• Title/Summary/Keyword: Osong High Speed Railway Station

Search Result 3, Processing Time 0.018 seconds

An Experimental Study on the Aerodynamic Effects Generated by a Train Passing Rear by Platform (철도차량의 승강장 통과시 발생하는 공기역학적 영향에 대한 실험적 연구)

  • Kim, Dong-Hyeon;Kwon, Hyeok-Bin;Kim, Do-Hoon;Kim, Moon-Hun;Song, Moon-Shuk
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.28 no.6
    • /
    • pp.734-739
    • /
    • 2004
  • The aerodynamic effect on platform during the train passage, the results of field test on the high-speed railway platform are discussed and the whole test results and conclusions are synthesized. The field test for the high-speed railway have been conducted on the Osong temporary platform in the newly constructed Seoul-Busan high-speed line and total 12 measurements have been conducted for G7 train and KTX train. The results shows that the high-speed trains have similar aerodynamic characteristics and have far better characteristics referring to the conventional trains such as Saemaul and Mugungwha trains. To discuss the actual aerodynamic effects on the platform at its own operational speed, Beaufort wind scale have been introduced and the criteria for the safety on railway platform has also been discussed.

Method for increasing rail operation capacity of capital high speed rail with expanding the high speed railway service (고속철도 서비스 확대를 위한 수도권 고속철도 확충 방안 고찰)

  • Roh, Beung-Guk;Kim, Young-Bea;Shin, Dong-Won
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1254-1268
    • /
    • 2009
  • In 1998, because of the economic crisis called IMF Crisis in Korea, Kyungbu high speed railway project could run by modifying the original plan to open it as a 1st phase only by utilizing the existing railway lines from Seoul to Siheung and the other one from Daegu to Pusan. The modified plan includes that the line from Daegu to Pusan will be constructed as a second phase in next time. Starting railway operation with the changed plan, the combined application operation of high speed rail, passenger rail and freight rail was caused partly from Seoul to Siheung to run into capital area. As a result, the opinion for additional railway line construction is insisted continuously because the operation volume of passenger rail was forced to be reduced, the service quality of it was decreased and it became difficult to add new high speed services. Moreover, with regard to Honam high speed rail, the new construction plan of station in Kangnam metro area as a basement station for starting from Suseo was changed to the plan of turning out at Osong because of the economic effectiveness and this kept resident people in Kangnam metro area and southern Kyungki area unable to get the opportunity of high speed rail service benefit. After beginning of Kyungbu high speed railway operation, national transportation system developments are focused on high speed rail, and when the second phase construction of Kyungbu high speed rail, beginning operation of Kyungjeon line, Jeolla line double track construction, Honam high speed rail in 2014, is completed, the demand for high speed rail will be increased and it is unavoidable to make Kwangmyung station as a basement station and to reduce the number of passenger rail operation. At this moment, it is valuable to consider adding the railway line capacity in capital area to improve the transferring service for citizen who live in area without Kyungbu high speed rail station and to expand the service area from Kangbuk to Kangnam and southern Kyungki area. Accordingly, in this paper, the effective rail operation method, facility plan and the other issue to be reviewed for increasing capital high speed railway lines will be mentioned.

  • PDF

Development of Optimal Train Operation System in Bottle-neck Section According to the Opening of High Speed Railway in Seoul Metropolitan Area (수도권 고속철도개통에 따른 고속선 병목구간 최적열차운행 체계 연구)

  • Chun, Chunggeun;Chung, Sungbong;NamKung, Baekkyu
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.6
    • /
    • pp.631-637
    • /
    • 2012
  • New Opening of Suseo-Pyeongteak High Speed Railway (HSR) will be a new leap in the Korean railway history. However if this section of HSR line around Seoul Metropolitan Area opens, the confluence of new HSR and existing HSR line in Pyeongteak-Osong section will cause a bottle neck problem. In other words, the opening of Suseo-Pyeongteak HSR line will make the capacity of track reach the limit and the section of railroad between Pyeongteak and Osong will be saturated. This will also make such troubles as restricting the number of train which stops at Cheonan-Asan station. In this study, based on the train assignment theory of TVM430 signal system, the methods of calculating headway and number of train are reviewed and the plan for application of optimal operation pattern during peak hour between Pyeongteak-Osong section is also suggested. To remove the bottle neck problem in this HSR section, 3 alternatives are suggested and the expected effects and problems of each alternative are also analyzed. The results show that the troubles caused by excess of track capacity can be removed without any additional cost if the minimum headway in operating system for HSR is adopted in this section. In the future, if these alternatives are considered to the long-term plan for operating train and signal systems, this will improve the efficiency of train operation, which can remove the bottle neck in the HSR line.