• Title/Summary/Keyword: Owner Risk

Search Result 97, Processing Time 0.033 seconds

RISK ANALYSIS FOR INDUSTRIAL PROJECT IN CONSTRUCTION PHASE: A MONTE-CARLO SIMULATION APPROACH

  • Soo-Yong Kim;Luu Truong Van;Han-Ki Ha;Nguyen Quoc Tuan
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.130-139
    • /
    • 2007
  • This paper presents a study on risk analysis in terms of contractor's costs in construction phase in which Crystal ball (software of Decisioneering, UK) has been utilized as a main tool. To realize it, a questionnaire survey has been carried out to identify the dominant factors that strongly influence contractor costs in Vietnam. Based on results of questionnaire investigation, the survey identified three factors which were duration of each construction task, costs of reinforcing steel, and cement. Then a spreadsheet model was created in order to analyze risks. The study also indicates that the cost of reinforcing steel and cement are the cause of risks for contractors. According to the suggested model, contractors may foresee the probability of completion within the approved budget, and the possibility of earning in accordance with owner's payment conditions.

  • PDF

A Study on the Hazard Factor and Safety Management at Transmission Line During Live Line Works (송전선로 직접활선공법의 위험요인과 안전대책에 관한 연구)

  • Choi, Seung-Dong;Kang, Kyong-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.8 no.3
    • /
    • pp.51-66
    • /
    • 2006
  • This study was attempted to analyze risk factors and suggest accident prevention in live line works for power transmission lines to be developed and applied in Korea. Safety problem cannot but occur at development of live line works and application to the field. With respect to this, problems likely to occur in the field among works adopting methods of works including live line works for power transmission lines were investigated and analyzed through documentary survey and risk assessment method. The results are summarized as follows. A risk assessment method model was suggested. This method enables scientific and systematic development of safety control. That is, the owner may autonomously induce safety control and build risk assessment database by work process to use them as best training data for workers. Also, in the field, it may induce all workers to participate in safety program and secure safety by making workers seek for safety working method under smooth flow from looking at risk factors to accident prevention activities. It is deemed that this humble study will prevent both accident and injury likely to occur in live line works for power transmission lines.

The Trend of CM at Risk in the U.S Construction Market (미국 CM at Risk 시장 동향 및 시사점)

  • Chang, Chul-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.67-73
    • /
    • 2006
  • Alternative project delivery methods including design-build and CM at Risk have evolved as a means of meeting owner's diverse needs and implementing project efficiently with limited budget and time in more competitive construction environment. It is time to consider adopting alternative project delivery methods, especially CM at Risk, for domestic construction industry to enhance competitiveness and to provide various options for owners so that they can select more appropriate project delivery methods for the facility being planned. This research report derives suggestions from investigating how CM at Risk has been evolved in the US construction market. Besides the analysis of CM at Risk market in the US construction industry, the characteristics of companies whose market share are in Top 100, the type of facility usually built by this method were investigated. Based on the analysis of CM at Risk in the US, the prepositions in adopting CM at Risk to domestic construction industry and the possibility of adopting this method have been identified.

  • PDF

Exploring Critical Risk Factors of Office Building Projects

  • NGUYEN, Phong Thanh;PHAM, Cuong Phu;PHAN, Phuong Thanh;VU, Ngoc Bich;DUONG, My Tien Ha;NGUYEN, Quyen Le Hoang Thuy To
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.8 no.2
    • /
    • pp.309-315
    • /
    • 2021
  • Risks and uncertainty are unavoidable problems in management of projects. Therefore, project managers should not only prevent risks, but also have to respond and manage them. Risk management has become a critical interest subject in the construction industry for both practitioners and researchers. This paper presents critical risk factors of office building projects in the construction phase in Ho Chi Minh City, Vietnam. Data was collected through a questionnaire survey based on the likelihood and consequence level of risk factors. These factors fell into five groups: (i) financial risk factors; (ii) management risk factors; (iii) schedule risk factors; (iv) construction risk factors; and (v) environment risk factors. The research results showed that critical factors affecting office building projects are natural (i.e., prolonged rain, storms, climate effects) and human-made issues (i.e., soil instability, safety behaviors, owner's design change) and the schedule-related risk factors contributed to the most significant risks for office buildings projects in the construction phase in Ho Chi Minh City. They give construction management and project management practitioners a new perspective on risks and risk management of office buildings projects in Ho Chi Minh City and are proactive in the awareness, response, and management of risk factors comprehensively.

A Study on the Insurance System for Oil Pollution Risk (유류오염 리스크와 보험담보의 문제)

  • Choi, Mi-Soo
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.41
    • /
    • pp.185-202
    • /
    • 2009
  • With the rapid development of oil and chemical industry in the late 20C, massive transportation of oil by oil tanker vessel has grown and it caused the big oil pollution accidents. When oil spill from the oil tanker, damages reach into the astronomical figures in economically and damages affect wide area and many people with break the balance of ecosystem. Recently in Korea, the oil pollution accidents has occurred frequently as growing of oil consumption and it caused large-scale damages to the victim. Oil pollution in Korea offshore takes not only Korean fisherman from their life ground and break the ecosystem but it takes too much time and money to recover. To minimize oil pollution damages, it is necessary to make pre-caution effort as a ship owner and relevant government bodies should endeavor to prevent from more damages. But once oil pollution accidents occurs in territorial sea, compensation for victim is very important. But it is true that compensation is not paid to victim smoothly. So this study aims at the problems of oil pollution compensation to the Korean victim and find the best way to get reasonable compensation.

  • PDF

A Study on the Navigational Rules and Regulations for the Narrow Channel (좁은 수로에 있어서의 항법에 관한 연구 - 완도구역 연안항로를 중심으로 -)

  • 이철환;김광수;금종수
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.7 no.3
    • /
    • pp.41-59
    • /
    • 2001
  • Recently, as the coastal trading is being increased rapidly, risk of collision being increased especially in the coastal route near around the port of Wando. In this paper, with the reference to various literatures and papers on collision avoidance rules, the navigational rules and regulations for the coastal area-especially for the narrow channel-are construed and introduced in brief. Also, 3 collision cases near around the port of Wando and statistical data during 5 years(1996 to 2000) are studied. The results of this study are as follows; 1. It is strongly recommended to separate the route of east-bound and west-bound in this area due to removing the risk of collision between the vessels in reciprocal way. 2. The owner of the fleet should lead that the master should con the vessel by himself when passing this area. 3. For the introduction of the Coastal VTS, it is required to investigate the capability to cooperate with military radar sites which based on all over the coast.

  • PDF

Legal Issues on the Diving Apparatus Fishery: The case of contract responsibility and accountability at the time of ship collision (잠수기 어업과 관련한 법률상의 쟁점 -약정책임과 선박충돌시의 법정책임을 중심으로-)

  • Heo, Gyeom;Shin, Hyeon-Ok;Lim, Seok-Won
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.26 no.3
    • /
    • pp.647-655
    • /
    • 2014
  • In this research, unlike other fishing, the diving apparatus fishery is that the diver is engaged in fishing for profits. Because it is unique fishery, conflicts can be occurred in members. So, the purpose of this research is to define the contractual relationship between the parties of the diving apparatus fishery. For example, the relationship between the owner and diver and the owner and fishing ship crew. In addition, civil liability of default on the obligation was reviewed. Also, because the trouble was occurred by illegal fishing, criminal liability of ship crash caused by illegal diving apparatus fishery was considered. As a result, It is important to notifying the necessity of some method for the status of diver and fishing ship crew in diving apparatus fishery. moreover, It is need to educate the risk of illegal fishery for the parties of diving apparatus fishery.

A Comparative Analysis of Integrated Project Delivery in Construction Versus Traditional Methods

  • Peressini, Anthony;Bristow, James;Motahari, Mahmoud;Karakouzian, Moses
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.669-677
    • /
    • 2022
  • In this paper, different types of traditional project delivery methods in the construction industry were explored and a comparative analysis against Integrated Project Delivery (IPD) were performed. The advantages of IPD method for all parties, owner/engineer/architect/general contractor, were explored by reviewing the most recent literature. The literature suggests that IPD method should be the dominating project delivery method and diluting the conventional methods such as Design-Bid-Build due to more collaborative and mutually beneficial ways of doing construction; IPD is newer and a more comprehensive method to capture the intrinsic values of project collaboration. This paper presents a comparison of the commonly used methods of project delivery, Design-bid-build, CMAR, & Design-Build and addresses their advantages and disadvantages in differing project scopes and sizes. Several industry leaders with experience in the four types of project delivery addressed were surveyed. The survey results show an overwhelming desire for future projects to go toward IPD from the contractor/owner/RDP. The biggest obstacle facing a project from using IPD appears to be trust.

  • PDF

COVID-19's Effect on a Hotel Construction: A Case Study

  • Kayastha, Rujan;Kisi, Krishna P.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.649-657
    • /
    • 2022
  • The COVID-19 pandemic has unprecedented impacts on different sectors around the globe. The effects observed in developing countries are even more severe. Some projects stopped while many have cost and time overrun issues. This paper conducted a case study on the COVID-19's effects on a hotel construction project in Nepal. The study reviewed the literature on COVID-19 and its impact on construction sectors and conducted a semi-structured interview with the project's personnel. The interview response was analysed and the contributing factors that impacted the project and its performance were identified. The paper found financial, operational, contractual, safety, and risk management issues in the hotel project. Overall, the project cost increased by 32% where the material cost increased by 35% and labor cost increased by 28%. This research discusses causes, measures, and provides a broad perspective of the problems, significant challenges, and opportunities associated with the effects of COVID-19 on the construction industry. The Owner as well as the Contractors incurred added costs because of COVID-19. The paper identified contributing factors and presented the challenges which could be used as opportunities to minimize unforeseen impacts of the pandemics in near future. The lesson learned from this case study was that the labor cost and materials cost could have been minimized if the Owner and the Contractor had established alternative resources such as using locally available labor, materials, and alternative suppliers.

  • PDF

Digital Government Application: A Case Study of the Korean Civil Documents using Blockchain-based Resource Management Model

  • Hanbi Jeong;Jihae Suh;Jinsoo Park;Hanul Jung
    • Asia pacific journal of information systems
    • /
    • v.32 no.4
    • /
    • pp.830-856
    • /
    • 2022
  • The Digital Government landscape is changing to reflect how governments try to discover innovative digital solutions, and how they transform themselves in the process. In addition, with the advent of information and communication technology (ICT), e-governance became an essential part of the government. Among the services provided by the Korean government, the Minwon24 online portal is the most used one. However, it has some processing limitations, namely: (1) it provides a cumbersome document authenticity service; (2) people cannot know what happened even if the agency handles the documents arbitrarily. To address the issues outlined above, blockchain processing can be a good alternative. It has a tremendous potential in that it has maximum transparency and a low risk of being hacked. Resource management is one of the areas where blockchain is frequently used. The present study suggests a new model based on blockchain for Minwon24; the proposed model is a type of resource management. There are three participants: issuer, owner and receiver. The proposed model has two stages: issuing and exchanging. Issuing is creating civil documents on the database, which is BigchainDB in this study. Exchanging, the next stage, is a transaction between the owner and the receiver. Based on this model, the actual program is built with the programming language Python. To evaluate the model, the study uses various criteria and it shows the excellence of the model in comparison to others in prior research.