• Title/Summary/Keyword: Overfill

Search Result 5, Processing Time 0.02 seconds

The implementation of cable path and overfill visualization based on cable occupancy rate in the Shipbuilding CAD (조선 CAD에서 선박의 Cable 점유율을 기반으로 Cable 경로 및 Overfill 가시화 구현)

  • Kim, Hyeon-Jae;Kim, Bong-Gi
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.11
    • /
    • pp.740-745
    • /
    • 2016
  • Cables are installed for tens of thousands of connections between various pieces of equipment to operate and control a commercial ship. The correct shortest-route data is necessary since these are complicated cable installations. Therefore, an overfill interval commonly exists in the shortest paths for cables as estimated by Dijkstra's algorithm, even if this algorithm is generally used. It is difficult for an electrical engineer to find the overfill interval in 3D cable models because the occupancy rate data exist in a data sheet unlinked to three-dimensional (3D) computer-aided design (CAD). The purpose of this study is to suggest a visualization method that displays the cable path and overfill interval in 3D CAD. This method also provides various color visualizations for different overfill ranges to easily determine the overfill interval. This method can reduce cable-installation man-hours from 7,000 to 5,600 thanks to a decreased re-installation rate, because the cable length calculation's accuracy is raised through fast and accurate reviews based on 3D cable visualization. As a result, material costs can also be reduced.

Implementation of Efficient Cable Spreading Algorithm and Automation Program for Electrical Equipment in Power Plant (발전소 전기설비를 위한 효과적인 케이블 포설 알고리즘 및 자동화 프로그램 구현)

  • Park, Ki-Hong;Kang, An Na;Choi, Hyo Beom;Lee, Yang Sun
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.18 no.9
    • /
    • pp.2229-2236
    • /
    • 2014
  • In this paper, we proposed and implemented the automated cable-spreading program which can be done effectively cabling plan for electrical equipment in power plant. Cause the process of existing cable-spreading design was written in by hand, there are grossly inefficient gain by a personal and time investment with cable omission and unfixed overfill value. Proposed automation program for cable-spreading, which is coded cable and raceway, can calculate the overfill value and raceway change. Some experiments are conducted so as to verify the proposed model, and as a result, implemented cable-spreading program is well performed.

Sensor Fault Detection and Analysis of Fault Status using Smart Sensor Modeling

  • Kim, Sung-Shin;Baek, Gyeong-Dong;Lee, Soo-Jin;Jeon, Tae-Ryong
    • Journal of information and communication convergence engineering
    • /
    • v.6 no.2
    • /
    • pp.207-212
    • /
    • 2008
  • There are several sensors in the liquid cargo ship. In the liquid cargo ship, we can get values from various sensors that are level sensor, temperature sensor, pressure sensor, oxygen sensor, VOCs sensor, high overfill sensor, etc. It is important to guarantee the reliability of sensors. In order to guarantee the reliability of sensors, we have to study the diagnosis of sensor fault. The technology of smart sensor is widely used. In this paper, the technology of smart sensor is applied to diagnosis of level sensor fault for liquid cargo ship. In order to diagnose sensor fault and find the sensor position, in this paper, we proposed algorithms of diagnosis of sensor fault using independent sensor diagnosis unit and self fault diagnosis using sensor modeling. Proposed methods are demonstrated by experiment and simulation. The results show that the proposed approach is useful. Proposed methods are useful to develop smart level sensor.

Surgical management of a failed internal root resorption treatment: a histological and clinical

  • Asgary, Saeed;Eghbal, Mohammad Jafar;Mehrdad, Leili;Kheirieh, Sanam;Nosrat, Ali
    • Restorative Dentistry and Endodontics
    • /
    • v.39 no.2
    • /
    • pp.137-142
    • /
    • 2014
  • This article presents the successful surgical management of a failed mineral trioxide aggregate (MTA) orthograde obturation of a tooth with a history of impact trauma and perforated internal root resorption. A symptomatic maxillary lateral incisor with a history of perforation due to internal root resorption and nonsurgical repair using MTA was referred. Unintentional overfill of the defect with MTA had occurred 4 yr before the initial visit. The excess MTA had since disappeared, and a radiolucent lesion adjacent to the perforation site was evident radiographically. Surgical endodontic retreatment was performed using calcium enriched mixture (CEM) cement as a repair material. Histological examination of the lesion revealed granulation tissue with chronic inflammation, and small fragments of MTA encapsulated within fibroconnective tissue. At the one and two year follow up exams, all signs and symptoms of disease had resolved and the tooth was functional. Complete radiographic healing of the lesion was observed two years after the initial visit. This case report illustrates how the selection of an appropriate approach to treatment of a perforation can affect the long term prognosis of a tooth. In addition, extrusion of MTA into a periradicular lesion should be avoided.

Predicting and Preventing Damages from Gas Leaks at LPG Stations (LPG 충전소의 가스누출에 따른 피해예측 및 감소방안)

  • YANG-HO YANG;HA-SUNG KONG
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.4
    • /
    • pp.577-585
    • /
    • 2023
  • This study applied ALOHA Program to predict the damage caused by fire and explosion predicted to occur from gas leakage at LPG stations and presented plans to prevent damages by diagramming the impact range and distance. The propane gas leakage from LPG stations causes human damage like breathing issues and property damage, including building destruction to residents in the surrounding areas. As a way to reduce this, first, the hazardous substance safety manager of the LPG station needs to check frequently whether the meters and safety valves are working properly to prevent leakage in advance. Second, the LPG stations' storage tanks should be worked by the person who received "hazardous substance safety manager training" under the provisions of the Act on the Safety Control of Hazardous Substances and has been appointed as a "hazardous substance safety manager" by the fire department. Third, LPG station's various safety device functions, such as overfill prevention devices, must be checked on a regular basis. Finally, wearing work clothes and shoes that prevent static electricity at LPG stations is highly recommended, as static can cause a fire when gas leaks.