Analysis of soil resistance on drilled shafts using proposed cyclic p-y curves in weathered soil

  • Jeong, Sangseom;Park, Jeongsik;Ko, Junyoung;Kim, Byungchul
    • Geomechanics and Engineering
    • /
    • v.12 no.3
    • /
    • pp.505-522
    • /
    • 2017
  • A fundamental study of drilled shafts-soil systems subjected to lateral cyclic loading in weathered soil was conducted using numerical analyses. The emphasis was on quantifying the soil resistance of laterally cyclic loaded pile using 3D finite element analysis. The appropriate parametric studies needed for verifying the cyclic p-y characteristic are presented in this paper. A framework for determining the cyclic lateral load transfer curve (p-y curves) on the basis of numerical analyses is proposed. Through comparisons with results of field load tests, the three-dimensional numerical methodology in the present study is in good agreement with the general trend observed by in situ measurements and thus, represents a realistic soil-pile interaction for laterally loaded piles in soil than that of existing p-y method. It can be said that a rigorous present analysis can overcome the limitations of existing cyclic p-y methods to some extent by considering the effect of realistic three-dimensional combination of pile-soil forces. The proposed cyclic p-y curve is shown to be capable of predicting the behavior of the drilled shafts in weathered soil.

A Case Study on the Construction e-Collaboration Process Control System of Middle and Small Manufacturing Industry (중소제조업의 협업공정관리시스템 구축 적용 사례)

  • Kim, Jong-Tae
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.32 no.2
    • /
    • pp.13-20
    • /
    • 2009
  • The purpose of this paper is to give information on e-CPC implementation in the manufacturing industry by studying and analyzing a small and medium sized manufacturing company. After analyzing Various factors on J's e-CPC implementation such as environmental factors, process management factor, and result factors, success factors on J's e-CPC implementation are analyzed. The results of this paper can be summarized as follows. First, the most leading role on J's ERP implementation is the will and support of CEO and team leaders. They led the implementation to be stability successfully by settling the different opinions among teams, showing their ability on process decision and communication with consultants. Second, J tried to prompt system stability by mapping out and conducting the long term change management strategy. Third, J organized ERP project team to implement ERP quickly, and it turned out to be successful Finally, J tried to get outside information from consultants and collaborative companies that have experience in implementing ERP. Especially J made full use of overseas consultants. In respect that this paper giver lots of information on e-CPC implementation in manufacturing industry by a case study of a small and medium sized manufacturing company which has not been carried out so far, it would be useful enough.

Hard rock TBM project in Eastern Korea

  • Jee, Warren W.
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2008.10a
    • /
    • pp.33-41
    • /
    • 2008
  • The longest tunnel has been halted at Daekwanryung by the failure of the host country of the Winter Olympiad in 2014, but modern High-Power TBM will come to Korea to excavate these long tunnels to establish the better horizontal connection between the western and eastern countries to improve the strong powerful logistic strategy of Korean peninsula. Train operation provides a key function of air movements in a long underground tunnel, and heat generation from transit vehicles may account of the most heat release to the ventilation and emergency systems. This paper indicates the optimal fire suppress services and safety provision for the long railway tunnel which is designed twin tunnel with length 22km in Gangwon province of Korea. The design of the fire-fighting systems and emergency were prepared by the operation of the famous long-railway tunnels as well as the severe lessons from the real fires in domestic and overseas experiences. Designers should concentrate the optimal solution for passenger's safety at the emergency state when tunnel fires, train crush accidents, derailment, and etc. The optimal fire-extinguishing facilities for long railway tunnels are presented for better safety of the comfortable operation in this hard rock tunnel of eastern mountains side of Korea. Since year 1900, hard rock tunnel construction has been launched for railway tunnels in Korea, tunnels have been built for various purposes not only for infrastructure tunnels including roadway, railway, subway, and but also for water and power supply, for deposit food, waste, and oils etc. Most favorable railway tunnel system was discussed in details; twin tunnels, distance of cross passage, ventilation systems, for the comfortable train operations in the future.

  • PDF

Improvement for Asset Management of Sewage Treatment Facilities (하수처리시설 대수선비 자산화 영향분석 및 제도개선 방안)

  • Park, Ha Jin;An, Man Sun;Cho, Nam Ho;Kim, Kyong Ju
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.2D
    • /
    • pp.285-293
    • /
    • 2011
  • Sewage treatment facilities are growing rapidly in quantitatively and qualitatively. However, privatization such as up-size and professionalism, etc. are insufficient, compared to global companies' cases. Infrastructure Asset management has not been applied widely despite of sewage treatment facilities are one of the most critical social infrastructure. Maintenance, repair, and rehabilitation (R&R) practices of sewage treatment facilities have been studied and infrastructures asset management techniques have been applied. Cost model which makes it possible to calculate managerial costs such as major cost, etc. needs to be developed only with project basic information when proceeding new sewage treatment facility construction and management and overseas sewage project. Effects to converse major repair cost into capital, application of sewage treatment facility's asset management, expected effects, etc. were analyzed and suggested an alternative on the improvements of legal system.

Development of a Cloud-Based Infrastructure Engineering Design Platform Prototype (클라우드 기반의 인프라 엔지니어링 설계 플랫폼 프로토타입 개발)

  • Cho, Myung-Hwan;Pyo, Kil Seop;Youn, Seung Wook;Jung, Nahm-Chung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.4
    • /
    • pp.559-569
    • /
    • 2022
  • Infrastructure engineering is a field that supports construction (assembly) as a representative industry that creates high added value and jobs by combining science and technology with knowledge, though its importance is underestimated. According to a report from the Ministry of Land, Infrastructure and Transport (Korea), the value-added rate (65.3%) of the engineering industry and the employment inducement coefficient (14 employees per billion won) are three times higher than in manufacturing. In particular,the forward value chain (such as project management and basic design) accounts for less than 10~15% of the total project cost but determines the overall price and quality of the infrastructure facilities. In this study, a work break-down system, design support module and database development method for road design projects for design platform development is presented. Based on the presented development method, a cloud-based infrastructure design platform's prototype is developed. The developed infrastructure engineering platform is expected to provide a web-based design work environment without time/space restrictions and greatly contribute to winning overseas business orders and securing competitiveness.

The estimating method of construction workable-quantity per unit time - Focused on Pump-Dredge - (건설기계 시간당작업량(Q) 산정 개선방안 -펌프준설선 작업효율(E)을 중심으로-)

  • Ahn, Bang-Ryul;Tae, Yong-Ho;Suh, Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.125-133
    • /
    • 2010
  • Although work-efficiency of construction machinery is a critical factor for estimating its workable-quantity perunit time, the efficiency figure table presented in the Poom-Sam that is used for Construction Cost Estimation of public sectors in Korea is very subjective for practical usage. In order to suggest objective work-efficiency table for a Pump-Dredger, domestic and overseas documentary records were investigated and on-going construction sites were also visited. Moreover, actual work quantities collected from the site visits were compared with the ones calculated based on the Standard Measurement Methods used in Japan. The research found that the table can be revised by means of detailing down by several factors, namely project type, depth of soil, undersea-site shape, and condition on the sea for better estimation of its workable-quantity. The research will be the foundation for applying the rapid development of Construction Equipment and technology to the appropriate cost estimations and the ground work of related studies.

Development of optimal cross-section design methods for bored utility tunnels: case study of overseas typical cross-sections and design criteria (터널식 공동구 최적단면 설계기술 개발: 해외 표준단면 사례 및 설계기준 분석)

  • Park, Kwang-Joon;Yun, Kyoung-Yeol
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.6
    • /
    • pp.1073-1090
    • /
    • 2018
  • Since the domestic utility tunnels were built mainly in the development project of the new city, they are all in the form of cut-and-cover box tunnel. But, in the case of overseas construction of utility tunnels for existing urban areas, the bored tunnel types are mainly adopted. It is reasonable to install bored tunnels in a downtown area because it is difficult to block the roads or install bypass roads due to heavy traffic and civil complaints. In order to activate the utility tunnels in bored type, it is necessary to secure optimized cross-sectional design technology considering the optimal supplying capacity and mutual influencing factors (Thermal Interference, electrolytic corrosion, efficiency of the maintenance, etc.) of utilities (power cables, telecommunication cables, water pipes, etc.). The optimal cross-section design method for bored utility tunnels is ultimately to derive the optimal arrangement technique for the utilities. In order to develop the design methods, firstly, the cases of tunnel cross-section (Shield TBM, Conventional Tunneling) in overseas shall be investigated to analyze the characteristics of the installation of utilities in the section and installation of auxiliary facilities, It is necessary to sort out and analyze the criteria related to the inner cross-section design (arrangement) presented in the standards and guidelines.

A Study on Re-design of Quality Requirements for Disaster Communication Systems (재난통신 체계에 따른 품질요건 재설계에 관한 연구)

  • Yang, Jung-Mo;Kim, Jeong-Ho
    • Journal of Digital Convergence
    • /
    • v.13 no.10
    • /
    • pp.327-335
    • /
    • 2015
  • Wireless mesh networks for public safety and disaster have been developing in a direction from TETRA(TErrestrial Trunked RAdio) to take advantage of the Public Safety-LTE(Long Term Evolution) technology. In Korea, the Disaster Safety Network Building Project has been promoted in order to unify disaster communication systems among disaster response agencies. In this study, the trends of the network construction for national disaster communication and corresponding representative cases of overseas have been analyzed. Through this process, the disaster communication area in line with the purpose of communications. As a result, the disaster communication can be divided into five distinctive areas: the control, the response, the on-site, the victim and the alarm communications. Based on the re-designed communication areas, quality requirements have also been re-organized in this study. Ultimately the construction method for the Disaster Communication systems without exclusion zone will be presented.

Analysis of Domestic and Overseas Environment to Introduce Performance Warranty Contracting for Pavements into Korea (도로포장 성능보증계약제도 도입을 위한 국내외 적용환경 분석)

  • Kim, Tea-Song;Seo, Yong-Chil;Lee, Sang-Beom;Koo, Jai-Dong;Kim, Kyong-Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.216-221
    • /
    • 2008
  • This study has been carried out in order to observe the status of performance warranty contracting system currently being implemented at the advanced countries including Europe, U.S.A., and Japan, review the introduction feasibility and possibility. For this purposes this study has surveyed the concept and necessity of performance warranty contracting system as well as the status of domestic performance warranty contracting system. Especially the application environment for the performance warranty contracting system of Europe, U.S.A., Japan and Korea in terms of maintenance guarantee liability system, performance warranty regulations for design-build contracting system, selection method of successful bidder, performance warranty means, project contracting system including maintenance cost, and specifications and contract conditions for performance warranty system have been comparatively evaluated. And introduction methods of performance warranty contracting system were suggested.

  • PDF

A Case Study on Blast Demolition Work of a Pier Structure (교각구조물 발파해체 시공사례)

  • Park, Keun-Soon;Lee, Joon-Seok;Park, Sang-Soo
    • Explosives and Blasting
    • /
    • v.25 no.2
    • /
    • pp.47-60
    • /
    • 2007
  • The blast demolition technology has been used to demolish various industrial facilities and tall buildings since 1950s in the advanced countries such as USA and U.K. It is now considered as one of safe demolition methods in the above countries. In Korea, several companies have tried to introduce blast demolition technology in the early days of the 1990s. However, this technology is still at the beginning stage and not fully adopted due to situation of avoiding technology transfer by overseas technical tie-up companies, lack of objects to be demolished and low level recognition on blast demolition. This technology shall be considered as a cutting edge technology to be applicable to demolition of skyscrapers, various industrial structures and factory buildings in the near future. Blast demolition of a pier structure was carried out under the site condition where there were already the constructed 2 pier structures of up and down line which had safety problems in an expressway construction project. The pier structures need to be demolished and reconstructed for a short period of time in consideration of the construction work process to be followed.