MOON E. A.;LIM H. W.;BAEK H. L.;CHO G. B.;OH G. K.;LIM Y. S.;KIM P. H.
Proceedings of the KIPE Conference
/
2004.07a
/
pp.147-150
/
2004
Maximum power point tracking for PV systems traditionally uses either perturbation and observation method or incremental conductance method. Both methods require modulation of the output voltage and this leads to significant power loss. In this paper, a method, which senses output circuit voltage and short circuit current and use the above two parameters for optimum control with a fuzzy controller, is introduced. The short circuit current of PV cell represents illumination, and the output circuit voltage carry on information about the temperature. PCS(power conditioning system) is controlled not only feed to inverter for stability voltage variation despite of variety external environment, but also operate in order to feeding voltage and current at maximum power point by boost type chopper.
Seo, Hyo-Ryong;Jang, Seong-Jae;Park, Sang-Soo;Kim, Sang-Yong;Kim, Gyeong-Hun;Park, Min-Won;Yu, In-Keun
Proceedings of the KIEE Conference
/
2009.07a
/
pp.1053_1054
/
2009
A significant number of renewable energy systems have been connected to the grids as supplement power source. The renewable energy systems require control algorithm to maintain the power-supply reliability and quality. This paper proposes a novel control algorithm for smart Power Conditioning System (PCS) with harmonics and reactive power compensation. The smart PCS is used to feed Photovoltaic (PV) power to utility and compensate harmonics and reactive power at the same time. The experimentation is carried out on the proposed grid-connected PV generation system, and controlled by digital signal processor. The grid-connected PV generation system injects PV energy into the grid and performs as Active Filter (AF) and Static Synchronous Compensator (STATCOM) without additional devices. The experiment results show that the proposed control algorithm is effective for smart PCS with harmonics and reactive power compensation.
신재생 에너지원인 풍력과 태양광등 대체에너지의 확대보급과 풍력발전과 에너지 저장장치와 같은 신재생 에너지원 및 스마트그리드 분야에 적용을 위한 대용량 PCS(Power Conditioning System) 개발에 대해 설명한다. 실외 설치환경 및 장소에 따른 많은 제작, 운영조건에서 벗어 나고자 냉각방식을 수냉형으로 설계하였다.
이 논문에서는 전류형 MPPT(Maximum Power Point Tracking) 기법을 제안하고 적용하여 태양광 PCS(Power Conditioning System)의 기본적인 제어기를 설계하고 구현하였다. 기본적인 무변압기형 토폴로지에 전류 MPPT를 수행하고 이때에 얻어진 기준전류를 dc/dc 부스트 컨버터를 통해 dc-link에 전압을 충전하여 준다. 이 충전된 파워는 인버터를 통해 계통에 공급되게 된다. 이처럼 크게 MPPT제어, dc/dc컨트롤러, dc-link전류제어, 인버터 전류제어로 나뉘며 본 논문에서는 각 부분의 제어기를 살펴보고 실험을 통해 제어기의 성능을 확인하였다. 실험결과 제안된 전류 MPPT는 원활히 파워를 공급해주었고 dc/dc 부스터 컨버터를 거처 인버터 단까지 파워를 안정적으로 발전하는 것을 확인하였다.
전력 계통에 연계하는 신재생에너지 분산형 전원의 보급량이 지속적으로 늘어나면서 저압 계통의 공통 연계점에 다수대의 PCS(Power Conditioning System)가 집중적으로 설치되는 사례가 증가하고 있다. 최근 일본전기공업회(JEMA)는 계통 사고나 계획 정전 등으로 변전소 차단기가 개방되었을 때, 복수대 PCS의 능동방식이 서로 간섭을 일으켜 정해진 시간 내에 단독운전 검출기능이 작동하지 않게 되는 상황을 방지하기 위해 표준형 단독운전 능동적 방식을 공표하였다. 본 논문에서는 일본 단독운전 검출방식의 표준으로 지정된 스텝주입이 있는 주파수피드백 방식의 원리와 특징을 살펴보고, 이를 적용하여 연계 보호기능의 안전성 확보와 분산형 전원 보급에 기여하는 효과에 대해 소개하였다.
This paper presents the development and performance of a power conditioning system (PCS) for application to a 100kw Molten Carbonate Fuel Cell. (MCFC) generation system. The MCFC generation system is a part of a four year government funded research project that began in 2001. This paper presents the results of operation connected to an actual fuel cell stack at a field demonstration site. and this paper shows various tests and performance verification of the 100kW PCS using a simulated DC source.
This paper is purposed to develop hardware for controlling abnormal temperature that can occur environment and component itself in PCS. In order to be purpose, the hardware which is four part(sensing, PLC, monitoring and output) keep detecting temperature for critical components of PCS and can control the abnormal temperature. Apply to the hardware, it is selected to PV power generation facilities of 20 kW in Cheong-ju city and measured the data for one year in 2017. Through the temperature data, it is found critical components of four(discharge resistance, DC capacitor, IGBT, DSP board) and entered the setting value for operating the fan. The setting values for operating the fan are up to $130^{\circ}C$ in discharge resistance, $60^{\circ}C$ in DC capacitor, $55^{\circ}C$ in IGBT and DSP board. The hardware is installed at the same PCS(20 kW in Cheong-ju city) in 2018 and the power generation output is analyzed for the five days with the highest atmospheric temperature(Clear day) in July and August in 2017 and 2018 years. Therefore, the power generation output of the PV system with hardware increased up to 4 kWh.
In this paper, a novel anti-islanding method of DC-AC single phase inverter is proposed. The inverter injects a little harmonic current with the output current of a PCS(Power Conditioning System). When the islanding condition is occurred, the voltage harmonic components appear on the output voltage of the PCS due to the injection of a little harmonic current. So, the PCS detects the voltage harmonic components using the Goertzel algorithm, and then the PCS decides that the islanding condition is occurred. When the PCS recognizes the islanding condition, the PCS are stopped. The proposed a novel anti-islanding method is analyzed, and its validity is proven through simulation.
The purpose of this paper is to explain the real characteristics of generation system of large scale power system of high voltage the grid connected PV power system for electricity industry. Main system is made up PCS in the class 150kVA. and we studied commercial operation in Korea-Western Power Company,(Tae-An headquarter) with the capacity of module is 122.5 $kW_p$. On the average, power plant utilities' utilization is 12.71 percent and consumption rate is 6.66 percent. We operated normally since 25th, August 2005 without any other problems.
Lee Hyun-Kwan;Cha In-Su;Lee Gi-Sik;Chung Bong-Geun;Kang Sung-In;Kim Eun-Soo
The Transactions of the Korean Institute of Electrical Engineers B
/
v.55
no.8
/
pp.423-429
/
2006
Recently, the high frequency isolated boost DC/DC converter has been widely used for the PCS (Power Conditioning System) system because of its small size and low cost. However, the high frequency isolated boost DC/DC converters applied the conventional voltage-fed converter and current-fed converter have the problems such as the high conduction losses and the surge voltage due to the high circulating current and the leakage inductance, respectively. To overcome this problems, in this paper the secondary LLC resonant converter is proposed, and the experimental results of the secondary LLC series resonant converter for boost DC/DC converter are verified on the simulation based on the theoretical analysis and the 700W experimental prototype.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.