is extremely low and the improvement of the dissatisfactory factors is not being performed promptly. In this paper, we propose a new topic map system and prove its empirical effectiveness to improve the accuracy of customer feedback information and the efficiency of the analysis process. The topic map system is a system for analyzing large amounts of customer feedback data in real time. It uses text mining and ontology techniques by integrating data collected over a certain period from real-time SNS and quantitative data obtained from existing survey systems. The effect after improving the analyzed factors of dissatisfaction is also a new and innovative evaluation system for monitoring customer satisfaction in real time. The classification based on this integrated data is a classification system that is specific to the product or the customer. According to this classification, it is possible to measure the effect of the recognition and improvement of the complaint factor in real time on the topic map system. This provides a sophisticated prioritization of the improvement factors and enables customer satisfaction quality control as a PDCA feedback system. In addition, the survey period and costs are greatly shortened, and responses can be more precise to the existing survey method. As a practical application, this system is applied to the largest H travel agency in Korea to prove the accuracy and efficiency of the proposed system.

A study of relevant model of information management system based on business process for embodying BPM on construction company (건설기업 BPM 구현을 위한 업무 프로세스 기반의 업무지원 시스템 연계모델에 관한 연구 -공정관리 업무 프로세스를 중심으로-)

  • Lee, Jung-Woo;Song, Young-Woong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.13-27
    • /
    • 2009
  • Construction companies are trying to apply process management to their business to improve efficiency in business circumstance of high competition and globalization. Since 1990s, construction firms adopted process management to improve internal and external business structure based on process. It however has a few improvement functions. In addition, business support systems for business process efficiency improvement were developed, but separation between business process and IT system occurred because it focused on function-based individual construction and data input/output. To solve this problem, this study proposed business process and IT integration model for supporting user to use business information and system based on visualized business process and improving use of previous business support system. Business efficiency is expected to be improved with this model which based on integration required business condition(stakeholder, business data, functions of business supporting system). This study developved process model, architecture, and BPA of whole construction management business. According to BPA, it analyzed business process stakeholder, detail activities, and input-output data. And also it examined 12 main business supporting system of Korean construction firms. Based on analyzed data, this study developed business process supporting integration model based on business process through PDCA and CRUD analysis.

Development of Fall Prevention Program for Improvement of Healthcare in Rehabilitation Patients Based on Image Processing : A Preliminary Investigation (영상처리 기반 재활 환자의 헬스케어 개선을 위한 낙상예방 프로그램 개발 : 예비연구)

  • Kang, So-La;Yoon, Jung-Dae;Yoo, Jin-Won;Na, Chang-Ho;Heo, Sung-Jin;Kim, Ye-Soon;Moon, Jong-Hoon
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.13 no.4
    • /
    • pp.887-896
    • /
    • 2018
  • The purpose of this preliminary study was to investigate the effect of fall prevention program on the occurrence of falls in inpatients at general hospital. Before the intervention, we identified the occurrence of the rate of falls in I hospital at Incheon and 190 patients received rehabilitation treatment. The causes of falls were carelessness of caregivers and therapists, increased burden of therapists, and height of beds. After recognizing the problems, the authors developed a fall prevention program through the PDCA model. The fall prevention program consisted of a video of fall prevention education and education for the patients and caregivers, environmental improvement and education of therapists for two months. After intervention, 230 patients were subjected to be included as analysis of the incidence of falls included As a result, the fall incidence was reduced by 34.1~66.7% in the pain clinic and 21.3~40.8% in the exercise clinic / department of occupational therapy compared to the before intervention. These findings show that the fall prevention program has a positive effect on the fall of inpatients, and it can be used as a model for fall prevention.

Total quality management Activities Evaluation (TAE) Model by the traditional scoring system and the efficiency measuring system (품질경영활동의 효율성을 고려한 평가모형)

  • 유한주
    • Journal of Korean Society for Quality Management
    • /
    • v.26 no.3
    • /
    • pp.100-107
    • /
    • 1998
  • To evaluate the total quality activities is the most fundamental and critical process as one of the PDCA cycle. The quality award criteria such as Malcolm Baldrige National Quality Award and Deming Award can be a, pp.ied to the guideline for evaluating quality activities. We can identify several important factors for TQM by referring quality award criteria, but they don't suggest how efficiently implement TQM. In this paper, two methodologies are a, pp.ied to evaluate the TQM activities comparatively. One of them is the traditional scoring system (TSS) by analytic hierarchy process (AHP). TSS is the system which evaluates the performance of TQM by the weighted sum of critical success factors. Several quality award system are typical examples of TSS. The other is the efficiency measuring system (EMS) by data envelop analysis (DEA). DEA outperformed other alternative methods to measure the efficiency and it can be a, pp.ied to evaluate the TQM activities. The evaluation system by DEA can be named as EMS. The objective of this paper is to suggest a model called TAE (Total quality management Activities Evaluation), for evaluating TQM activities. In this model TQM organizations are classified into four types by considering TSS and EMS. Those types are high weighted sum and high efficiency type, high weighted sum and low efficiency type, low weighted sum and high efficiency type, and low weighted sum and low efficiency type. Therefore TQM organizations must not only make efforts to get the higher scores in terms of TSS, but also take necessary steps to enhance their efficiencies.

  • PDF

A Study on Quality Management and Assessment Model for System-Integration Organization

  • Lee, Byung Yong;Jung, Soo Il
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.24 no.68
    • /
    • pp.85-94
    • /
    • 2001
  • Most of customers want to know how to develop the computer system they want to get to use according to the their requirements. This study presents a Computer Integration management System for Quality (CISQ) model for system-integration organizations, which need to demonstrate their capability to consistently provide computer integrated system that meets customer satisfaction and applicable regulatory requirements. The Plan.Do.Check.Act(PDCA) cycle called by Doming wheel expresses the basic concept of continuous improvement action in order to emphasize on achieving business goal. It is useful for providing full competence of a system-integration organization to integrate management systems based on the international management system, and to take an advantage in its market. This study specifies International Certification Network Business Excellence Concept(IBEC) approach to ensure a harmonized integration of the variety of management systems and thereby produce synergy effect. The end part of this study specifies a Assessment Model including an assessment concept adding to the compliance audit according to the CISQ for the continuous improvement. A simple application on Failure Modes and Effects Analysis(FMEA) in testing phase in project life cycle has been done.

  • PDF

Optimal alternative decision technique of accommodation facility in multi-utility tunnel using VE/LCC analysis (VE/LCC 분석을 통한 공동구 수용시설물의 최적 대안 결정 기법)

  • Sim, oung-Jong;Jin, Kyu-Nam;Oh, Won-Joon;Cho, Choong-Yeun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.2
    • /
    • pp.317-329
    • /
    • 2018
  • The study on the existing multi-utility tunnel has examined the general aspects related to the installation of multi-utility tunnel rather than the optimal design and feasibility analysis of accommodation facility in multi-utility tunnel. In the basic planning stage related to the introduction of multi-utility tunnel, it is difficult to determine accommodation facility due to lack of relevant indicators and data. In this paper, VE/LCC analysis method is suggested for the optimal alternative decision of accommodation facilities in multi-utility tunnel. The analysis of the items of individual accommodation facility and the value index for LCC costs were applied to the kind alternatives, and the priorities of each kind were analyzed. In addition, the domestic multi-utility tunnel and analysis result are compared. The result of this study will be helpful to shorten the time and convenience of the user in the process of determining accommodation facility including the first designers when introducing multi-utility tunnel.

Comparative Analysis of Work Stress Assessment Tools for Estimating Human Work Performance (업무수행도 추정을 위한 직무스트레스 평가표의 비교 분석)

  • Jang, Tong-Il;Lee, Yong-Hee;Han, Kyu-Jeong;Lim, Hyeon-Kyo
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.6
    • /
    • pp.144-150
    • /
    • 2014
  • A man is a component of a large system how complex it may be so that human performance which can influence on the system safety should be included in system safety assessment. Meanwhile, human performance can vary over time due to lots of factors. Among them, stress is an indirect factor that may cause human error which can result in industrial accidents. To assess stress level of human workers, not a few assessment tools have been developed. However, it can be questionable to utilize them for human performance anticipation because they were mainly developed with the viewpoint of mental health, though stress assessment can be also required in the safety aspect. Therefore, this study aimed to survey the possibility of their application with safety purpose. About 10 kinds of work stress tools were collected and analyzed with reference to assessment items, assessment and analysis methods, and follow-up measures. The results showed that most tools focused their weights on Demands, Supports, and Relationships, in sequence. However, they, except only one tool developed by the Japanese researchers, merely advised to set up counterplans in PDCA cycle or risk management activities. In consequence, application of stress assessment tools mainly developed for mental health seemed impractical for safety purpose with respect to human performance anticipation so that it was concluded that development of a new assessment tools aimed to human performance variation and accident prevention would be inevitable.