• Title/Summary/Keyword: Overhead contact line

Search Result 64, Processing Time 0.025 seconds

A Study on Fatigue Analysis of Dropper for High Speed Electric Railway (고속선용 드롭퍼 피로분석 연구)

  • Lee, Tae-Hoon;Park, Ki-Bum;Jeon, Yong-Joo;Ryu, Young-Tae;Cho, Yong-Hyeon;Lee, Ki-Won;Park, Young
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1445-1453
    • /
    • 2009
  • The dropper supports the contact wire and is attached using thimbles and various types of dropper clips on the catenary. Consequently droppers are subject to mechanical loads from friction and buckling during the passage of pantographs. If such mechanical loads occur repeatedly with every passing pantograph, it is possible that the dropper wire will break due to fatigue. In order to investigate failure causes for the high speed line dropper, theoretical analyses and experiments have been carried out. In this paper, mathematical formulas are derived for the prediction of the dropper static load. The measured values in the experiment agree well with the theoretical predictions. And, we performed measurement for the variation of forces on the dropper. To analyze the cause analysis on fracture of dropper wire, we have conducted experiment such as fatigue test of new products, SEM(Scanning Electron Microscope) and EDX(Energy Dispersive X-ray) of fractured specimens in the field. Finally, we also measured the vertical displacements when a pantograph moved at 300km/h under the Korean high speed overhead line.

  • PDF

A Study on the Estimation and Improvement of the Current Collection Performance for the Next Generation High-Speed Train (HEMU-430X) (차세대 고속철도의 집전성능 예측 및 향상 방안에 관한 연구)

  • Lee, Jin-Hee;Park, Tae-Won
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.5
    • /
    • pp.429-435
    • /
    • 2012
  • The HEMU-430X is a world-class railway vehicle which aimed the maximum speed of 430km/h and the operation speed of 370km/h. To maintain high-speed operation condition over 300km/h, various requirements for satisfy exist. However, one of the most important things is a reliable supply of electricity. Especially, the dynamic interaction between the pantograph and overhead contact line at high-speed is a significant matter to pre-evaluate. In this paper, using the dynamic interaction analysis program, current collection performance of the HEMU-430X was investigated. Firstly, based on the international standard, performance of the original specifications was evaluated. In addition, through study on changes in tension and span length, improvement of the performance was considered.

Mechanical Loads of Dropper for High Speed Electric Railway (고속 전차선로 드로퍼에 대한 기계적 하중에 관한 연구)

  • Lee, Gi-Chun;Lee, Tae-Hoon;Lee, Jong-Woo
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.3
    • /
    • pp.222-227
    • /
    • 2011
  • The dropper supports the contact wire and is attached using various types of dropper clips on the catenary. Droppers are subject to mechanical stress from buckling during the passage of pantographs. In order to investigate failure causes for the high speed line dropper, theoretical analyses and experiments have been carried out. In this paper, mathematical formulas are derived for the pre-sag of the dropper static load. The measured values in the experiment were similar to the theoretical predictions. To analyze the cause on fracture of dropper wire, we have conducted analysis such as SEM(Scanning Electron Microscope) of fractured specimens in the field and new specimens. Finally, we performed measurement for the variation of dynamic load on the dropper when a pantograph moved at 300km/h under the Korean high speed overhead line. If such mechanical load occur repeatedly with every passing pantograph, it is possible that the dropper wire will break due to fatigue. This results will be used for special management of high speed catenary system maintenance and life estimation of dropper.

Simulation and Testing of the Effect of Current Collection Performance According to Pre-sag in 400km/h Overhead Contact Lines (400km/h 전차선로에서 사전이도가 집전성능에 미치는 영향에 대한 시뮬레이션 및 시험)

  • Kwon, Sam Young;Cho, Yong Hyeon;Lee, Kiwon;Oh, Hyuck Keun
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.3
    • /
    • pp.288-296
    • /
    • 2016
  • A 400km/h simple catenary system was constructed as a test line in Korea. In the design stage of this system, the pre-sag was one of the engineering issues most focused on. It is known that the pre-sag improves the current collection performance in a certain band of high speed. However, the effect of pre-sag at 400km/h has not yet been established. To grasp a better pre-sag in the 400km/h catenary, we transacted the dynamic performance prediction simulation between catenary and pantograph under conditions of 0 and 1/3000 pre-sag. The level of 0 pre-sag was adapted for the 400km/h catenary design after reviewing predictions. We constituted the 1/3000 pre-sag sample section (about 1km) while constructing the 400km/h catenary test-bed (28km) of 0 pre-sag. With a HEMU-430X train, the contact forces were measured in the test-bed including the pre-sag sample section. In this paper, the predicted and measured dynamic performance values (contact forces) for 0 and 1/3000 pre-sag are described and compared. It is conclusively confirmed by analytical and experimental examination that the non pre-sag showed better dynamic (current collection) performance than that of the 1/3000 pre-sag for the 400km/h catenary system.